BILL OF QUANTITIES AND BUDGET ESTIMATES FOR THE CONSTRUCTION OF AN
100M3 (100,000L) CAPACITY RESERVE WATER TANK IN NTANCHE COMMUNITY
AMOUNT S.N DESIGNATION U Qty U.P (CFA) I-0 PRELIMINARY WORKS I-1 Site preparation LS 1.00 200,000 200,000 I-2 Setting out LS 1.00 100,000 100,000 Sub total I 300,000 II-0 FOUNDATION II-1 Excavation of trenches M3 150.00 6,000 900,000 Stone work for foundation including the II-2 M3 37.50 15,000 562,500 formation hardcore base Reinforced concrete slab (Dosage II-3 M3 19.00 200,000 3,800,000 400kg/m3) Sub total II 5,262,500 III-0 ELEVATION WORKS 30cm THK Stone work construction of the III-1 M2 81.00 15,000 1,215,000 walls R.C. for the internal peripheral walls (20cm III-2 thickness) - Waterproofing admixture or M3 13.50 200,000 2,700,000 additives III-3 R.C. for the chain beams and cover slab M3 14.50 200,000 2,899,200 III-4 Water proofing cement surface finish M2 131.60 3,000 394,800 Sub total III 7,209,000 IV-0 PLUMBING WORKS IV-1 Piping installation LS 1.00 300,000 300,000 IV-2 Plumbing accessories LS 1.00 300,000 300,000 Sub total IV 600,000 V-0 EXTERNAL WORKS Fabrication and installation of a CAT V-1 No. 1.00 200,000 200,000 Ladder V-2 Construction of concrete drain gutter ml 6.00 12,000 72,000 V-3 Construction of Waste chamber No. 1.00 15,000 15,000 V-4 Construction of water outlet chamber No. 1.00 10,000 10,000 Sub total IV 297,000 GRAND TOTAL (HT) 13,668,500