0% found this document useful (0 votes)
70 views1 page

B-10 - Beam

The document contains a bill of materials listing various steel parts including their designations, materials, lengths, quantities, and weights. It includes plates, wide flange beams, and bolts made of SS400 steel in lengths ranging from 47 to 300mm. A total of 1340kg of material is required. Engineering drawings show the layout and connections of the listed components.

Uploaded by

Mj Edin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

B-10 - Beam

The document contains a bill of materials listing various steel parts including their designations, materials, lengths, quantities, and weights. It includes plates, wide flange beams, and bolts made of SS400 steel in lengths ranging from 47 to 300mm. A total of 1340kg of material is required. Engineering drawings show the layout and connections of the listed components.

Uploaded by

Mj Edin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

HEAD MARK POST MARK MATERIAL + GRADE LENGTH QTY WEIGHT kg

UNIT TOTAL
PDP-B-10=1 REQ'D
h-3 WF-200X100X5.5X8 SS400 316 2
p-6 PL6*47 SS400 184 5
p-13 PL10*100 SS400 300 2
p-17 PL8*167 SS400 120 2
p-26 PL8*100 SS400 190 1
w-8 WF-200X100X5.5X8 SS400 5730 1

BOLT Ø 16 8.8XOX 45 16

1340 1500 1500 1390

25 25
p-17 p-17
p-26

p-6
10 5730 10
299 5125 305
25 25
A 4 Ø 18 HLS
B C B A
40

w-8 WF-200X100X5.5X8
p-6

p-6

60
60

p-17

p-17
80
60

p-26
80

8 Ø 18 HLS h-3
h-3
p-13

A-A A
B C B A
5750

42 78
300 190
28 90 50
60 80 60 60 40 55 80 55 p-26
p-6

30
p-17
2 Ø 18 HLS

50

60
25

p-17
27 287 p-13 p-26
8 Ø 18 HLS
p-6

50
100

167
47
50

50

80
h-3 2 Ø 18 HLS

87
88

25

25
184

20
4 Ø 18 HLS
120
B-B C-C

PDP-B-10=1 REQ'D

MAIN CONTRACTOR OWNER/CLIENT KEY PLAN PROJECT NAME REFF. DRAWING REV.
NO REVISION BY DATE APPROVED BY SIGN DATE
PT. GARUDA FOOD
SHOP DRAWING PDP
MK/CONSULTAN SE ARCHITECTURE
PT. SENTOSA TEKNIK MANDIRI 0 ISSUED FOR CONSTRUCTION MA 14-07-2018 GARUDAFOOD
.............................
DESIGN ARCHITECTURE SE STRUCTURE
SCALE : NTS SIGN DATE
SUB CONTRACTOR ............................. DRAWING NAME DRAWING No. REV.
DESIGN STRUCTURE SE M&E BEAM
DRAWN BY : 14.07.2018
............................. PDP-B-10
DESIGN M&E MK/OWNER 0
CHECKED BY : 14.07.2018 MODUL 6M
.............................