FECHA

16-Sep-00 PLATAFORMA ARENQUE-A


POZO :ARENQUE 23

CEMENTACION DE T.R. 13 3/8" - 12.41"

VOL. TOTAL POZO Y PRESAS 119.00 M3


PROF. TOTAL 753 Mts.
LONG. T.R. 16" 405 Mts.
D.E. T.R. 16" 16 Pulg.
T.R. 30"
D.I. T.R. 16" 15.01 Pulg.
180 Mts.
CAP. INT. T.R. 16" (Lts/Mto) 114.16 Lts/Mto.
VOL. TOTAL EN T.R. 16" 46.23 M3
ALTURA DEL CMTO.
0 Mts. 0.00 M3 D.E. T.R. 13 3/8" 13 3/8 Pulg.
D.I. T.R. 13 3/8" 12.41 Pulg.
CAP. INT. T.R. 13 3/8" (Lts/Mto) 78.04 Lts/Mto.
T.R. 16" 9.52 M3 VOL. TOTAL EN T.R. 13 3/8' 58.76 M3
405 Mts. PESO T.R. 13 3/8" 68 Lbs/Pie
DIAM. POZO 14 3/4 Pulg.
CAP. INT. 14 3/4" 110.24 Lts/Mto.
VOL. TOTAL AGUJERO DESC. 38.36 M3
LONG. COPLE DE DESPLAZAMTO. 720 Mts.
VOL. TOTAL EN T.R. 13 3/8' HASTA EL COPLE 56.19 M3
56.19 M3 VOL. DEL COPLE AL FONDO 2.575 M3
T.R. 13 3/8" 68.0 # / Ft ALTURA CMTO. EN ESP. AN. ENTRE 16" Y 13 3/8" 0 Mts.
D.I. 12.41" VOL. DE ACERO T.R. 13 3/8" 9.72 M3
CAP. INT. 74.04 Lt/Mto.
CAP. AN. 16" Y 13 3/8"(Lt/Mto) 23.52 Lts/Mto.
VOL. AN. ENTRE 16" Y 13 3/8" 9.52 M3
VOL. AN. ENTRE 16" Y 13 3/8" A LA ALTURA CMTO. 0.00 M3
6.82 M3 VOL. AN. ENTRE 16" Y 13 3/8" EN TRASLAPE CMTO. 9.52 M3
CAP. AN. 14 3/4" Y 13 3/8" (Lt/Mto) 19.60 Lts/Mto.
VOL. AN. TOTAL ENTRE 14 3/4' Y 13 3/8" 6.82 M3
FACTOR 0.5067 S/D
FACTOR 0.1898 S/D

VOLUMENES:
COPLE DESPL. VOL. FINAL DEL POZO SIN T.R./ T.P. 84.59 M3
(+/-) 720 Mts.
VOL. EN PRESAS ANTES DE METER LA T.R. 34.41 M3
2.575 M3 SUMA VOLS. POZO Y PRESAS SIN T.R. / T.P. 119.00 M3
VOL. DEL ACERO DESPLAZADO POR LA T.R. 9.72 M3
FONDO PERFORADO VOL. FINAL DE LODO EN POZO CON T.R. ADENTRO 75.10 M3
753 Mts.
VOL. FINAL EN PRESAS C/T.R. EN EL FONDO. 44.13 M3
VOL. DESPLAZADO POR EL CEMENTO. 18.92 M3
VOL. DESCARTADO EN T.R'S. 16" Y 13 3/8" 0.00 M3
INCREMENTO DE VOL. POR T.R. Y CEMENTO 28.64 M3
VOL. FINAL LODO EN POZO CON T.R. CEMENTADA. 56.19 M3
VOL. FINAL EN PRESAS C/T.R. CEMENTADA. 63.05 M3
VOL. FINAL POZO Y PRESAS C/T.R. CEMENTADA 119.23 M3

PROGRAMA OPERATIVO:

1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK.
2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA).
3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS P/CEMENTAR.
4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION.
5.- BOMBEAR BACHE ESPACIADOR.
6.- BOMBEAR BACHE LAVADOR.
7.- MEZCLAR Y BOMBEAR LECHADAS DE CEMENTO (VOL = 20.13 M 3) DENS. DE 1.89 / 1.90 Gr/cc.
8.- SOLTAR TAPON DE DESPLAZAMIENTO.
9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CMTO. 56.20 M 3)
10.- ALCANZAR PRESION FINAL, SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION.
11.- ESPERAR TIEMPO DE FRAGUADO.

