PROJECT: THE ARTON STOP BY ROCKWELL OVERALL TOTAL VOLUME (m3) = 167
LOCATION: HIGHLAND DRIVE COR. KATIPUNAN AVE., BLUE RIDGE A, QUEZON CITY 0.00% OVERALL TOTAL CEMENT USAGE (bags) = 0
3
DATE: 1-Jun-18 VOLUME FOR THE WEEK (m ) = 39
CEMENT USAGE FOR THE WEEK (bags) = 0
DATE LEVEL STRUCTURE GRIDLINE DESIGN MIX VOLUME (m3) CEMENT USAGE AREA (m2) SUPPLIER SUBCONTRACTOR MANPOWER TOTAL HOURS