Power Supply Business Plan (RUPTL)

PT PLN (Persero) 2012-2021

Jakarta, 7 February 2013


Background of Preparation of RUPTL 2012-2021

• Project slippage
• Expansion of IPP existing
• Demand forecast Updating
• Backbone Plan 500 kV Sumatera
• Having Additional plan for cross island inter connection plan
• Considering natural gas and LNG supply prospect

2
Projection of Electricity Demand 2012-2021

62
26 TWh
TWh
2012 2021
IB : 10,5%

37
14 TWh
TWh

IT : 11,4%

132 259
TWh TWh

JB : 7,9%

Average of national electricity demand growth 2012-2021 is 8,65% annually.


3
Additional Capacity per Type of Power Plant

MW

Additional Capacity :

PLTU (steam) : 38 GW
PLTP (geothermal) : 6,3
GW
PLTGU (Gas and Steam)
: 2,5 GW
PLTG (gas)/PLTMG
(machine gas) : 4 GW
PLTA (hydro)/PLTM (mini
hydro): 6,3 GW
Lainnya : 0,28 GW

4
Projection of Energy Mix (Total Indonesia including IPP)

450.000

400.000

350.000
LNG

300.000 Gas

250.000
GWh

200.000
Oil

150.000

100.000 Coal

50.000
Geothermal

- Hydro
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Impor Biomass Surya/Hybrid HSD MFO LNG Gas Batubara Geothermal Hydro

Surya=solar, batubara=coal
5
Kebutuhan Energi Primer (Total Indonesia Termasuk IPP)

No. FUEL TYPE 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

1 HSD (juta liter ) 6.269 4.785 1.987 955 1.041 625 703 817 898 973

2 MFO (juta liter) 2.788 2.826 2.348 377 13 22 36 57 37 37

3 Gas (bcf) 388 407 534 515 465 321 312 304 299 334

4 LNG (bcf) 46 53 93 121 146 237 230 232 264 265

5 Batubara (juta ton) 51 61 66 79 91 101 108 114 123 134

6 Biomass (ribu ton) 49 49 49 49 49 49 49 49 49 49

Juta liter=million litre


Ribu ton =thousand tons

6
Plan for Development of Jawa-Bali Electricity System

PLTU Jawa-6 PLTU Jawa-5 PLTU Indramayu PLTU Jawa-1 PLTU Jawa-3
#1: 1.000 MW (2021) #1: 1.000 MW (2018) #4: 1.000 MW (2018) #2: 1.000 MW (2017) #1: 660 MW (2018)
#2: 1.000 MW (2021) #2: 1.000 MW (2019) #5: 1.000 MW (2020) #2: 660 MW (2020)

SURALAYA PLTU Jawa-4


NEW SURALAYA HVDC
#5: 1.000 MW (2019)
SURALAYA
CILEGON BANTEN
M.KARANG PRIOK
#6: 1.000 MW (2020)
HVDC DURIKOSAMBI M.TAWAR
KEMBANGAN
INDRAMAYU
BEKASI CIBATU-2
NEW BLRJA CAWANG
TAMBUN
LENGKONG
GANDUL CAWANG-2
CIBATU PLTU Jawa Tengah
CIBINONG
BOGOR-X DEPOK
CISOKAN
T.JATI B
#1: 1.000 MW (2017)
CIRATA
UJUNGBERUNG
JAWA-1 JAWA-3
PEMALANG #2: 1.000 MW (2018)
SAGULING JATENG
MANDIRANCAN
BANDUNG SELATAN GRESIK
CIGERELENG T.JATI A
UNGARAN NGIMBANG
TANDES
PLTGU Jawa-1
MATENGGENG KRIAN SURABAYA #4: 750 MW (2015/16)
TASIKMALAYA SELATAN
KESUGIHAN
/RAWALO
CILACAP GRATI
PLTU Banten ADIPALA PEDAN BANGIL
BANTUL
#1: 625 MW (2016) KEDIRI PAITON

