NAME : GROUND FLOOR DB

PROJECT : JUMEIRAH PARK VILLAS FED FROM : MDB- 118


LOCATION : GROUND FLOOR

RATING OF INCOMER : 63A TP ISOLATOR LOAD DISTRIBUTION SCHEDULE JMP VILLA 118

RATING RATG. MCB CCT ECC NO OF POINTS LOAD IN


OF OF SL. CIR. RTG. WIRE WIRE LTG KW WATTS
ROOM/AREA REMARKS

OVEN
LTG Shaver ISOL SPUR 15 A 13 A UNITS
INCOMER ELCB NO. NO. IN SIZE SIZE W/H W/M D/W FCU CCU
POINTS socket O/L S/O O/L R Y B
Amp mm2 mm2
1 R1 10 2.5 2.5 PUMP 1 0.1 0.1
2 Y1 16 2.5 2.5 KITCHEN, MAID 15 0.1 1.5

3 B1 16 2.5 2.5 DINGING,LIVING 20 0.1 2

4 R2 16 2.5 2.5 GUEST, TOILETS 13 1 0.1/0.2 1.5


5 Y2 16 2.5 2.5 ENTRANCE 14 0.1 1.4
40A/100mA 4
pole ELCB-1 6 B2 16 2.5 2.5 GUEST AREA 15 0.1 1.5

7 R3 16 2.5 2.5 EXTERNAL 15 0.1 1.5 Photo cell

8 Y3 10 2.5 2.5 EXTERNAL 10 0.1 1 Photo cell

9 B3 10 2.5 2.5 EXTERNAL 10 0.1 1 Photo cell

10 R4 32 4 2.5 KITCHEN, MAID 1 6 0.2 1.4 RING


63A TPN
ISOLATOR 11 Y4 32 4 2.5 MAID,LAUNDARY,PARKING 5 0.2 1 RING
40A/30mA 4 12 B4 32 4 2.5 LIVING AREA,ENTRANCE 9 0.2 1.8 RING
pole ELCB-2
13 R5 20 4 2.5 GUEST BED 5 0.2 1
14 Y5 20 4 2.5 PASSAGE 2 0.2 0.4 ONU
15 B5 32 4 2.5 GUIEST AREA 6 0.2 1.2 RING
16 R6 20 4 2.5 KITCHEN 1 1 1
17 Y6 20 4 2.5 LAUNDARY 1 1 1

40A/30mA 4 18 B6 20 4 2.5 LAUNDARY 1 1 1


pole ELCB-3 19 R7 32 4 2.5 EXTERNAL 6 0.2 1.2 RING
20 Y7 32 6 4 PARKING 1 1
21 B7 32 SPARE 1.5
TOTAL LOAD
CABLE SIZE 4X1C 16 MM PVC/SC+ 1C 16..MM CU-ECC 7.7 6.3 10 24
PER PHASE
NAME : FIRST FLOOR DB
PROJECT : JUMEIRAH PARK VILLAS FED FROM : MDB-118
LOCATION : First Floor

RATING OF INCOMER : 40A TP ISOLATOR LOAD DISTRIBUTION SCHEDULE JMP VILLA 118

RATING RATG. MCB CCT ECC NO OF POINTS LOAD IN


OF OF SL. CIR. RTG. WIRE WIRE LTG KW WATTS
ROOM/AREA REMARKS

OVEN
LTG Shaver ISOL SPUR 15 A 13 A UNITS
INCOMER ELCB NO. NO. IN SIZE SIZE W/H W/M D/W FCU CCU
POINTS socket O/L S/O O/L R Y B
Amp mm2 mm2
1 R1 16 2.5 2.5 Bedroom I , Bedrrom II 10 2 0.1/0.2 1.4

2 Y1 10 2.5 2.5 Bedroom III 7 1 0.1/0.2 0.9

3 B1 10 2.5 2.5 Masters Bedroom, Balcony, study 11 1 0.1/0.2 1.3


40A/100mA 4
Sitting area , corridor , Terrace
pole ELCB-1 4 R2 16 2.5 2.5 20 0.1 2

5 Y2 10 2.5 2.5 Roof 10 0.1 1 Photo cell

6 B2 SPACE

6 R3 32 4 2.5 Bedroom I , Bedroom II 8 0.2 1.6 RING


40A TPN
ISOLATOR 7 Y3 20 4 2.5 Bedroom III 4 0.2 0.8

8 B3 32 4 2.5 Master's Bedroom 5 0.2 1 RING


40A/30mA 4
pole ELCB-2 9 R4 32 4 2.5 Sitting Area, study 7 0.2 1.4 RING

10 Y4 20 4 2.5 Corridor 4 0.2 0.8

11 B4 20 4 4 Roof 4 W/P 0.2 0.8


TOTAL LOAD
CABLE SIZE 4X1C 10 MM PVC/SC+ 1C 10..MM CU-ECC 6.4 3.5 3.1 13
PER PHASE
LOCATION : First Floor
PROJECT : JUMEIRAH PARK VILLAS FED FROM : MDB- 118 NAME:AC DB

