Professional Documents
Culture Documents
SPECIAL NOTES :-
10800
E AFTER LAYING THE SERVICES .
13100
A SLOPE SLOPE A LEGEND :-
D 1820 A 1820
GI PRECOATED EL -ELEVATION LEVEL
10350
LOUVERS LINE
SLOPE SLOPE B FFL -FINISH FLOOR LEVEL
4230
4230
C
FGL -FINISH GROUND LEVEL
B
RWDT -RAIN WATER DOWNTAKE
TYP -TYPICAL
24000
SLOPE SLOPE A EQ -EQUAL
10280
THK -THICKNESS
C D PROCESS PLANT LVL -LEVEL
0.6MM TCT SANDING
SEAM GI PRE COATED First floor area diagram TOR -TOP OF ROAD
ROOF TOC
C -TOP OF CONCRETE
SLOPE SLOPE
SAFETY ROPE
3150
B
SLOPE SLOPE 900 (BY PEB VENDOR ) A. 13.10X12 =157.2 SQ.M HOLD:-
PLATFORM @5M LVL B 4.23X1.82 =7.69 SQ.M
C. 4.23X1.82 =7.69 SQ.M 1. RL OF SITE .
2. ELECTRICAL ROOM INTERNAL LAYOUT.
A TOTAL (A+B+C)= 172.58 SQ.M 3.INSTRUMENTATIN PANNEL INTERNAL LAYOUT
1250
PROCESS PLANT 0° (PN)
MONITOR ROOF
WITH GI PRE B Ground Floor Area Diagram
1 2
COATED 3 4
270° 90°
LOUVERS
A. 24.0X12 =288.0 SQ.M G I D C ROAD
180°
380.00
EXIT
6.00
GATE
18.87
19.21
9.00
9.00
9.00 M WIDE ROAD 9.00 M WIDE ROAD 9.00 M WIDE ROAD
22.66 30.00 4.96
7.60 4.46 7.80 103.00
6.36 4.91
PARKING - 2 83
9.50
LIPL PLOT 6.00 26.54
12.68
(331.35 M²) 62.40
7.20
6.00M WIDE ROAD
BOUNDRY
16.57
80
8.46
8.71
3.87
(TYP.) 56 MANUFACTURING 59 PARKING-4 (1706.98 M²)
21.69
OFFICE 8.83
PATHWAY
3.90
WORKER 4.46 59A
ENTRY
2.70
C. 10.8X1.25 = 13.6 SQ.M
20.00
16.18
65 65-A
55 1.20
12 M WIDE ROAD
24.36
53
INTERMEDIATE
48.06
14.71 27.83
24.00 71.26 21.00 3.04
77.47
PARKING - 1 (2082.98 M²)
2050.68 M² 61 116.26
15.07
WASTE 58 84 9.00 9.00
HANDLING
54 RM STORE PROCESS C3
23.70
AREA
30.00
PLANT
(F G WAREHOUSE) C.O.P.-3
TEMPORARY
801.44 M²
8.63
85 WARE
SHED FOR
54A BATTERY CHARGER
HOUSE
16.77 24.23
10.63
ROOF PLAN
5.00 6.00
16.83
E. 10.8X1.25 =13.6 SQ.M
PARKING-3 PIZZA SHED 6.00 M WIDE ROAD 6.00 M WIDE ROAD
(421.92M²)
43.13
12.00 25.07
3.70
F(ii)
12.00
12M WIDE ROAD C4
12.00
12M WIDE ROAD 64
27.31
14.25 C.O.P. - 4
62
= 1696.07 M²
35.00
6.00 142.05
F(i) 3.00 62.75
21.55
57
C2
6.69
27.01
18.29
ELECTRICAL
7.13 85.00 41.00
ROOM
11.46
C.O.P. - 2 = 3836.30 M²
4.03
6.00 19.43 69
11.00
PARKING - 6
451.00 M²
Formal Dehydrate
5.00
40.54
Tank
6.00
6M WIDE ROAD 6M WIDE ROAD 6M WIDE ROAD 6M WIDE ROAD
21.30 17.40
44.00 15.23 5.90 27.00 21.00 25.50 15.50
2.75
5.95 C5
6.00
5.90
RAMP BPO
24.65
15.00
06/A C.O.P. - 5
33
6M WIDE ROAD
PARKING -7 WAC = 443.82 M²
24.50
9M WIDE ROAD
823.34 M² COLD 12.60
27.50
01 STORAGE
C1
LAYDOWN AREA
3.00
04 POLYMERI-
47.90
12.60
C.O.P.- 1 36 SATION 07
34.50
PACKING,
2107.77 M² WAREHOUSE UPW & MB 06
3.05
LPT WASTE
7.00
HANDLING
15.30
10.60 AREA
9.60
350.00
01/A 15.50 4M WIDE ROAD 70/A
18.00
32/A
6M WIDE ROAD
3.00 45.00 30.00
15.30
24.00
24.50
SAC II PLANT SOLID
SAC STORAGE 70
25.00
6M WIDE ROAD 18.85 4M WIDE ROAD
17.00
OCTADEINE DRUM
14.45
02 11.00 STORAGE SHED LPT WASTE
30.50
19.97 4.50 7.66 HANDLING
16.06 25.00
5.70
7.42
AMINATION 40A
18.86 19.00 43 COLD STORAGE AREA
6.52
6M WIDE ROAD
21.00 (PETROLEUM
7.46
GR.
