Professional Documents
Culture Documents
BUDGET QTY
NO. STRUCTURE Original
Variations Revised
Contract
1 Lean Concrete 756.00 - 756.00
2 Equipment pad 514.50 - 514.50
3 Spread Footing 19,424.00 - 19,424.00
4 Mat Footing 19,472.00 - 19,472.00
5 Pile Cap - 0.00
6 Wall Footing - 0.00
7 Strip Footing - 0.00
8 Combined Footing 0.00
9 Footing Tie Beam - 0.00
10 Column 60,928.00 - 60,928.00
11 Shearwall 124,826.00 - 124,826.00
12 Retaining Wall 7,088.00 - 7,088.00
13 RC Wall 5,418.00 - 5,418.00
14 Slab on Fill 15,326.50 - 15,326.50
15 Pressure Slab - 0.00
16 Suspended Beam / Girder 163,002.00 - 163,002.00
17 Suspended Slab 195,426.00 - 195,426.00
18 Ramp Slab - 0.00
19 Staircase 12,705.00 - 12,705.00
20 Landing - 0.00
21 Sump Pit - 0.00
22 Trenches - 0.00
23 Tree Pit - 0.00
24 Domestic/Fire Reserve Tanks - 0.00
25 STP - 0.00
26 Swimming Pool - 0.00
27 Parapet Wall - 0.00
28 Upstand and Zocalo 651.00 - 651.00
29 Concrete Curb included - 0.00
30 Concrete Pad - 0.00
31 Pedestal - 0.00
32 PCCP - 0.00
33 Sidewalk - 0.00
TOTAL 624,266.50 0.00 624,266.50
TOTAL 2,700.00
CHARLES A. CENZON
Rebar Concreting Construction Manager
CUMULATIVE TO DATE
Actual Usage Budget Variance % Done
Cc:
Engineering Div
Operations Div
President
OSM REBAR MONITORING FORM
BUDGET QTY
NO. STRUCTURE Original
Variations Revised
Contract
1 Spread Footing 75,626.00 - 75,626.00
2 Mat Footing 149,624.00 - 149,624.00
3 Pile Cap - - 0.00
4 Wall Footing included - 0.00
5 Strip Footing - - 0.00
6 Combined Footing - - 0.00
7 Footing Tie Beam - - 0.00
8 Column 1,035,317.00 - 1,035,317.00
9 Shearwall 1,605,891.00 - 1,605,891.00
10 Retaining Wall 37,506.00 - 37,506.00
11 RC Wall 30,986.00 - 30,986.00
12 Slab on Fill 35,437.00 - 35,437.00
13 Pressure Slab - - 0.00
14 Suspended Beam / Girder 1,835,194.00 - 1,835,194.00
15 Suspended Slab 896,431.00 - 896,431.00
16 Ramp Slab - - 0.00
17 Staircase 81,813.00 - 81,813.00
18 Landing - - 0.00
19 Sump Pit - - 0.00
20 Trenches - - 0.00
21 Tree Pit - - 0.00
22 Domestic/Fire Reserve Tanks - - 0.00
23 STP - - 0.00
24 Swimming Pool - - 0.00
25 Parapet Wall - - 0.00
26 Upstand and Zocalo 9,289.00 - 9,289.00
27 Concrete Curb included - 0.00
28 Concrete Pad included - 0.00
29 Pedestal included - 0.00
30 PCCP - - 0.00
31 Sidewalk
TOTAL 12,401.58
CUMULATIVE TO DATE
Actual Usage Budget Variance % Done
Cc:
Engineering Div
Operations Div
President