Professional Documents
Culture Documents
8 Runner System PDF
8 Runner System PDF
Mikó Balázs
miko.balazs@bgk.bmf.hu Content
BAGIM1ENNB
Identification of injection location
Design and manufacturing of
Cold sprue
plastic injection mould
Runner system
Type of gates
08 – Runner system Hot drop
Hot runner
1 2
3 4
5 6
1
Fill time Injection pressure
7 8
9 10
11 12
2
Sprue bushing Sprue bushing
R 0 / 15,5 / 40
0,5°/ 1°
R0,5 / R2
13 14
Rs > Rm 15 16
1968
1804
1640
Optimal cross section
1476
1312 0,7 mm Simple manufacturing
1148
984
820
656
492 0,55 mm
328
164
0 0,4 mm
17 18
3
Balancing Natural balancing
19 20
A
A/2 * 2/3 A/2
21 22
Collect the not too good quality material of the melt front.
23 24
4
Runner diameter Runner size
25 26
82 82 12 mm
12 mm
65,6 65,6 11 mm
11 mm
49,2 49,2 10 mm
10 mm
32,8 32,8 8 mm
cm3/s
cm3/s
8 mm
6 mm
16,4 6 mm
16,4
4,5 mm 4,5 mm
3 mm 3 mm
0 0
0 76,2 152,4 228,6 304,8 0 76,2 152,4 228,6 304,8
27 28
5
Sprue gate Edge gate / Side gate / Fan gate
31 32
33 34
35 36
6
Tab gate Diaphragm gate
37 38
39 40
41 42
7
Submarine gate / Tunnel gate Submarine gate / Tunnel gate
43 44
45 46
Curved tunnel gate / Banana gate Curved tunnel gate / Banana gate
47 48
8
Hot runner system System elements
Temperature
control
Less material cost (no waste) Manifold Electric
connector
system
Hot drop
49 50
Valve gate
Special
Complex
The order of opening is programmable
Pneumatic of electro magnetic actuator
51 52
Typical use: long parts
Material
Weight
Cycle time
ASK HELP
FROM THE
DISTRIBUTOR!
53 54
9
Combined single nozzle system New trends
More waste
Cheaper mould
Typical use: Deep cavity and high A plate
10