RATING OF INCOMER : 100A TP ISOLATOR LOAD DISTRIBUTION SCHEDULE JMP VILLA 118

RATING RATG. MCB CCT ECC NO OF POINTS LOAD IN


OF OF SL. CIR. RTG. WIRE WIRE LTG KW WATTS
ROOM/AREA REMARKS

OVEN
LTG Shaver ISOL SPUR 15 A 13 A UNITS
INCOMER ELCB NO. NO. IN SIZE SIZE W/H W/M D/W CU FCU CCU
POINTS socket O/L S/O O/L R Y B
2 2
Amp mm mm

1 R1 25 6 6 Roof / V F 01 1 3.39 3.39 UVR + TIMER + CONTACTOR


40A/100mA 4
pole ELCB-2 2 Y1 20 6 6 Roof / V F 02 1 1.76 1.76 UVR + TIMER + CONTACTOR

3 B1 Space
40A/100mA 4
4 RYB 2 20 6 6 Roof / V F 03 1 4.48 1.49333 1.49333 1.493333 UVR + TIMER + CONTACTOR
pole ELCB-3
40A/100mA 4
5 RYB 3 20 6 6 Roof / V F 04 1 4.48 1.49333 1.49333 1.493333 UVR + TIMER + CONTACTOR
pole ELCB-4

6 R4 20 6 6 Roof / V F 05 1 1.76 1.76 UVR + TIMER + CONTACTOR


40A/100mA 4
pole ELCB-5 7 Y4 25 6 6 Roof / V F 06 1 2.15 2.15 UVR + TIMER + CONTACTOR

8 B4 20 6 6 Roof / V F 07 1 1.76 1.76 UVR + TIMER + CONTACTOR

9 R5 20 6 6 Roof / V F 08 1 1.76 1.76 UVR + TIMER + CONTACTOR


100A TPN 40A/100mA 4
10 Y5 25 6 6 Roof / V F 09 1 2.15 2.15 UVR + TIMER + CONTACTOR
ISOLATOR pole ELCB-6
11 B5 Spare 1.5

40A/100mA 4
12 RYB6 20 6 6 Roof / V G01 1 5.42 1.80667 1.80667 1.806667
pole ELCB-7

13 R7 25 6 6 Roof / V G02 1 2.15 2.15 UVR + TIMER + CONTACTOR


40A/100mA 4
14 Y7 25 6 6 Roof / V G04 1 2.15 2.15 UVR + TIMER + CONTACTOR
pole ELCB-8
15 B7 20 6 6 Roof / V G05 1 1.76 1.76 UVR + TIMER + CONTACTOR
40A/100mA 4
16 RYB 8 20 6 6 Roof / V G03 1 4.48 1.49333 1.49333 1.493333 UVR + TIMER + CONTACTOR
pole ELCB-9
17 R9 20 4 4 Booster Pump 1 0.7
40A/100mA 4
18 Y9 20 4 4 KEF 1 0.5
pole ELCB-10
19 B9 20 4 4 Circulator pump 1 0,5
TOTAL LOAD
CABLE SIZE 4X1C 35 MM PVC/SC+ 1C 16..MM CU-ECC 16.0467 14.9967 11.30667 42.35
PER PHASE
Owner: M/s Etjar investment L.L.C
Consultant : Modular engineering consultant

