You are on page 1of 1

0° (PN) NOTES :-

1.LL DIMENSIONS ARE IN MM AND LEVELS IN METER


270° 90° 2.LL EXTERNAL WALLS ARE 230 THK, BRICK WALL DULY PLASTERED AND PAINTED AS
PER SPECIFICATINS.
3.LL INTERNAL WALLS ARE 230 THK, BRICK WALL DULY PLASTERED AND PAINTED AS
180° PER SPECIFICATINS.
4.FGL +/-0.00 CORRESPONDS TO RL 34.0 AT SITE
HOLD

SPECIAL NOTES :-

1. USE 245 MPA STANDING SEAM GI SHEET FOR ROOF .


2 . GRADE SLAB OF FGWH TO BE DESIGNED FOR 5 TONES /SQMT UNLESS NOTED
OTHERWISE
3. ALL RAILING ON PLATFORM AND BOTH STAIRS IN PEB SCOPE .
4. ROOF MONITOR :
5. PEB VENDOR SHOULD PROVIDE NOS. BASED ON CALCULATIONS FOR VENTILATION
REQUIRMENT AS PER NBC CODE
6. PLEASE CONSIDER SFETY LINE /ROPE ON STANDING SEAM ROOF OF PLANT
BUILDING IN PEB COST.
7. ALL MONITOR ROOF LOUVER SHALL BE GI PRECOATED 0.55TCT PLAIN SHEET .
8. THIS DRAWINGS SHALL BE READ IN CONJUNCTION WITH PLOT PLAN NO. .....................
AND CONTOUR MAP NO....................
9. ALL FFL SHALL BE 450 MM ABOVE FGL FOR PROCESS PLANT AND 1000MM ABOVE
FOR FG WARE HOUSE
B GI PRECOATED 10. PRIMARY BEAMS AND COLUMNS ARE BOLTED WHILE SECONDARY & TURSIARY
LOUVERS LINE
BEAMS CAN BOLTED OR WELDED AS PER SITE CONDITION.
11. BOLTED STRUCTURAL MEMBERS TO BE PROVIDED IN GRID .
G 12. ALL BOTTOM OF BASE PLATE , TOE PLATE SHALL BE 300 ABOVE FFL .
SLOPE SLOPE
13. ALL CUTOUTS SHALL BE OPENABLE TYPE ,FAN CUTOUTS AND SUPPORTING
160 MM DIA
F
PVC DOWN
FRAMES SHALL BE PROVIDED BY VENDOR NEAR EQUIPMENT .
TAKE PIPE 14. NO VERTICAL BRACING ALLOWED WHERE PIPING ,CABLE ,TRAY AND OTHER
SLOPE SLOPE
TURBO
UTILITIES ARE ENTERING .
VENTILATOR 15. ROLLING SHUTTERS DOORS ,WINDOWS , FAN , CUTOUTS AND SUPPORTINGS
FRAMES SHALL BE PROVIDED BY VENDOR WITH CCANOPY AND BRACKETS WITH
SHEETING FOR RAIN PROTACTION BY PEB VENDOR .
EAVES 16. FOR EQUIPMENT LOAD :REFER EQUIPMENT LIST / LAYOUT .
GUTTER 17. NO GRADE FLOOR SHALL BE CAST DIRECTLY AGAINST STRUCTURAL ELEMENTS OF
SLOPE SLOPE SLOPE SLOPE THE BUILDING LIKE FOUNDATION ,COLUMN ,BEAMS ,WALLS , ETC . SUITABLE
1250 SEPERATING MATERIAL SHALL BE PLACED AGAINST THE STRUCTURAL ELEMENTS
E
BEFORE CASTING CONCRETE UNLESS NOTED OTHEWISE .
12000 18. PEB CONTRACTOR TO PROVIDE OPENING IN WALL /ROOF / SHEETING AND
CHEQUERED PLATE FOR ELECTRICAL /INSTRUMENTATION /MECHANICAL/PIPING AS
12000 PER LAYOUT DRAWING , CLOSING OF OPENING AND MAKING GOOD THE
3150 CIVIL/STRUCTURAL WORK SHALL BE DONE BY RESPEVTIVE CONTRACTORS .