NOTA : LA CEMENTACION DE LA T.R DE 13 3/8" SERA HASTA LA SUPERFICIE POR LO CONSIGUIENTE NO QUEDARA NADA DE LODO ENTRAMPADO .

NOTA: SE REQUIERE EL APOYO DEL BARCO LODERO PARA PODER RECIBIR LOS VOLUMENES DESPLAZADOS

ELABORO:
LUCIANO ALVARADO Y NICOLAS INFANTE P. Vo. Bo. FCO. RIOS HDZ
I.T.F
QUIMICO CIA. M-I DRILLING FLUIDS SUPTTE. EN TURNO
DRILLING FLUIDS
DE MÉXICO
POZO: ARENQUE -31
PLATAFORMA : ARENQUE A

CEMENTACION DE T.R. 7 "

PROFUNDIDAD TOTAL 3880 Mts.


VOLUMEN FINAL POZO Y PRESAS 180 M3
DIAMETRO DEL POZO 8 1/2 Pulg.
CAPACIDAD INTERIOR AGUJERO DE 8.5" 36.61 Lts/Mto.
T.R. 13 3/8"
745 Mts. VOLUMEN TOTAL AGUJERO DESCUBIERTO 46.35 M3
LONGITUD DE LA T.R. 9 5/8 " 2614 Mts.
DIAMETRO EXTERIOR T.R. 9 5/8" 9 5/8 Pulg.
M3 DIAMETRO INTERIOR T.R. 9 5/8" 8.681 Pulg.
CAPACIDAD INTERIOR T.R. 9 5/8" 38.18 Lts/Mto.
34.91 M3 VOLUMEN TOTAL EN T.R. 9 5/8" 99.82 M3
T.R. 9 5/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO 3850 Mts.
2614 Mts.
DIAMETRO EXTERIOR T.R. 7 " 7 Pulg.
DIAMETRO INTERIOR T.R. 7 " 6.094 Pulg.
CAPACIDAD INTERIOR T.R. 7 " 18.82 Lts/Mto.
VOLUMEN TOTAL EN T.R. 7 " 73.01 M3
VOLUMEN TOTAL EN T.R. 7" HASTA EL COPLE 72.45 M3
VOLUMEN DEL COPLE AL FONDO 0.565 M3
72.45 M3 CAPACIDAD ANULAR EN 9 5/8" Y 7 " 13.36 Lts/Mto.
T.R. 7 " 32 # / Ft
D.I. 6.094" VOLUMEN ANULAR EN 9 5/8" Y 7 " 34.91 M3
CAP. INT. 18.82 Lt/Mto. CAP. ANULAR EN AGUJ. 8.5" Y T.R 7" 11.78 Lts/Mto.
VOLUMEN ANULAR EN 9 1/2" Y 7 5/8" 14.91 M3
PESO T.R. 7 " 32 Lbs/Ft.
VOLUMEN DE ACERO T.R. 7 5/8" 23.57 M3
14.91 M3 FACTOR 0.5067 S/D
FACTOR 0.1898 S/D

VOLUMENES:
VOL. FINAL DEL POZO SIN T.R. Y T.P. 146.16 M3
COPLE DESPLAZAMIENTO
(+/-) 3,850 Mts. VOL. EN PRESAS ANTES DE METER LA T.R. 33.84 M3
SUMA VOLS. POZO Y PRESAS SIN T.R. 180.00 M3
VOL. DEL ACERO DESPLAZADO POR LA T.R. 23.57 M3
30 Mts. VOL. DESPLAZADO POR EL CEMENTO. 50.39 M3
0.565 M3 INCREMENTO DE VOLUMEN POR T.R. Y CEMENTO 73.96 M3
VOL. EN PRESAS CON T.R. ADENTRO. 57.40 M3

