You are on page 1of 6

VIGA CONTINUA DE CIMENTACION

6.00m 4.00m 1.00m

C1 C2 C3

Gt = 1.55 Kg/cm2
K= 2700 Tn/m2
f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
s/c = 300 Kg/cm2
NPT = 0.15 m
NFZ = -1.40 m

COLUMNA 1 COLUMNA 2 COLUMNA 2


PD= 25 PD= 48 PD= 48
PL= 10 PL= 22 PL= 22

DIRECCION LONGITUDINAL DIRECCION LONGITUDINAL DIRECCION LONGITUDINAL


MD= 1.05 MD= 1.2 MD= 1.2
ML= 0.48 ML= 0.72 ML= 0.72
MS= 9.55 MS= 12.55 MS= 12.55
PS= 12 PS= 14 PS= 14

DIRECCION TRANSVERSAL DIRECCION TRANSVERSAL DIRECCION TRANSVERSAL

MD= 0.78 MD= 1.02 MD= 1.02


ML= 0.42 ML= 0.52 ML= 0.52
MS= 7.45 MS= 8.55 MS= 8.55
PS= 8 PS= 11 PS= 11
S= 0.4 S= 0.4 S= 0.4
T= 0.3 T= 0.4 T= 0.4

1.ESFUERZO NETO DEL SUELO

Gn = 12.10 Tn/m2
Gns = 16.75 Tn/m2

2.DIMENSIONES EN PLANTA - CARGAS DE SERVICIO

A. CARGAS DE GRAVEDAD

P1 = 35 P2 = 70 P3 = 70
ML1 = 1.53 ML2 = 1.92 ML3 = 1.92
MT1 = 1.20 MT2 = 1.54 MT3 = 1.54

L1 = 6.00
L2 = 4.00
L= 11.20
R= 175
Xr = 6.631
e= 1.03

Az = 14.46 m2 L= 11.2 m
B= 1.29 m B= 2.5 m

G1 = 10.07 Tn/m2
G2 = 3.17 Tn/m2
G3 = 9.33 Tn/m2
G4 = 2.43 Tn/m2

B. CARGAS DE GRAVEDAD + SLH

P1 = 44.6 P2 = 81.2 P3 = 81.2


ML1 = 9.17 ML2 = 11.96 ML3 = 11.96
MT1 = 1.20 MT2 = 1.54 MT3 = 1.54

L1 = 6.00
L2 = 4.00
L= 11.20
R= 207
Xr = 6.636
e= 1.04

L= 11.2 m
B= 2.5 m

G1 = 11.86 Tn/m2
G2 = 3.66 Tn/m2
G3 = 11.13 Tn/m2
G4 = 2.92 Tn/m2

C. CARGAS DE GRAVEDAD + SLA

P1 = 25.4 P2 = 58.8 P3 = 58.8


ML1 = -6.11 ML2 = -8.12 ML3 = -8.12
MT1 = 1.20 MT2 = 1.54 MT3 = 1.54

L1 = 6.00
L2 = 4.00
L= 11.20
R= 143
Xr = 6.623
e= 1.02

L= 11.2 m
B= 2.5 m

G1 = 8.27 Tn/m2
G2 = 2.68 Tn/m2
G3 = 7.54 Tn/m2
G4 = 1.94 Tn/m2

D. CARGAS DE GRAVEDAD + STH

P1 = 41.4 P2 = 78.8 P3 = 78.8


ML1 = 1.53 ML2 = 1.92 ML3 = 1.92
MT1 = 7.16 MT2 = 8.38 MT3 = 8.38

L1 = 6.00
L2 = 4.00
L= 11.20
R= 199
Xr = 6.563
e= 0.96

L= 11.2 m
B= 2.5 m

G1 = 12.82 Tn/m2
G2 = 5.49 Tn/m2
G3 = 8.72 Tn/m2
G4 = 1.39 Tn/m2

E. CARGAS DE GRAVEDAD + STA

P1 = 28.6 P2 = 61.2 P3 = 61.2


ML1 = 1.53 ML2 = 1.92 ML3 = 1.92
MT1 = -4.76 MT2 = -5.30 MT3 = -5.30

L1 = 6.00
L2 = 4.00
L= 11.20
R= 151
Xr = 6.720
e= 1.12

L= 11.2 m
B= 2.5 m

G1 = 7.31 Tn/m2
G2 = 0.84 Tn/m2
G3 = 9.95 Tn/m2
G4 = 3.47 Tn/m2

3. ESFUERZOS ULTIMOS EN EL SUELO

P1 = 51.75 P2 = 98.5 P3 = 98.5


ML1 = 1.91 ML2 = 2.40 ML3 = 2.40
MT1 = 10.81 MT2 = 12.61 MT3 = 12.61

L1 = 6.00
L2 = 4.00
L= 11.20
R= 248.75
Xr = 6.563
e= 0.96

L= 11.2 m
B= 2.5 m

G1 = 16.55 Tn/m2
G2 = 7.39 Tn/m2
G3 = 10.38 Tn/m2
G4 = 1.21 Tn/m2

GU = 16.55 Tn/m2
WU 41.39 Tn/m2
4. DIMENSIONAMIENTO EN ALTURA

POR RIGIDEZ
E= 2173706.5
I= 0.1295
K= 2700

Lm = 6

Lm <= 6.29
6 <= 6.29 CUMPLE

POR RESISTENCIA

Mu = 122.4 ϕ= 0.007
ᵩ= 0.9
b= 250
ω= 0.14

d= 44.91
h= 60

Mu = 140.68 ϕ= 0.007
ᵩ= 0.9
b= 45
ω= 0.14

d= 113.48
h= 130

5. DISEÑO POR REFUERZO

5.1 DIAGRAMA DE MOMENTOS

MU(+) 125.67 Tn-m hz 50 cm


b 250.00 cm
fy 4200.00 kg/cm2
f´c 210.00 kg/cm2
d 120.78 cm
As 50.05 cm2
a 4.71 cm
As 28.07 cm2 AS 20.91 94.42884906
a 2.64 cm
As 27.83 cm2
a 2.62 cm
As-requerido 27.83 cm2
Asmin 22.5 cm2 3ф1" +3ф3/4 23.76 cm2

usar: 5ф1" + 2 ф3/4" 31.2 cm2

5.1 DIAGRAMA DE CORTANTES

ACERO LONGITUDINAL
Ac+5cm 45 cm

Øvc 35.2531722105 Tn
Vu 88 (a "d" del apoyo)
vc 52.7468277895 Tn
Vs 62.0550915171 Tn

S 32.3714446452 cm
usar 25 acero 5/8"

(MU-) 131.94 Tn-m hz 50 cm


b 250.00 cm d 41.505
fy 4200.00 kg/cm2
f´c 210.00 kg/cm2
d 120.78 cm
As 52.54 cm2
a 4.95 cm
As 29.50 cm2
a 2.78 cm
As 29.24 cm2
a 2.75 cm
As-requerido 29.23 cm2
Asmin 22.5 cm2

6. DISEÑO DE REFUERZO VIGA DE CIMENTACION- ACERO TRANSVERSAL


Refuerzo transversal
Lv 1.05
wu 16.55
Mu 9.12561855469
b 100.00 cm
fy 4200.00
f´c 210.00
d 40.78
As 10.76
a 2.53
As 6.11
a 1.44
As 6.03
a 1.42
As-requerido 6.02 cm2
As min 9 cm2
S 22 5/8 cada 20 cm

acero de temperatura en el alma


S<= 30 cm
S<= 20.13 cm
Asumir de 3/8 @ 20 cm repartido en todo el largo