Professional Documents
Culture Documents
KERJA YANG LAIN YANG BERKAITAN DI KOMPLEKS MAHKAMAH BARU MUAR, JOHOR.
Pipework
INSPECTION CHAMBER
MANHOLES
F To invert, not exceeding 2.00m depth; average no. 4 2,500.00 10,000.00 3,800.00 15,200.00
2.00m depth
Additional item
B Inspection for PDC6, PDC7, CCTV and PDC8 by IWK LS 15,000.00 10,000.00
diskaun 17,200.00
GRAND TOTAL 141,700.00 120,000.00
Different 21,700.00
% 15.3%