FONDO PERFORADO VOL. EN POZO CON T.R. ADENTRO 122.84 M3


3,880 Mts. VOL. FINAL EN PRESAS CON T.R. CEMENTADA. 107.80 M3
VOL. FINAL EN POZO CON T.R. CEMENTADA. 72.45 M3
VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA 180.24 M3

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK.
2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA).
3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR.
4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION.
5.- BOMBEAR BACHE ESPACIADOR (3 M3).
6.- BOMBEAR BACHE LAVADOR. (5 M3).
7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA xx + xx DE BACHES = xx M 3) DENS. DE 1.89 Gr/cc.
8.- SOLTAR TAPON DE DESPLAZAMIENTO.
9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = xx M 3 / xx Bls)
10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION.
11.- ESPERAR TIEMPO DE FRAGUADO.

ELABORO: Vo. Bo.


NICOLAS INFANTE PEREZ / JUAN SAN ROMAN ROYER QUINTANILLA MTZ
QUIMICOS CIA. M-I DRILLING FLUIDS ING. DE PROYECTO PEMEX.
DRILLING FLUIDS
DE MÉXICO POZO : ARENQUE 23
PLATAFORMA : ARENQUE
FECHA : 12- OCT- 00
CEMENTACION DE T.R. 9 5/8"

PROFUNDIDAD TOTAL 2650 Mts.


VOLUMEN FINAL POZO Y PRESAS 225 M3
DIAMETRO DEL POZO 12 3/5 Pulg.
CAPACIDAD INTERIOR AGUJERO DE 12 1/4" 80.44 Lts/Mto.
VOLUMEN TOTAL AGUJERO DESCUBIERTO 153.25 M3
LONGITUD DE LA T.R. 13 3/8" 745 Mts.
DIAMETRO EXTERIOR T.R. 13 3/8" 13 3/8 Pulg.
DIAMETRO INTERIOR T.R. 13 3/8" 12.415 Pulg.
CAPACIDAD INTERIOR T.R. 13 3/8" 78.10 Lts/Mto.
23.21 M3 VOLUMEN TOTAL EN T.R. 13 3/8" 58.18 M3
T.R. 13 3/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO 2620 Mts.
745 Mts.
DIAMETRO EXTERIOR T.R. 9 5/8" 9 5/8 Pulg.
DIAMETRO INTERIOR T.R. 9 5/8" 8.68 Pulg.
CAPACIDAD INTERIOR T.R. 9 5/8" 38.18 Lts/Mto.
VOLUMEN TOTAL EN T.R. 9 5/8" 101.17 M3
VOLUMEN TOTAL EN T.R. 9 5/8" HASTA EL COPLE 100.02 M3
VOLUMEN DEL COPLE AL FONDO 1.145 M3
100.02 M3 CAPACIDAD ANULAR EN 13 3/8" Y 9 5/8" 31.16 Lts/Mto.
VOLUMEN ANULAR EN 13 3/8" Y 9 5/8" 23.21 M3
CAPACIDAD ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" 33.50 Lts/Mto.
VOLUMEN ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" 63.82 M3
PESO T.R. 9 5/8" 47 Lbs/Ft.
VOLUMEN DE ACERO T.R. 9 5/8" 23.64 M3
63.82 M3 FACTOR 0.5067 S/D
FACTOR 0.1898 S/D
BACHE LIMPIADOR. 5 M3
BACHE ESPACIADOR 5 M3

VOLUMENES:
COPLE DESPLAZAMIENTO VOL. FINAL DEL POZO SIN T.R. Y T.P. 211.43 M3
(+/-) 2645 Mts. VOL. EN PRESAS ANTES DE METER LA T.R. 13.57 M3
30 Mts. SUMA VOLS. POZO Y PRESAS SIN T.R. 225.00 M3
1.145 M3 VOL. DEL ACERO DESPLAZADO POR LA T.R. 23.64 M3
VOL. DESPLAZADO POR EL CEMENTO. 88.18 M3

