Professional Documents
Culture Documents
Railway
Project Management
&
Systems Engineering
Bill Whitmore
Project Technical Director, Fluor Mideast
Email: wswhitmore@yahoo.com
Slide No: 1
PM & SE Management
Overview
Overview Objectives
Typical Project
Systems Engineering
• Project attributes
Definitions
Critical Considerations
• What is systems engineering?
Recap
• Requirements
• Assurance
• Transverse Engineering
• Critical considerations
Slide No: 2
PM & SE Management
Overview
Objectives Objectives
Typical Project
Recap
systems engineering. Systems Engineering
Definitions
Requirements
• To be able to discuss project attributes Assurance
Objectives
Typical Project
Project Management
Project Attributes
Recap
A Systems Engineering
Definitions
Assurance
Transverse engineering
Critical Considerations
Recap
Slide No: 4
PM & SE Management
Slide No: 5
PM & SE Management
Slide No: 6
PM & SE Management
Slide No: 7
PM & SE Management
What the Client What the What was How the project
wanted salesman saw designed was documented
Slide No: 8
PM & SE Management
What the Client What the What was How the project
wanted salesman saw designed was documented
When it was
delivered
Slide No: 9
PM & SE Management
What the Client What the What was How the project
wanted salesman saw designed was documented
Slide No: 10
PM & SE Management
What the Client What the What was How the project
wanted salesman saw designed was documented
Slide No: 11
PM & SE Management
What the Client What the What was How the project
wanted salesman saw designed was documented
When it was What the Client The competitor’s What the Client
delivered was billed bid really needed
Slide No: 12
PM & SE Management
Overview
Objectives
Typical Project
Project Management
Project Attributes
Recap
Systems Engineering
What is Definitions
Requirements
Critical Considerations
Recap
Slide No: 13
PM & SE Management
Slide No: 14
PM & SE Management
Slide No: 15
PM & SE Management
Slide No: 16
PM & SE Management
Slide No: 17
PM & SE Management
Overview
Typical Project
Project Management
Recap
Definitions
• Constrained by Requirements
• Time Assurance
Critical Considerations
• Cost Recap
• Quality*
Slide No: 18
PM & SE Management
Overview
Typical Project
Project Management
Recap
Definitions
• Constrained by Requirements
– Time Assurance
Critical Consideration
• Cost Recap
• Quality*
Slide No: 19
PM & SE Management
Project Attributes
• Human endeavour
• Unique scope of works
• Constrained by
• Time
• Cost
• Quality*
Slide No: 20
PM & SE Management
Overview
Typical Project
Project Management
Recap
Definitions
• Constrained by Requirements
• Time Assurance
Critical Consideration
• Cost Recap
• Quality*
Slide No: 21
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
The scope of works delivered with the Recap
• Time Definitions
Requirements
• Cost Assurance
• Quality*
Critical Consideration
Recap
Slide No: 22
PM & SE Management
Overview
Typical Project
Recap
Definitions
• Unrealistic expectations – 9.9% Requirements
Critical Considerations
Slide No: 23
PM & SE Management
Overview
Typical Project
Recap
– Employer’s Requirements Systems Engineering
Requirements
Assurance
Recap
Slide No: 24
PM & SE Management
Overview
Typical Project
Recap
– Interface management Systems Engineering
Requirements
Assurance
Recap
Slide No: 25
PM & SE Management
Overview
Objectives
Typical Project
Project Management
Project Attributes
Recap
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 26
PM & SE Management
Overview
Objectives
Typical Project
Project Management
Project Attributes
Recap
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 27
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
Systems Engineering
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 28
PM & SE Management
Overview
Typical Project
• A system is a construct or collection of different Project Management
elements that together produce results not Project Attributes
obtainable by the elements alone. The elements, or Recap
parts, can include people, hardware, software, Systems Engineering
facilities, policies, and documents; that is, all things Definitions
required to produce system S-level results. The Requirements
results include system level qualities, properties, Assurance
characteristics, functions, behavior and Critical Considerations
performance. The value added by the system as a Recap
whole, beyond that contributed independently by the
parts, is primarily created by the relationship among
the parts; that is, how they are interconnected’
Slide No: 29
PM & SE Management
Overview
Typical Project
• A system is a collection of: Project Management
– hardware,
Recap
Systems Engineering
– software, Definitions
– facilities, Requirements
Assurance
– policies, Critical Considerations
– documents; Recap
Slide No: 30
PM & SE Management
Overview
Typical Project
Project Attributes
Recap
Systems Engineering
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 31
PM & SE Management
Overview
Typical Project
Recap
development of large and complex Systems Engineering
systems Definitions
Requirements
Assurance
Typical Project
Recap
into a functional unit that meets the Systems Engineering
Requirements
Assurance
Critical Considerations
Recap
Slide No: 33
PM & SE Management
Overview
Typical Project
Recap
Requirements
Recap
Slide No: 34
PM & SE Management
Overview
Objectives
Typical Project
Project Management
Project Attributes
Recap
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 35
PM & SE Management
Requirements
RAILWAY
RAILWAY RAILWAY
RAILWAY RAILWAY
Slide No: 36
PM & SE Management
Overview
Typical Project
Recap
Requirements
• Measure progress
Critical Considerations
Recap
Slide No: 37
PM & SE Management
Overview
Requirements Objectives
Typical Project
Recap
Systems Engineering
Requirements
Assurance
Recap
Slide No: 38
PM & SE Management
Overview
Requirements Objectives
Typical Project
Recap
Systems Engineering
Requirements
operational Assurance
Critical Considerations
Recap
Slide No: 39
PM & SE Management
Overview
Typical Project
Recap
Definitions
• O&M Requirements
• Reliability Assurance
Critical Considerations
Recap
• Mandatory
• Preferential
Slide No: 40
PM & SE Management
Overview
Typical Project
Recap
infrastructure operators, maintainers,
Systems Engineering
TOCs, RSSB, ORR…. Definitions
Requirements
Assurance
Typical Project
Recap
• Level 1 – Client, National Legislation
Systems Engineering
• Level 2 – System Definitions
Recap
Slide No: 42
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
What are typical stakeholder requirements Recap
1. Definitions
Requirements
2. Assurance
3. Critical Considerations
Recap
4.