6M WIDE ROAD
40 PRODUCTS)
2.00
CANTEEN 6.92
11.00 19.50
7.00
30
LOCKER &
6.58
6.17 7.46
SHOWER
PARKING -16
52/A 35
= 229.35 M²
09
3.00
6M WIDE ROAD
9M WIDE ROAD
29.95
PARKING -8
31
615.97 M²
PARKING -9
1122.92 M²
34
35.00
1st FLOOR
28.58
30 G.F
44.00
44.00
35.00
WELFARE LPT SUBSTATION
36.50
03
17.50
LABORATORY
16.00
FACILITY (1st FLR.) 20.30
DISPENSARY 52 PARKING -10 &
CME
3.00
28 = 671.60 M² CONTROL ROOM C6
SECURITY
28.00
19.00 24.50 (2nd FLR.) 39
OFFICE
SECURITY 29
&TIME
C.O.P. - 6
27.20
METHYL
3.05 08 CHLORIDE
CABIN-1 STORAGE 8.80 481.03 M²
PARKING-11
11.00
11.00
365.73 M² PARKING -12
3.56
8.00
37 = 504.62 M²
6.82 14.00 22.75 23.99 33.25 14.10 14.10 7.85 10.00
18.33 9.09
GATE
9M WIDE ROAD 6.00M. WIDE ROAD
MAIN
18.49
9M WIDE ROAD
3.00
3.00
PARKING-14 = (365.73 M²) PARKING -15 = 261.00 M²
68.73 87.00
4.30
23.91
16.60
19.88 20.00 49 H2
24.23 6.99 UNLOADG. MEK TANK FARM 3.00
STATION FGL. +34.0
14.23
6M WIDE ROAD
PARKING-13
39.56
(H-10M) 945.87 M² 3.25
35.00
55.60
ADMIN 6.0 M WIDE ROAD
3.70
25.50
21.42
550.00
42 46
4.08
7.45
PASTILLATION UNIT
44F
9.08
5.23
3.06 9.95 8.04 48.23
TOC.
70.19
14.23
+34.30 44
4010/4020 PLANT
TO.PRO.
44/B
4.70
14.80
+34.45
5.50
4.50 M WIDE ROAD 6.50 H.S. UNIT 11.50
13.50
2.23
4.14
4.53
10.41
2.68
2.89
2.57
1.24
12.33
101.15
6.0 M WIDE ROAD
11.0 M WIDE ROAD
OPEN PLOT AREA
6.45
2.60
AII Drum 51.80
2.15 Storage Area 68 29.00
6M WIDE ROAD
41
35.30
1.00
14.90
7.26
FINISH GOODS 47
67 1.55 1.53 5.00
16.30
A.G. TANK 12.22
20.50
11.80
46
11.65
41A FARM
8.73
8.90
48
15.15
6.10
7.18
7.51
PARKING-18 FGL. +34.0
3.34
162.88 M² FGL. +34.0
U.G. TANKFARM
24.67
12.97
17.96
6.0 M WIDE ROAD 6.0 M WIDE ROAD 6.0 M WIDE ROAD
69.98
9.56 25.00
8.38
PARKING -19 = 586.62 M²
130.00 N/G
17 METERING BOILER-1
19.00 6.00 19.50 26U001
16.00
N/G
18 CLEANING
13
CO GENERATION 6.00m. Wide Road
16
19
54.50
3.00
4M WIDE ROAD
MAIN LAHS STORAGE
9M WIDE ROAD
ENGG.
20
WORKSHOP
6.00
TECH
21
STORAGE
2.00
14 NITROGEN PSA UNIT
78.91 O/O 15.23 20.30
0.48
13.50
28.19
61.00
6M WIDE ROAD
1.50
65.50
4.59
6M WIDE ROAD
29.00 73.00 79
11.62
PARKING-20
1.20
0.48
1.50
= 848.10 M²
170.00
11 3.00
39.50
DMW 105.11
10
10.92
PLANT
FIRE & RAW
C7 C.O.P. - 7 = 1132.05 M²
12 WATER TANK
6.00m. Wide Road
1.79
5.04
27.67 17.16
13.90 5.06 27.80
9.00 30.69
16.00
3.81
4.5m Road
Contractor Cabin
7.50
21.09
41.16
PARKING-22 Sewage
40.45
71 4.39
18.14
= 2050.21 M² Treatment 73
Plant Engineering Store
2.50
74
Welfare Facility -
18.23
9.25 Contractor
9.31 94.27
6.00
72
4.50
16.11
WEIGH BRIDGE
6.50
(PROPOSED) WEIGH BRIDGE
CABIN 6M WIDE ROAD
15
15.00
42.50
50.00
EFFLUENT TREATMENT 23
6M WIDE ROAD
6M WIDE ROAD
PLANT
20.00
31.27
25.00
PARKING -24 25
22 = 1328.98 M²
19.63 SWITCH YARD
ETP
8.33
STORAGE
30.00
HUTCH 12.45 SHED 57.00 11.44
TOWER
15A
SECURITY
5.00
2.10
13.70
6M WIDE ROAD 15A CABIN-2
9.88
230.00
MATERIAL
ENTRY GATE - II
GIDC ROAD
SITE PLAN
www.aryaengineers.com