FONDO PERFORADO INCREMENTO DE VOLUMEN POR.CEMENTO Y BACHES. 98.18 M3


2650 Mts. VOL. EN PRESAS CON T.R. ADENTRO. 37.21 M3
VOL. EN POZO CON T.R. ADENTRO 188.20 M3
VOL. FINAL EN PRESAS CON T.R. CEMENTADA. 125.39 M3
VOL. FINAL EN POZO CON T.R. CEMENTADA. 100.02 M3
VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA 225.41 M3

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK.
2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA).
3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR.
4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION.
5.- BOMBEAR BACHE ESPACIADOR ( +- 5 M3).
6.- BOMBEAR BACHE LAVADOR. (+- 5 M3).
7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO = VOL. DE LECHADA 501.8 BL / 79.79 M 3
8.- SOLTAR TAPON DE DESPLAZAMIENTO.
9.- INICIAR DESPLAZAMIENTO (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = 100.02 M 3 / 629.05 Bls)
10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION.
11.- ESPERAR TIEMPO DE FRAGUADO.

ELABORO: ING. NICOLAS INFANTE P. / CECILIO CERON C. Vo. Bo. ING. FCO. RIOS HERNANDEZ .
CIA. M-I DRILLING FLUIDS ING. PROYECTO. PEMEX. POZO ARENQUE -23.
POZO: ARENQUE -23
VOLUMEN DE LECHADA

PROFUNDIDAD TOTAL 2645 Mts.


CAP. INT. DE TR DE 9 5/8" 38.18 Lts/Mto.
CIMA TEORICA EN TR DE 9 5/8" 2620 Mts.
LONG. DEL CMTO. EN INT. DE TR DE 9 5/8" 25.00 Mts.
VOL. REQUERIDO PARA DESPLAZAR LECHADA 100.02 M3
VOL. CMTO. DENTRO DE LA TR DE 9 5/8" 1.15 M3
VOLUMEN ANULAR EN 13 3/8" Y 9 5/8" 23.21 M3
VOLUMEN ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" 63.8 M3
SUMA DE VOLUMENES 88,175 Lts.
DENSIDAD DE LA LECHADA 1.89 Gr/cc.
EXCESO 0.20 %

CANTIDAD DE 88,175.00 Lts.


SACOS CMTO. 38.03 Lts/Sco
SACOS 2319 Sacos
SACOS 2782 Sacos Más el 0.20 % de exceso 139,100
CANT. DE CMTO. 139,114 Kgs. 73597.9

VOLUMEN DE LECHADA 73,605 Lts. 5000


BACHE LIMPIADOR 5,000 Lts. 3000
BACHE ESPACIADOR 5,000 Lts. 81597.9
SUMA 83,605 Lts. 23,640.00
VOL. DEL ACERO T.R. 9 5/8" 23,640.00 Lts. 105,237.88

VOL. TOTAL POR DESPLAZAR 107,245 Lts.

Atte:
NICOLAS INFANTE P / CECILIO CERON C.
Químicos en Turno.

12-Oct-00
VOL. REQUERIDO DE LODO SIN PESO PARA AJUSTAR DENS. A 1.18 Gr/cc. PARA PROXIMA ETAPA

Volumen Pozo Con T.R. Cementada 54 M3


Volumen Necesario en Presas Para Iniciar a Perforar 70 M3
Volumen Total Para Iniciar a Perforar 124 V1 124 M3
Densidad Inicial 1.24 D1 1.24 Gr/cc
Volumen de Lodo Sin Peso Por Agregar ??? V2 X M3
Densidad del Lodo Sin Peso 0.90 D2 0.90 Gr/cc
Densidad del Lodo Por Retirar 1.24 D3 1.24 Gr/cc
Volumen de Lodo (1.24 gr/cc) Por Retirar ??? V3 X M3
Volumen Total Requerido de 1.18 Gr/cc 124 Vf 124 M3
Densidad Requerida Para Iniciar a perforar 1.18 Df 1.18 Gr/cc

