Work Procedure For Change Out Activity v-1004 A
Work Procedure For Change Out Activity v-1004 A
Doc. No.
002
Rev. No. 0
WORK PROCEDURE FOR
UNLOADING/LOADING Rev. Date 27/02/2018
Signature :
TABLE OF CONTENTS
SECTION TITLE
2.0 OBJECTIVE
This procedure is written with the intention of being a working instruction for RWNA
personnel by detailing the standard of workmanship and acceptance criteria throughout
each phase of loading and unloading activities.
3.0 RESPONSIBILITIES
3.1 Project Manager
Shall ensure all works related are following the approved
procedure. He shall also act as the overall client interface
throughout the duration of the project.
To ensure that the works performed according to quality and HSE
requirements, and within time frame.
3.5 QA/QC
Ensure all the works performed is according to the client’s
requirement.
Perform all required inspection in accordance to the latest
revision of the approved ITP.
RW-WI-001-18-
Doc. No.
002
Rev. No. 0
WORK PROCEDURE FOR
UNLOADING/LOADING Rev. Date 27/02/2018
4.8 Safety
Contractor shall use proper and fit to use equipment.
Use of personnel protective equipment (PPE) as per JHA
requirement shall be mandatory to avoid any incident /
accident during the change out activities. Contractor shall
ensure that all works are performed with due regard to the
safety of personnel.
4.9 Housekeeping
Disconnect suction hose, air hose, electrical cable and
others and prepare for de-mobilization.
All the unwanted materials / items shall be removed from
the site.
Proper housekeeping at work area after de-mobilization as
per existing site condition.