This document contains a bottom-up project estimate for an unspecified construction project. It lists work breakdown structure (WBS) items, resources, quantities, unit rates, and amounts. The total estimated amount for structural elements like framing, slabs, and shells is $3,141,827. It also includes architectural, mechanical, electrical, and other design and construction costs.
Original Description:
Original Title
Student Name - 3.19b_Project Bottom Up Cost Estimating Worksheet 4
This document contains a bottom-up project estimate for an unspecified construction project. It lists work breakdown structure (WBS) items, resources, quantities, unit rates, and amounts. The total estimated amount for structural elements like framing, slabs, and shells is $3,141,827. It also includes architectural, mechanical, electrical, and other design and construction costs.
This document contains a bottom-up project estimate for an unspecified construction project. It lists work breakdown structure (WBS) items, resources, quantities, unit rates, and amounts. The total estimated amount for structural elements like framing, slabs, and shells is $3,141,827. It also includes architectural, mechanical, electrical, and other design and construction costs.