(V1 * D1) + (V2 * D2) - (V3 * D3) = (Vf * Df)

124 1.24 X 0.90 X 1.24 124 1.18

153.8 X 0.90 X 1.24 146.3

153.8 0.34 X 146.3

153.8 146.3
X 0.34

X 21.9

V2 = 22 M DE LODO SIN PESO POR AGREGAR.


3

V3 = 22 M DE LODO DE 1.24 Gr/cc POR RETIRAR.


3

Vol. Y Dens. Resultante


Vol. Dens.
Lodo Inicial 139 1.24 172.36
Lodo Por Agregar 22 0.90 19.6941176
Resultante 161 1.19376 192.054118

ATENTAMENTE:

QUIMICOS EN TURNO
ARENQUE 23
VOLUMEN DE LECHADA

PROFUNDIDAD TOTAL 745 Mts.


CAP. INT. DE TR DE 13 3/8" 78.04 Lts/Mto.
CIMA TEORICA EN TR DE 13 3/8" 720 Mts.
LONG. DEL CMTO. EN INT. DE TR DE 13 3/8" 25.00 Mts.
VOL. REQUERIDO PARA DESPLAZAR LECHADA 56.19 M3
VOL. CMTO. DENTRO DE LA TR DE 13 3/8" 1.95 M3
VOL. ANULAR EN TR DE 16" Y TR DE 13 3/8" 9.52 M3
VOL. ANULAR EN AGUJ. DE 14 3/4" Y TR DE 13 3/8" 6.7 M3
SUMA DE VOLUMENES 18,137.16 Lts.
DENSIDAD DE LA LECHADA 1.89 Gr/cc.
EXCESO 0.11 %

CANTIDAD DE 20,140.00 Lts.


SACOS CMTO. 38.3 Lts/Sco
SACOS 526 Sacos
SACOS 584 Sacos Más el 0.11 % de exceso
CANT. DE CMTO. 29,185 Kgs.

VOLUMEN DE LECHADA 20,140 Lts.


BACHE LIMPIADOR 2,000 Lts.
BACHE ESPACIADOR 2,000 Lts.
SUMA 24,140 Lts.
VOL. DEL ACERO T.R. 7 5/8" 9,615 Lts.

VOL. TOTAL POR DESPLAZAR 33,755 Lts.