Summary OF MDB
ROJECT: Jumeirah villas , DUBAI-UAE
LOCATION OF MDB: Boundary wall
DETAILS OF CONNECTED LOAD/ MAX DEMAND
FED FORM : Meter Cabinet AREA: Jumeirah Park
MDB PLOT: JMP 118
RATING AMPS CABLE SIZE CONNECTED LOAD KW
CIRCUIT/ FEEDER DB FAULT PVC/XLPE/ ECC SIZE
NO SP/TP ACB DUTY Ka SWA/PVC
CON. KW 1PH (1) 3-PH (2) 3PH (3) CT (4) REMARKS
NO. FS/ISO MCCB 2/4 X 1C 2/3/4 C mm 1C mm R-PH KW Y-PH KW B-PH KW
INCOMER
4p 200 50 XLPE/SWA/PVC 4C X95 1C X 50
O U T G O I N G 200A TP ISOLATOR WITH 4C*95mm2 XLPE/SWA PVC + 1C*50mm2 ECC
DB-GF TP 63 50 XLPE/SWA/PVC 4C,16 1C,16 7.7 6.3 10 24
DB-FF TP 40 50 XLPE/SWA/PVC 4C,10 1C,10 6.4 3.5 3.1 13
DB-AC TP 100 50 XLPE/SWA/PVC 4C,35 1C,16 12.66 16.626 13.066 42.35
Solar Heater TP 20 50 XLPE/SWA/PVC 4C,6 1C,6 1.5 1.5 1.5 4.5 100ma ELCB
FAHU / CU TP 32 50 XLPE/SWA/PVC 4C,10 1C,10 2 2 2 6 100ma ELCB
FAHU TP 20 50 XLPE/SWA/PVC 4C,6 1C,6 0.666 0.666 0.666 2 100ma ELCB
Home Automation TP 20 50 XLPE/SWA/PVC 4C,4 1C,4 0.5 0.5 0.5 1.5 100ma ELCB
Swimming pool TP 32 50 XLPE/SWA/PVC 4C,6 1C,6 2 2 2 6 100ma ELCB
Future load TP 20 XLPE/SWA/PVC 0.333 0.333 0.333 1 100ma ELCB
Water transfer Pump TP 20 50 XLPE/SWA/PVC 4C,4 1C,4 0.5 0.5 0.5 1.5 100ma ELCB
MDB CONNECTED TO METER BOX
TOTAL CONNECTED LOAD PER PHASE 34.256 33.925 33.665 101.849 TOTAL
DB CONNECTED TO MDB
MAX.DEMAND (3PH) 89.72 AT 0.85 DIVERSITY TOTAL CONNECTED LOAD (3PH)
CONTRACTOR: ADVANCED VISION ELE LLC. TEL: 2574465 TYPE OF METER (RATING OF INCOMER) - PROVIDE CT-METER WHEN MAX. DEMAND ---> 100KW (1) 1PH 60A (2) 3PH 100A (3)
Owner: M/s Etjar investment L.L.C
Consultant : Modular engineering consultant
ROJECT: Jumeirah villas , DUBAI-UAE
LOCATION OF DB: Boundary wall
DETAILS OF CONNECTED LOAD/ MAX DEMAND
Meter box connected to feeder AREA: Jumeirah Park
PLOT: JMP 118
RATING AMPS CABLE SIZE CONNECTED LOAD KW
CIRCUIT/ FEEDER DB FAULT PVC/XLPE/ ECC SIZE
NO SP/TP ACB DUTY Ka SWA/PVC 2/3/4 C CON. KW 1PH (1) 3-PH (2) 3PH (3) CT (4) REMARKS
NO. FS/ISO MCCB 2/4 X 1C 1C mm R-PH KW Y-PH KW B-PH KW
mm
INCOMER
TP 200 50 XLPE/SWA/PVC BY DEWA 34.469 29.89 31.019 95.377
O U T G O I N G 200A TP ISOLATOR
Meter Cabinet TP 200 50 BY DEWA 34.256 33.925 33.665 101.846 1 200/5

METER BOX connected to Dewa Feeder


TOTAL CONNECTED LOAD PER PHASE 34.256 33.925 33.665 101.846 1 TOTAL
DB CONNECTED TO MDB
MAX.DEMAND (3PH) 89.72 AT 0.85 DIVERSITY TOTAL CONNECTED LOAD (3PH)
CONTRACTOR: ADVANCED VISION ELE LLC. TEL: 2574465 TYPE OF METER (RATING OF INCOMER) - PROVIDE CT-METER WHEN MAX. DEMAND ---> 100KW (1) 1PH 60A (2) 3PH 100A
Owner: M/s Etjar investment L.L.C
Consultant : Modular engineering consultant
ROJECT: Jumeirah villas , DUBAI-UAE
LOCATION OF MDB: Boundary Wall
DETAILS OF CONNECTED LOAD/ MAX DEMAND
FED FORM : Meter cabinet AREA: Jumeirah Park
MDB PLOT: jmp 118
RATING AMPS CABLE SIZE CONNECTED LOAD KW
CIRCUIT/ FEEDER DB FAULT PVC/XLPE/ ECC SIZE
NO SP/TP ACB DUTY Ka SWA/PVC 2/3/4 C CON. KW 1PH (1) 3-PH (2) 3PH (3) CT (4) REMARKS
NO. FS/ISO MCCB 2/4 X 1C 1C mm R-PH KW Y-PH KW B-PH KW
mm
INCOMER
Incomer TP 200 50 XLPE/SWA/PVC BY DEWA
O U T G O I N G 200A TP ISOLATOR
Outgoing
MDB TP 200 35 BY DEWA 34.256 33.925 33.665 101.846

MDB CONNECTED TO METER BOX


TOTAL CONNECTED LOAD PER PHASE 34.256 33.925 33.665 101.846 TOTAL
DB CONNECTED TO MDB
MAX.DEMAND (3PH) 89.72 AT 0.85 DIVERSITY TOTAL CONNECTED LOAD (3PH)
CONTRACTOR: ADVANCED VISION ELE LLC. TEL: 2574465 TYPE OF METER (RATING OF INCOMER) - PROVIDE CT-METER WHEN MAX. DEMAND ---> 100KW (1) 1PH 60A (2) 3PH 100A