AMPLA

Upper Cisokan PS Matenggeng PS KAPAL

#1: 260 MW (2017) #1: 225 MW (2020)


#2: 260 MW (2017) #2: 225 MW (2020)
#3: 260 MW (2017) #3: 225 MW (2021) PLTU Cilacap PLTU Adipala PLTGU Jawa-2
#4: 260 MW (2017) #4: 225 MW (2021) #3: 600 MW (2014) #1: 660 MW (2014) #3: 750 MW (2021)

GITET 500 kV eksisting GITET 500 kV rencana


Kit 500 kV eksisting Kit 500 kV rencana

SUTET eksisting SUTET rencana

7
Plan for Develepment of Sumatera Electricity System
Ulee
Kareng

PLTG/MG Arun & PLTU Pangkalan Susu PLTU Riau Kemitraan


D
Sigli C. Trueng
Banda Aceh Samalanga
Bireun
G Lhokseumawe

P. Brandan #1,2 : 440 MW-2014 (PLN-TNB-PTBA)


Jantho P. Labu
P
Seulawah Idie

Takengon Tualang Cut


PLTU
400 MW-2014 #3,4 : 400 MW-2016 1200 MW-2018
PLTP Seulawah
A Langsa
Blangkjeren
Meulaboh P. Brandan

PLTU Jambi KPS


U Peusangan1-2 P. Susu
HEPP G U
PLTU Binjai

110 MW-2018 PLTG/MG Peaking


Meulaboh ~
Lawe Mamas Mabar

800 MW-2019/20
HEPP P.Geli P. Pasir
Blang Pidie A Labuhan
KIM Lamhotma
Namorambe Glugur
Wampu

Riau & Jambi


Kuta Cane Sei Sei.
HEPP P. Batu RotanDenai
A Titi Kuning K.Namu Perbaungan

PLTU Nagan Raya


K. Tanjung
T. Tinggi

PLTU Sumsel 5 & 7


T . Morawa

300 MW-2015
Brastagi Galang Kisaran TNB
G.Para Malaysia
Tapak Tuan Renun HEPP ~

#1,2 : 200 MW-2013 Sabulusalam


Sidikalang

Tele
P. Siantar

Porsea
Aek Kanopan

600 MW-2015/16
#3,4 : 400 MW-2017/18
Malaka
Bagan
D. Sanggul ~ Asahan I R. Prapat
Siapi- api
HEPP
PLTP P Tarutung

• PLTU Banjarsari
Asahan III
P. Bukit Simangkok
A HEPP
PLTP Asahan K. Pinang
Sarulla&
PLTU ~ ~ IV& V Dumai

PLTA Asahan III 174 MW-2016


P
Sipaholon ~ HEPP
L. Angin KID

230 MW-2015
Sibolga
U U
~ A Duri
G.Tua New
PLTA Bagan Batu
B. Toru
G G.Sakti Perawang Siak Sri

• PLTU Keban Agung


Kandis Indra Pura
Pd . Sidempuan Minas
Garuda

PLTP Sarulla I&II 440 MW-2016/17


P. Pangarayan Pasir Putih U Tenayan
Sakti

227 MW-2015/16
PLTP P Bangkinang
Panyabungan ~
S. Merapi
Teluk Kulim

PLTP Sorik Merapi 240 MW-2018 Lembu

Simpang4

P
Pd. Luar
Payakumbuh
~ Kt. Panjang
HEPP
P. Kerinci

Tembilahan
• PLTU Sumsel-1 MT
PLTA Batang Toru 510 MW-2019
Maninjau
HEPP ~
Pariaman
Singkarak
HEPP ~
Batusangkar
T. Kuantan
Rengat 600 MW-2017
• PLTU Sumsel-6
Lubuk Pd. Panjang ~
Alung PIP Pauh Ombilin U
~ Limo
PLTU Riau

