Table 7: The represents division of costs and activities according to the number of time units for the
completion of the Karbala metal silo project.
Activity Normal Natural cost Cost per day No. Activity Name Previous Code time ( (Million (million) Activity Civil Works A day ) Dinars) Preparing the site and the land of the project, which includes planning and 1 settlement with scraping the land, 100,000,000 7,142,857 A1 - 14 burying it, fixing dimensions and removing rubble Examinations, evaluation and treatment 2 A2 83 120,000,000 1,445,783 of test pillars A1 Excavation and casting of piles under 36 3 A3 A2 1,957,500,000 54,375,000 the benzat 4 Silo schemes and approval A4 - 36 150,000,000 3,260,869 Earthworks with burial under the foundations of benzan and pouring the A3,4 5 A5 10 143,875,000 14,387,500 blinding layer Benzat group with moisture blocker coating (A) 35 6 Concrete racking casting for benzate(a) A6 A5 163,500,000 4,671,428
8 Concrete Hopper Casting (AA) A8 A7 120 216,000,000 1,800,000 Earthworks with burial under the foundations of the benzan and pouring 9 A9 A3,4 10 143,875,000 14,387,500 the blinding layer Benzat group with moisture blocker coating (B) Concrete racking molding for benzat 10 A10 A9 35 163,500,000 4,671,428 (B) 11 Casting concrete columns(B) A11 A10 30 105,000,000 3,500,000 12 Concrete Hopper Casting(B) A12 A11 120 216,000,000 1,800,000 Excavation and burial works under the operating room, tunnels, hobars, bases 13 of benz and groundwater withdrawal A13 A11 80 50,000,000 625,000 with treatments for the operating building Concrete pouring works for the 14 A14 A13 30 140,400,000 4,680,000 operating room and tunnels Casting works of the upper transverse 15 A15 A13 10 48,600,000 4,860,000 conveyor tunnel depth of 12 m Concrete works for train and truck 16 receiving holes with tightening of A16 A15 20 26,000,000 1,300,000 grates Pouring concrete foundations silo 17 A17 A15 10 8,000,000 800,000 loading Concrete works for pouring yards 18 A18 A16,17 10 86,400,000 8,640,000 surrounding operating rooms Implementation of the electricity building with the installation of the 19 A19 A11 30 20,000,000 666,666 transformer with the shed and the bases of the cable channels Mechanical Works B Erection and tightening of metal benzat 20 B1 A8 65 40,000,000 615,384 for line A Installation and tightening of metal 21 B2 A12 65 40,000,000 615,384 benzat for B line Manufacture and installation of the 22 B3 A14 180 50,000,000 277,777 steel structure of the operating room Processing and installation of grain 23 B4 B3 60 62,000,000 1,033,333 cranes Installation and inspection of screening 24 B5 B1,2 30 10,000,000 333,333 machines Tightening, erecting and checking the 25 B6 B5 30 20,000,000 666,666 dust system Tightening and erecting the upper 26 B7 B1,2 90 40,000,000 444,444 conveyor assembly Tightening and erecting the lower 27 B8 B4 91 29,000,000 318,681 vector group Processing and tightening the metal 28 B9 A18 20 20,000,000 1,000,000 shed over the receiving holes Hydraulic tipper installation and 29 B10 A18 25 95,000,000 3,800,000 inspection Erecting loading silos with telescope 30 B11 A18 30 24,000,000 800,000 hose Packaging of the operating building 31 B12 B9,10,11 20 30,720,000 1,536,000 with the bond and the Wig Panel Electrical Works C Laying of high and low voltage power 32 C1 A19 5 30,000,000 6,000,000 line and control lines Processing, installation and inspection 33 C2 A19 20 12,000,000 600,000 of lighting poles Equipping, installing and inspecting 34 C3 C1,C2 15 280,000,000 18,666,666 generators Installation and inspection of the 35 control room and connection of C4 B12 120 30 ,000,000 250,000 equipment and control cables Equipping, installing and inspecting 36 C5 A14,15 5 6,000,000 1,200,000 submersibles Tightening and testing the temperature 37 C6 B1,2 15 10,000,000 666,666 monitoring system for benzos Air system tightening and installation 38 C7 C6 15 18,000,000 1,200,000 works Works and installation of electronic 39 C8 C3 20 30,000,000 1,500,000 scale calibration Works of lightning and ground arrester 40 C9 A13 10 5,250,000 525,000 system Installation, tightening and inspection 41 C10 B7,8 15 90,000,000 6,000,000 of an electric elevator for people Installation of switchboard 42 C11 C4,7,8,B6 5 6,000,000 1,200,000 communications and cameras Internal and external lighting 43 C12 C7,8,B6 10 6,191,028 619,102 installation works 44 Installing a grain sterilizer C13 10,11,12 5 1,000,000 200,000 45 Initial Total Examinations D1 C4,C5,C9,C13 45 64,000,000 1,422,222 Total 5,012,811,028 188,004,689