Atte:
LUCIANO ALVARADO NICOLAS INFANTE FECHA
Químicos en Turno. 16-Sep-00
POZO: lomitas No. 269
EQUIPO No. 325
FECHA: 25-sept-05
CEMENTACION DE T.R.LINER 7"
PROFUNDIDAD TOTAL 2670 Mts.
VOLUMEN FINAL POZO Y PRESAS 160 M3
DIAMETRO DEL POZO 8 1/2 Pulg.
CAPACIDAD INTERIOR AGUJERO DE 8.5 36.61 Lts/Mto.
T.R. 20" VOLUMEN TOTAL AGUJERO DESCUBIERTO -10.80 M3
26 Mts. LONGITUD DE LA T.R.9 5/8 2965 Mts.
DIAMETRO EXTERIOR T.R.9 5/8 9 5/8 Pulg.
DIAMETRO INTERIOR T.R. 7 5/95/8 8.535 Pulg.
CAPACIDAD INTERIOR T.R. 7 5/95/8 36.91 Lts/Mto.
CAPACIDAD TP 3 1/2" M3 VOLUMEN TOTAL EN T.R. 7 5/895/8 109.44 M3
27.43 M3 LONGITUD DE BL 7" AL COPLE 1966
CAP. TP 5" LONGITUD DEL COPLE DE DESPLAZAMIENTO 3663.66 Mts.
T.R. 13 3/8" DIAMETRO EXTERIOR TR 7" 7 Pulg.
602 Mts. DIAMETRO INTERIOR TR 7" 6.189 Pulg.
CAPACIDAD INT. TR 7" 19.41 Lts/Mto.
LONGITUD TR L. 7" 893.38 Mts.
VOL.TOTAL L. 7" HASTA EL COPLE 38.15 M3
VOLUMEN TOTAL DEL COPLE AL FONDO -19.285 M3
LONGITUD DE TRASLAPE 1714.00 Mts.
LONGITUD DE TR 9 5/8 A BL 150 Mts.
T.R. 9 5/8" 53.5 # / Ft
D.I. 8.535" VOL.ANULAR TR 8.5"-TR 7" 20.71 M3
CAP. INT. 29.4 Lt/Mto. CAPACIDAD ANULAR AG.8.5"-TR 7" 11.78 Lts/Mto.
BL 7" 2814.62 M. VOL.ANULAR AGUJERO 8.5" Y LIN.7" 12.25 M3
20.71 M3 PESO T.R.7" 29 Lbs/Ft.
9 5/8" 2965 M. VOLUMEN DE ACERO LINER 7" 4.92 M3
CAPACIDAD INT.TP 5" 9.25 Lts/Mto.
38.15 M3 VOL.DESP.POR EL ACERO TP 5" 19.5 Lb/Ft. 0.56 M3
VOL.INT. TP 5" 27.43 M3
12.25 M3 FACTOR 0.5067 S/D
FACTOR 0.1898 S/D
COPLE DESPLAZAMIENTO VOL.BACHE LAVADOR 5 M3
(+/-) 3663.66Mts.
VOL.BACHE ESPACIADOR 3 M3
VOL.DE LECHADA 13.68 M3
.
44.34 MTS. -19.285 M3 VOLUMENES:
VOL. FINAL DEL POZO SIN T.R. Y T.P. 98.64 M3
FONDO PERFORADO VOL. EN PRESAS ANTES DE METER LA T.R. 61.36 M3
3708Mts.
SUMA VOLS. POZO Y PRESAS SIN T.R. 160.00 M3
DENSIDAD DE LA LECHADA 1.90 g / cc. VOL. DEL ACERO DESPLAZADO POR LA TR.Y TP 5.47 M3
RENDIMIENTO DE AGUA 27.12 LTS/SCS VOL. DESPLAZADO POR EL CEMENTO Y BACHES 21.68 M3
RENDIMIENTO DE CEMENTO 49.79 LTS/SCS INCREMENTO DE VOL. POR T.R, CEMENTO Y BACHES 27.15 M3
VOL.DE LECHADA 13.68 M3 VOL. EN PRESAS CON T.R. ADENTRO. 66.83 M3
CANTIDAD DE SCS. CTO. 274.7 SCS. VOL. EN POZO CON T.R. ADENTRO 128.31 M3
TON. CEMENTO 13.7 TON. VOL. FINAL EN PRESAS CON T.R. CEMENTADA. 88.51 M3
VOL. DE AGUA 7.45 M3 VOL. FINAL EN POZO CON T.R. CEMENTADA. 147.59 M3
RENDIMIENTO DE PRODUCTOS. VOL. PARA DESPLAZAR EL CEMENTO 65.58 M3
VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA 236.10 M3

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK.
2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA).
3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR.
4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION.
5.- BOMBEAR BACHE ESPACIADOR (3 M3).
6.- BOMBEAR BACHE LAVADOR. (5 M3).
7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA 11 + 8 DE BACHES = 19 M 3) DENS. DE 1.90 Gr/cc.
8.- SOLTAR TAPON DE DESPLAZAMIENTO.
9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = + - 18.66 M 3 / 117 Bls)
10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION.
11.- ESPERAR TIEMPO DE FRAGUADO + - 24 HRS.

ELABORO: Vo. Bo.


CESAR MARIN ORTEGA.
QUIMICOS CIA. M-I DRILLING FLUIDS COORDINADOR / I.T.P. (PEMEX)