10800
E AFTER LAYING THE SERVICES .

13100
A SLOPE SLOPE A LEGEND :-
D 1820 A 1820
GI PRECOATED EL -ELEVATION LEVEL

10350
LOUVERS LINE
SLOPE SLOPE B FFL -FINISH FLOOR LEVEL

4230

4230
C
FGL -FINISH GROUND LEVEL
B
RWDT -RAIN WATER DOWNTAKE
TYP -TYPICAL

24000
SLOPE SLOPE A EQ -EQUAL

10280
THK -THICKNESS
C D PROCESS PLANT LVL -LEVEL
0.6MM TCT SANDING
SEAM GI PRE COATED First floor area diagram TOR -TOP OF ROAD
ROOF TOC
C -TOP OF CONCRETE
SLOPE SLOPE
SAFETY ROPE
3150
B
SLOPE SLOPE 900 (BY PEB VENDOR ) A. 13.10X12 =157.2 SQ.M HOLD:-
PLATFORM @5M LVL B 4.23X1.82 =7.69 SQ.M
C. 4.23X1.82 =7.69 SQ.M 1. RL OF SITE .
2. ELECTRICAL ROOM INTERNAL LAYOUT.
A TOTAL (A+B+C)= 172.58 SQ.M 3.INSTRUMENTATIN PANNEL INTERNAL LAYOUT
1250
PROCESS PLANT 0° (PN)
MONITOR ROOF
WITH GI PRE B Ground Floor Area Diagram
1 2
COATED 3 4
270° 90°
LOUVERS
A. 24.0X12 =288.0 SQ.M G I D C ROAD

180°
380.00

EXIT

6.00
GATE

B. 10.35X 3.15=32.60 SQ.M

18.87

19.21
9.00

9.00
9.00 M WIDE ROAD 9.00 M WIDE ROAD 9.00 M WIDE ROAD
22.66 30.00 4.96
7.60 4.46 7.80 103.00

6.36 4.91
PARKING - 2 83

9.50
LIPL PLOT 6.00 26.54

12.68
(331.35 M²) 62.40

7.20
6.00M WIDE ROAD
BOUNDRY

16.57
80

8.46
8.71

3.87
(TYP.) 56 MANUFACTURING 59 PARKING-4 (1706.98 M²)

21.69
OFFICE 8.83
PATHWAY

3.90
WORKER 4.46 59A
ENTRY

2.70
C. 10.8X1.25 = 13.6 SQ.M

20.00
16.18
65 65-A
55 1.20

12 M WIDE ROAD

24.36
53
INTERMEDIATE

9.00M WIDE ROAD


WAREHOUSE PRODUCTION PLANT 8.25 60

48.06
14.71 27.83
24.00 71.26 21.00 3.04

12M WIDE ROAD


PARKING-5

77.47
PARKING - 1 (2082.98 M²)
2050.68 M² 61 116.26

D. 10.28X3.16 =32.38 SQ.M THIS AREA

15.07
WASTE 58 84 9.00 9.00
HANDLING
54 RM STORE PROCESS C3

23.70
AREA

30.00
PLANT
(F G WAREHOUSE) C.O.P.-3
TEMPORARY
801.44 M²

8.63
85 WARE
SHED FOR
54A BATTERY CHARGER
HOUSE
16.77 24.23

6.00M WIDE ROAD


54B

10.63
ROOF PLAN

5.00 6.00
16.83
E. 10.8X1.25 =13.6 SQ.M
PARKING-3 PIZZA SHED 6.00 M WIDE ROAD 6.00 M WIDE ROAD
(421.92M²)
43.13
12.00 25.07
3.70
F(ii)