PLTP Muara Laboh 220 MW-2016/17


GIS Kota

600 MW-2018
Salak Kiliranjao Kemitraan K. Tungkal
S.Haru
Indarung Solok
Aur Duri
P PLTP S. Rumbai Payo
Selincah

PLTP Bonjol 165 MW-2020


G. Talang

• PLTU Sumsel-8,9,10
Bungus
Muara Bulian ~
U P G
Sumbar Pessel Muara
Sarolangun

3000 MW-2016/17/18
Bungo B. Lincir
Kambang
U
S. Penuh Bangko

PLTU Sumbar Pesisir 224 MW-2013


PLTU
A Muara U Jambi S. Lilin
Merangin (KPS) U 1 . PLTG Apung
Rupit
HEPP
T.Api-api 2. PLTG Ex Pulo Gadung
3 . IPP Palembang Timur G
~
Betung Tl. Kelapa Borang

PLTA Merangin 350 MW-2018


Mukomuko 3
4 5
Sekayu GIS Kota I
PLTP ~ 2
Hulu Lais 1
6
P PLTU Keramasan 7
S. Belimbing
Bukit
Lubuk PLTU U

PLTP Hulu Lais 110 MW-2016


Asam

PLTG/MG Peaking
~ K. Agung Mariana
Tes HEPP Linggau U ~
U ~ Simpang3
Pekalongan U Prabumulih
PLTU Kayu
~

PLTP Kepahiyang 220 MW-2020


Banjarsari M. ENIM Agung

Lampung & Bangka


Argamakmur PLTG
T. Tinggi G. Megang
Lahat
Sukamerindu ~
Musi HEPP Gumawang Mesuji
P.Baai
PLTP
P L. Balai 200 MW-2015
PLTP Lumut Balai 220 MW-2015/16
Pagar Dipasena
Alam
P Baturaja P. Ratu
PLTP
R. Dedap

PLTP Rantau Dedap 220 MW-2016/17 Manna


Muara
Dua B. Umpu
Bukit
Kotabumi
Menggala
Sp.Banyak

Kemuning

PLTP P

PLTP Danau Ranau 110 MW-2020


~ Metro
D. Ranau G Sribawono
Besai HEPP Adijaya
Tegineneng
P B. Tegi Natar
275 kV AC PLTP Suoh Sekincau 220 MW-2018/19 Liwa
PLTP
S. Sekincau

PLTP
HEPP
Gd. Tataan

~ Pagelaran Langkapura Sutami


Suka
UluBelu~ Tlk . rame New

500 kV AC PLTP Ulubelu 220 MW-2012 & 16/17 K.Agung Betung Tarahan
Bengkunat P
PLTP Wai U
Ratai Tlk. Ratai ~ Kalianda
Tarahan

HVDC PLTP Rajabasa 220 MW-2017 PLTPP


Rajabasa
Sistem
Sistem
JAWA
JAWA

8
Plan for Development Kalimantan Electrciicty System
SABAH (MALAYSIA)

PLTA Kelai 75 MW-2020 • PLTG/MG Tj. Selor


PLTG/MG Pontianak 100 MW-2019 20 MW-2013/15
PLTU Kaltim-2 200 MW-2016 Tidang Pale

PLTU Parit Baru 100 MW-2014 Malinau • PLTU Tj. Selor


• PLTU Embalut (Eksp.) 14 MW-2014
PLTU Pantai Kura-Kura 55 MW-2014 50 MW-2015 U
PLTU Parit Baru Loan China 100 MW-2015
Tj. Selor U

PLTG Kaltim Peaking


• (MALAYSIA)
SERAWAK
G
PLTU Tj. Redep
PLTU Kalbar-1 PLTA Nanga Pinoh 100 MW-2013 14 MW-2014
Tj. Redep

200 MW-2018/19 98 MW-2020 • PLTG Kaltim Peaker 1 U


U

100 MW-2017 A
A
9

Sambas

PLTG/MG Bangkanai
Singkawang U
280 MW-2014/15/16 Maloi
Bengkayang
Putussibau

U
PLTU Kaltim-3
U
Ngabang Sangatta
Sintang
Mempawah Sanggau U Bontang U
200 MW-2018/19
U
Parit BaruU
G
Siantan U
Sekadau
G
G U
G U
Tayan Nanga Melak Kota Bangun
U
PLTGU Senipah
U
Pinoh
GG
Kota Baru Sei Raya Puruk

