Hole No.

BORING LOG BH-5


Project : Reviw DED Overpass Kebasen Methods : Bore Machine : Drill Master : Mulyadi
Location : Kebasen, Purwokerto Rotary drilling TOHO
Inclination : Started : Logged by : Bustanul ilmi
05/08/2016
Area of Designation : Depth : 30 m Finished : Checked by : Shouman
X 07/08/2016
Coordinate Y Approved by :
Ground Water Level (m) Z

Core Dia. & Barrel Type

Casing Inserted & Dia.


ROCK CLASSIFICATION UJI PENETRASI/PENETRATION TEST

Core Recovery (%)

Soil/Rock Sample
0
Graph Symbol

Joint Interval
ROCK/SOIL DESCRIPTION N Value GRAPH (N Value)

USCS Chart
Depth (m)

Depth (m)
N TOTAL
Class

N1

N2

N3
Date

10 20 30 40 50 60

0 0
Lanau pasiran
Coklat keabuan
1 1
Kaku
5 5 8 13
2 2

3 3
DS
5 6 7 13
4 4

5 5
Lanau lempungan pasiran
Coklat 12 12 15 27
6 6
Sangat kaku - keras

7 7
DS
12 14 17 31
8 8

9 9

15 18 20 38
10 10
Lanau pasiran
Abu - abu
11 11
Keras DS
20 21 25 46
12 12

13 13

28 30/3 > 60
14 14

15 15
Pasir lanauan DS
Coklat keabuan 30/2 > 60
16 16
Sangat padat

17 17

30/3 > 60
18 18
Lanau lempungan
Coklat keabuan
19 19
Keras DS
30/2 > 60
20 20

21 21

30/4 > 60
22 22

23 23

30/3 > 60
24 24

25 25
Batu
Abu - abu 30/2 > 60
26 26
Keras
27 27

30/2 > 60
28 28

29 29

30 30/2 > 60 30
.