12.00
12M WIDE ROAD C4

12.00
12M WIDE ROAD 64

27.31
14.25 C.O.P. - 4
62
= 1696.07 M²

35.00
6.00 142.05
F(i) 3.00 62.75

12M WIDE ROAD


6.30 RCH & MPP

21.55
57
C2

6.69
27.01

18.29
ELECTRICAL
7.13 85.00 41.00
ROOM

11.46
C.O.P. - 2 = 3836.30 M²

4.03
6.00 19.43 69

11.00
PARKING - 6
451.00 M²
Formal Dehydrate

5.00
40.54
Tank

TOTAL (A+B+C+D+E)= 380.18 SQ.M

6.00
6M WIDE ROAD 6M WIDE ROAD 6M WIDE ROAD 6M WIDE ROAD
21.30 17.40
44.00 15.23 5.90 27.00 21.00 25.50 15.50

2.75
5.95 C5

6.00

5.90
RAMP BPO

24.65
15.00
06/A C.O.P. - 5
33

6M WIDE ROAD
PARKING -7 WAC = 443.82 M²

24.50
9M WIDE ROAD
823.34 M² COLD 12.60

27.50
01 STORAGE
C1

LAYDOWN AREA

3.00
04 POLYMERI-

47.90

12.60
C.O.P.- 1 36 SATION 07

34.50
PACKING,
2107.77 M² WAREHOUSE UPW & MB 06

3.05
LPT WASTE

7.00
HANDLING

15.30
10.60 AREA

9.60
350.00
01/A 15.50 4M WIDE ROAD 70/A
18.00
32/A

6M WIDE ROAD
3.00 45.00 30.00
15.30

4.00 6.58 4.43


32

24.00

24.50
SAC II PLANT SOLID
SAC STORAGE 70

25.00
6M WIDE ROAD 18.85 4M WIDE ROAD

17.00
OCTADEINE DRUM

14.45
02 11.00 STORAGE SHED LPT WASTE

30.50
19.97 4.50 7.66 HANDLING
16.06 25.00

5.70
7.42
AMINATION 40A
18.86 19.00 43 COLD STORAGE AREA

6.52

6M WIDE ROAD
21.00 (PETROLEUM

7.46
GR.

6M WIDE ROAD
40 PRODUCTS)

2.00
CANTEEN 6.92
11.00 19.50

7.00
30

LOCKER &

6.58
6.17 7.46

SHOWER

PARKING -16
52/A 35

= 229.35 M²
09

3.00
6M WIDE ROAD
9M WIDE ROAD

29.95
PARKING -8
31

615.97 M²

PARKING -9
1122.92 M²
34

35.00
1st FLOOR

28.58
30 G.F

44.00

44.00
35.00
WELFARE LPT SUBSTATION

36.50
03

17.50
LABORATORY

16.00
FACILITY (1st FLR.) 20.30
DISPENSARY 52 PARKING -10 &
CME

3.00
28 = 671.60 M² CONTROL ROOM C6

SECURITY

28.00
19.00 24.50 (2nd FLR.) 39

OFFICE
SECURITY 29

&TIME
C.O.P. - 6

27.20
METHYL
3.05 08 CHLORIDE
CABIN-1 STORAGE 8.80 481.03 M²
PARKING-11

11.00

11.00
365.73 M² PARKING -12

3.56

8.00
37 = 504.62 M²
6.82 14.00 22.75 23.99 33.25 14.10 14.10 7.85 10.00
18.33 9.09

GATE
9M WIDE ROAD 6.00M. WIDE ROAD

MAIN

18.49
9M WIDE ROAD

3.00

3.00
PARKING-14 = (365.73 M²) PARKING -15 = 261.00 M²
68.73 87.00

4.30
23.91

6.00m. Wide Road


48.23

16.60
19.88 20.00 49 H2
24.23 6.99 UNLOADG. MEK TANK FARM 3.00
STATION FGL. +34.0

14.23

6.0 M WIDE ROAD


FFL.+34.60 43
4030/4005 PLANT
50.88
9.73 8.80
5.00

6M WIDE ROAD
PARKING-13

39.56
(H-10M) 945.87 M² 3.25

35.00

9.0 M WIDE ROAD


26

55.60
ADMIN 6.0 M WIDE ROAD

3.70

25.50
21.42

550.00
42 46

4.08
7.45

PASTILLATION UNIT
44F

6.0 M WIDE ROAD

9.08

5.23
3.06 9.95 8.04 48.23
TOC.