A
A
U Cahu

PLTU Ketapang
D
U
U
U
117 MW-2013/15
Muara Karangjoang
Kuala

PLN : 20 MW-2015
Kota Baru D Teweh G
Kurun
Sukadana
GU
G
Sukadana D
PLTU Muara Jawa
SULAWESI TENGAH
IPP : 14 MW-2015
Manggarsari

U
U Industri

220 MW-2014
Petung

UU Buntok
Kuaro
D
U Ketapang
U
Kasongan
D
PLTU Kalsel-1
Palangkaraya
Parenggean SULAWESI
Nangabulik
Pangkalan D New
Amuntai
UU Tanjung
SELATAN
65 MW-2019
Palangkaraya

PLTU Kalselteng-1 200 MW-2017/18


Banteng Sampit
D

U
U D
UU Barikin
Selat
Sukamara Pangkalan
U
PLTU Kalselteng-3 100 MW-2016 U PLTA Kusan
Bun
U Rantau

Kayutangi
Kotabaru 200 MW-2016/17
A
Kuala Ulin Batu
Seberang A
PLTU Sampit 50 MW-2014
Pambuang A Licin
Barito
D
Trisakti
G
Mantuil Cempaka
Satui

PLTU Asam-Asam 130 MW-2013


Bandara

PLTG/MG Kalselteng Peaker


Pelaihari

PLTU Pulang Pisau 120 MW-2014 UU PLTU Kalselteng-2 200 MW-2017/18


50 MW-2018 U
9
Plan for Development of Sulawesi Electricity System
2
Paniki
Likupang
1. PLTU Sulut 3 100 MW-2017/18
Teling Ranomut Bitung
Tasik Ria
3 A
D
Kema
2. PLTG/MG Minahasa 75 MW-2015/16
1
Sawangan GU
Tomohon

10 4
P Tonsealama
P
U Lopana
Leok U
Kawangkoan
3. PLTA Sawangan 12 MW-2016
6
U U P
Tolitoli
KALIMANTAN
TIMUR GORONTALO 8 U
U

Buroko
Bintauna
Lolak 5 4. PLTU Sewa 50 MW-2014
Otam
P
Isimu
Moutong Marisa
Botupingge 7
U
SULAWESI UTARA 5. PLTP Lahendong V & VI 40 MW-2015/17
9
U
Siboa G
Molibagu
6. PLTU Sulut I 50 MW-2014
7. PLTU TLG 20 MW-2013
8. PLTU Gorontalo 50 MW-2014
9. PLTG Gorontalo 25 MW-2017
10. PLTU Tolitoli 45 MW-2014/15
11 U
P

Silae
Talise Ampana
Bunta
11. PLTU PJPP #3,4 30 MW-2015
12
Luwuk
Palu
Baru
U
12. PLTU Palu 3 100 MW-2017
Poso
Toili
13. PLTA Poso 2 130 MW-2020
Pasangkayu
G 14. PLTA Karama 450 MW-2018/19
15. PLTU Mamuju 50 MW-2015
A
SULAWESI
BARAT
13
A Tentena

Kolonedale
16. PLTA Malea 90 MW-2016
Topoyo
SULAWESI
17. PLTA Bonto Batu 100 MW-2016
14
TENGAH
18. PLTA Bakaru II 126 MW-2020
15
Mamuju A
Baru

Mamuju
U
Wotu
Malili
19. PLTGU Sengkang 180 MW-2013
20. PLTU Sulsel Barru 2 100 MW-2016
16
17
A

