CONCRETE POURING MONITORING

PROJECT: THE ARTON STOP BY ROCKWELL OVERALL TOTAL VOLUME (m3) = 167
LOCATION: HIGHLAND DRIVE COR. KATIPUNAN AVE., BLUE RIDGE A, QUEZON CITY 0.00% OVERALL TOTAL CEMENT USAGE (bags) = 0
3
DATE: 1-Jun-18 VOLUME FOR THE WEEK (m ) = 39
CEMENT USAGE FOR THE WEEK (bags) = 0

DATE LEVEL STRUCTURE GRIDLINE DESIGN MIX VOLUME (m3) CEMENT USAGE AREA (m2) SUPPLIER SUBCONTRACTOR MANPOWER TOTAL HOURS

MF-1 (LEAN CONCRETE) B-F/1-4 1 FOREMAN 10


F-6 (LEAN CONCRETE) A/3 8 MASON 10
F-4 (LEAN CONCRETE) B/2 8 LABORER 6
F-4 (LEAN CONCRETE) B/3
May 9, 2018 FOUNDATION F-3 (LEAN CONCRETE) F/2 3000 PSI 3/4 PCD @ 28D 28 361.58 PREMIERE ADMIN
F-3 (LEAN CONCRETE) F/3
F-2A (LEAN CONCRETE) G/2
F-2A (LEAN CONCRETE) G/3
RWF-1 (LEAN CONCRETE) E-G/1
TOWER CRANE FTG (LEAN CONCRETE) G-H/4-5 1 FOREMAN 6
RWF-1 (LEAN CONCRETE) H/1-4 8 MASON 6
May 11, 2018 FOUNDATION F-7 (LEAN CONCRETE) H/1 3000 PSI 3/4 PCD @ 28D 7 129.65 PREMIERE ADMIN 8 LABORER 2
F-9 (LEAN CONCRETE) H/2
F-10 (LEAN CONCRETE) H/3
CF-1 (LEAN CONCRETE) F/4-5 3 36.46 ADMIN 2 MASON 6
TOWER CRANE FTG G-H/4-5 76
F-10 H/4 4
May 24, 2018 FOUNDATION 7000 PSI 3/4 PCD @ 28D PREMIERE
F-10 H/5 4 83.22 ARAGON 6 MASON 8
F-2 G/4 3
F-2 G/5 3
F-3 F/2
F-3 F/3
May 28, 2018 FOUNDATION F-2A G/2 5000 PSI 3/4 PCD @ 28D 28 PREMIERE ARAGON 2 MASON 6
F-4 B/2
F-4 B/3
F-7 F/1
May 31, 2018 FOUNDATION F-7 G/1 7000 PSI 3/4 PCD @ 28D 11 PREMIERE ARAGON 2 MASON 6
F-10 H/3