70.19

14.23
+34.30 44
4010/4020 PLANT

TO.PRO.
44/B

4.70
14.80

+34.45

5.50
4.50 M WIDE ROAD 6.50 H.S. UNIT 11.50

13.50
2.23

4.14
4.53
10.41

2.68

PARKING -17 = 303.43 M²


44/A
11.66 41.38 6.0 M WIDE ROAD 82

2.89
2.57

1.24
12.33

101.15
6.0 M WIDE ROAD
11.0 M WIDE ROAD
OPEN PLOT AREA

6.45

2.60
AII Drum 51.80
2.15 Storage Area 68 29.00

6M WIDE ROAD
41

35.30

1.00
14.90

7.26
FINISH GOODS 47
67 1.55 1.53 5.00

9.0 M WIDE ROAD


WAREHOUSE 45

16.30
A.G. TANK 12.22

20.50
11.80
46

11.65
41A FARM

8.73

8.90
48
15.15
6.10

7.18
7.51
PARKING-18 FGL. +34.0

3.34
162.88 M² FGL. +34.0
U.G. TANKFARM
24.67

12.97
17.96
6.0 M WIDE ROAD 6.0 M WIDE ROAD 6.0 M WIDE ROAD
69.98
9.56 25.00

8.38
PARKING -19 = 586.62 M²

130.00 N/G
17 METERING BOILER-1
19.00 6.00 19.50 26U001

16.00
N/G
18 CLEANING
13
CO GENERATION 6.00m. Wide Road
16
19

54.50
3.00

4M WIDE ROAD
MAIN LAHS STORAGE

6.00m. Wide Road


22.00
SUBSTATION TANK AREA
(BY CLIENT)

9M WIDE ROAD
ENGG.
20
WORKSHOP
6.00
TECH
21
STORAGE

2.00
14 NITROGEN PSA UNIT
78.91 O/O 15.23 20.30

PARKING -21 = 196.51 M²

0.48
13.50

28.19
61.00

6M WIDE ROAD

1.50
65.50
4.59

6M WIDE ROAD
29.00 73.00 79

11.62
PARKING-20

1.20
0.48

1.50
= 848.10 M²

170.00
11 3.00

39.50
DMW 105.11
10

10.92
PLANT
FIRE & RAW
C7 C.O.P. - 7 = 1132.05 M²
12 WATER TANK
6.00m. Wide Road

1.79

5.04
27.67 17.16
13.90 5.06 27.80
9.00 30.69

Contractor Workshop &


Waste Handling Shed
6M WIDE ROAD

16.00
3.81

6.00m. Wide Road


PARKING -23
81

9.00m. Wide Road


97.21 = 366.94 M²

4.5m Road

Working area for contractor


6.00m. Wide Road

Contractor Cabin
7.50

21.09

41.16
PARKING-22 Sewage

40.45
71 4.39

18.14
= 2050.21 M² Treatment 73
Plant Engineering Store
2.50
74
Welfare Facility -

18.23
9.25 Contractor
9.31 94.27

6.00
72

12.00 TRUCKERS BLDG.


MCC ROOM AND

4.50
16.11

WEIGH BRIDGE
6.50
(PROPOSED) WEIGH BRIDGE
CABIN 6M WIDE ROAD
15

15.00
42.50

50.00
EFFLUENT TREATMENT 23

6M WIDE ROAD
6M WIDE ROAD
PLANT

20.00

31.27

25.00
PARKING -24 25
22 = 1328.98 M²
19.63 SWITCH YARD
ETP

8.33
STORAGE

30.00
HUTCH 12.45 SHED 57.00 11.44
TOWER
15A
SECURITY
5.00

2.10

13.70
6M WIDE ROAD 15A CABIN-2

9.88
230.00

MATERIAL
ENTRY GATE - II
GIDC ROAD

SITE PLAN

ISSUED FOR APPROVAL


01 16-11-2022 SNA PDM PDM

00 01-10-2022 ISSUED FOR APPROVAL SNA PDM PDM

REV DATE REVISION-STATUS PREPARED CHECKED APPROVED

Scale :- 1:100 Code No.


Abbreviation
Date Name Title
App. 09.09.22 PDM
PROCESS PLANT
Chk. 09.09.22 PDM
Drn. 09.09.22 SSG
ARCH: ROOF PLANS
Drawing No.
22013-01-ARC-DWG-A1-002-R01

www.aryaengineers.com

You might also like