Makale
Palopo
SULAWESI 21. PLTU Jeneponto PLN 200 MW-2014/15
TENGGARA

Majene
Polman
18 A A A

Lasusua
22. PLTU Jeneponto 2 200 MW-2016
Bakaru Enrekang

Siwa
23. PLTA Wotunohu 1 20 MW-2017
Pinrang SULAWESI 26 24. PLTU Kolaka 20 MW-2016
Pare
D
Sidrap
SELATAN 23
A 25A U
U
U

27
Kolaka

25. PLTA Konawe 50 MW-2016/17


Sengkang Kendari
Unaaha P

19
G

24
GU U

20
U
Soppeng
26. PLTU Kendari 3 100 MW-2017
28
U U
Barru

Pangkep Tonasa Bone 27. PLTP Laenia 20 MW-2019


29
U

Tello D
Maros
Bosowa
Kajuara
Raha
28. PLTU Kendari 50 MW-2016
G

Sungguminasa Sinjai
29. PLTU Raha 6 MW-2014
U
A
U
31 30. PLTU Bau-Bau 20 MW & 14 MW-2014
30
U
Bantaeng U
Punagaya Bau-Bau
Tallasa Bulukumba

21 22
U
U
Jeneponto
31. PLTU Wangi 6 MW-2013/14
10
Plan for Development of Maluku Electricity System

Tobelo
G

14
M

6 A

7A
8
A
Bula

4
5
2
ACSR 1x 240 mm A
2
55 km (2014) ACSR 1x 240 mm 2

15 km (2017) ACSR 1x240 mm


110 km ( 2017)

Kairatu 3
A
ACSR 1x240 mm2
110 km ( 2017) Masohi
9
A

1
Waai 2cct, Kabel laut
U U 7 km (2017)
Tulehu
P
2 Haruku
2 cct, Kabel laut
4 MW ( 2013)
12
Passo 5 km ( 2017)
Wayame Jailolo
2
Sirimau ACSR 1x240 mm
42 km (2016)

2
ACSR 1x240 mm
72 km (2016)

2
ACSR 1 x240 mm
1. PLTU Wai I, II 45 MW-2013/14-2016 10 11
U
23 km ( 2016)

2. PLTP Tulehu 20 MW-2016


3. PLTM Tene 4 MW-2013
4. PLTA Wai Tala 54 MW-2017/18
5. PLTM Ruwapa 1,2 MW-2013
6. PLTM Mala 6 MW-2014
7. PLTM Wae Mala 2 MW-2013
8. PLTM Nua 6 MW-2016
9. PLTM Makariki 4 MW-2013
10. PLTU Tidore I, II 28 MW-2013/2015
11. PLTU Sofifi 6 MW-2014
12. PLTP Jailolo 10 MW-2016
13. PLTP Songa W 5 MW-2017
14. PLTGB Tobelo 8 MW-2014
11
Plan for Development of Papua Electricity System

11 10 9
8

3
1
2
7

5
6

1. PLTU Holtekam 1&2 50 MW-2013&15


2. PLTU Skouw 30 MW-2016
3. PLTA Genyem 1&2 30 MW-2013&15
4. PLTU Merauke 1&2 28 MW-2016/17
5. PLTA Baliem 50 MW-2016-18
6. PLTU Timika 28 MW-2014/15
7. PLTU Nabire 14 MW-2016
8. PLTU Biak 14 MW-2016
9. PLTU Manokwari 14 MW-2016
10. PLTA Warsamson 47 MW-2017/18 4
11. PLTU Sorong 30 MW-2016
12
Plan for Development of Lombok Electricity System

1. PLTU Lombok Jrjang 75 MW-2013


2. PLTU Sewa 56 MW-2014 GI Bayan

2 2
3. PLTAG/MG Peaker 90 MW-2015/16 ACSR 1x240 mm
A
ACSR 1 x240 mm

5
35 km - 2019 41 km (2019)
U
4. PLTU Lombok FTP2 50 MW-2015/16 A ACSR 1x 240 mm
2

5. PLTU Lombok Timur 50 MW-2016 GI Tanjung 7P 15 km 2017


6U
A
4
U
6. PLTU Lombok 2 50 MW-2017
ACSR 1x240 mm2
7. PLTP Sembalum 40 MW-2019 15 km - 2013 ACSR 1x240 mm2
15 km 2014

GI Pringgabaya

GI Ampenan

G3
2
D ACSR 1x240 mm
30 km - 2013

GI Mantang
GI Selong
GI Jeranjang
1U ACSR 1x240 mm2
U2 15 km - 2013
ACSR 1x240 mm
2

38 km - 2013

GI Sengkol
2
ACSR 1x240 mm
10,5 km - 2013

GI Kuta

13
Plan for Development of Sumbawa Electricty System

1U
2

4U ACSR 1x240 mm
7 km (2013) ACSR 1x240 mm
2

60 km (2011)
2cct 1xOstrich GI Bima
60 km - 2013 GI Labuhan GI Woha
GI Dompu
2cct 1xOstrich
35 km - 2015
GI Alas/Tano

2cct 1xOstrich
2
15 km - 2013 ACSR 1x240 mm
30 km - 2016 2
ACSR 1x 240 mm 2 GI Sape
142 km (2016) ACSR 1x240 mm
2
GI Taliwang ACSR 1x240 mm 30 km (2016)
142 km (2016)
3
A
2P
2 cct 1xOstrich
10 km - 2013 GI Empang
5U

1. PLTU Bima 40 MW-2014-16


2. PLTP Hu’u 60 MW-2017-19
3. PLTA Brang Beh 12 MW-2016
4. PLTU Sumbawa 20 MW-2014/15
5. PLTU Sumbawa Barat 14 MW-2014/15

14
Plan for Development of Timor Electricity System
PLTU Atambua Atapupu
1x6 MW (2013)
3x6 MW (2014)
1U
2
ACSR 1x240 mm
18 km - 2013
Atambua

TIMOR LESTE
TIMOR LESTE 2
ACSR 1x 240 mm
75 km - 2013

Kefamenanu

2
ACSR 1 x240 mm
51 km - 2013

Soe/
Nonohonis

2
ACSR 1x 240 mm
Naibonat 51 km - 2013

PLTU Kupang FTP1


PLTU Kupang 2 2 x16, 5 MW (2013)
2
2x15 MW (2018/ 19) ACSR 1x240 mm
31 km - 2013
ACSR 1x240 mm
15 km - 2013
2
1. PLTU Kupang 33 MW-2013
Maulafa 2. PLTU Kupang2 30 MW-2018/19
1
2 Bolok
PLTU Kupang IPP 3. PLTU Kupang IPP 30 MW-2016/17
3 2x 15 MW (2016/17 )
4. PLTMG Kupang Peaker 80 MW-2015/18/20
4G
PLTU Kupang Peaker 1
20 MW (2015)
PLTU Kupang Peaker 2, 3, 4
5. PLTU Atambua 24 MW-2014/15
3x20 MW (2015/ 18/ 20)

15
Plan for Development of Flores Electricity System

8
G

7
Labuan Bajo ACSR 1 x 240 mm 2 5
A Ropa ACSR 1x 240 mm
2

85 km - 2014
Ruteng ACSR 1 x 240 mm 2 1U 120 km - 2014
33 km - 2016

ACSR 1 x 240 mm 2
ACSR 1 x 240 mm 2 6 Maumere
4P 60 km - 2014
95 km - 2014 ACSR 1 x 240 mm
2
ACSR 1 x 240 mm
2

Bajawa 44 km - 2013 10 km - 2014

2P
ACSR 1 x 240 mm
2
3P Ende

1. PLTU Ropa 14 MW-2013


2. PLTP Sokoria 20 MW-2017-20
3. PLTP Mataloko 15 MW-2018/19
4. PLTP Ulumbu 20 MW-2013-19
5. PLTA Wae Rancang 17MW-2016/17
6. PLTMG Maumere 8 MW-2015
7. PLTGB Larantuka 8 MW-2014
8. PLTP Oka Larantuka 3 MW-2019

16
Thank you