5.
6.
Slide No: 43
PM & SE Management
Requirement Trade-offs
Capacity Journey Time
Lifecycle Cost
Comfort
Slide No: 44
PM & SE Management
Overview
Typical Project
Project Management
Recap
Systems Engineering
subsystems Requirements
Assurance
Critical Considerations
subsystems
Slide No: 45
PM & SE Management
Overview
Typical Project
Project Management
Systems Engineering
Definitions
Assurance
systems do not affect performance Critical Considerations
Recap
Slide No: 46
PM & SE Management
Slide No: 47
PM & SE Management
‘V’ Model
Slide No: 48
PM & SE Management
*Validation Handover
A *
SYSTEM Functional & Operational Dynamic Integration Tests V
System Verification
P Validation PHASE 7 Test Running
P Specifications Specifications [Site Acceptance Tests] E
O R
R I
The Engineer
M Requirements
E I
N O
T DESIGN N
SubSystem Verification
DESIGN PHASE 3 Post Installation PHASE 1 Civils: Infrastructure Facilities Inspections
SUBSYSTEM DESIGN
DESIGN PHASE 2 IRNs
*
Definition PHASE 1 Systems: FAT-C, FAT-SS
PHASE 1 Production Tests
PB #7
PB
PB # 6
PB #5
PB X
PB # 6
PB 7
S#
5
S#
#
S#
S
S
S
S
S
X
PB S #
PB
PB #4
PB #3
PB # 2
1
S#
PB S #2
S# 3
S
S
S
PB
PB S #
4
PB
1
Whitmore
* All validation & verification is by directional
Slide No: 49
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
ER Employer’s Requirements Part 1
Part 1
. Recap
Systems Engineering
. Requirements
ER
Part 2 .
Assurance
.,
Critical Considerations
Recap
Employer’s Requirements Part 3
ER
Part 3
.
.
Slide No: 50
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
ER Employer’s Requirements Part 1
Part 1
Big picture stuff, applicable to all Recap
Systems Engineering
. Requirements
ER
Part 2 .
Assurance
.
Critical Considerations
Recap
Employer’s Requirements Part 3
ER
Part 3
.
.
Slide No: 51
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
ER Employer’s Requirements Part 1
Part 1
Big picture stuff, applicable to all Recap
Systems Engineering
Recap
Slide No: 52
PM & SE Management
Presentation of Requirements
300 Employer’s Requirements 315 Employer’s Requirements
Part 1 Part 2 Appendices (Master Plans)
301 ER Part 1 316 App 01 - Earthing & Bonding Plan
317 App 02 - EMC Plan
310 Employer’s Requirements 318 App 03 - Environmental Plan
Part 2
319 App 04 - Interface Management Plan
311 ER Part 2 – Civils
320 App 05 - Interface Control Template
312 ER Part 2 – Rail Systems
321 App 06 - Noise & Vibration Plan
313 ER Part 2 – Rolling Stock
322 App 07 - POMP
323 App 08 - Project Glossary of Terms
324 App 09 - Requirements Management
325 App 10 - Site Safety Plan
326 App 11 - Assurance Management
327 App 12 - Testing & Commissioning
Slide No: 53
PM & SE Management
Overview
Typical Project
Project Management
Project Attributes
ER Employer’s Requirements Part 1
Part 1
Big picture stuff, applicable to all Recap
Systems Engineering
Critical Considerations
Recap
Employer’s Requirements Part 3
ER 12 Performance Specs (Rail Systems)
Part 3
8 Technical Specs (Non Rail Systems)
Slide No: 54
PM & SE Management
Presentation of Requirements
330 Employer’s Requirements – Pt 3 Employer’s Requirements – Pt 3 (Cont)
331 PS01 AFC 343 TS01 Architecture
332 PS02 AVLS 344 TS02 Civil Structures
333 PS03 Communications 345 TS03 Depot Design & Buildings
334 PS04 Depot Workshop Equipment 346 TS04 Earthworks
335 PS05 Operational Signage 347 TS05 Non Operational Signage
336 PS06 Operations Control Centre 348 TS06 Lifts and Escalators
337 PS07 Road Traffic System 349 TS07 MEP
338 PS08 Rolling Stock 350 TS08 Track
339 PS09 SCADA
340 PS10 Signalling
341 PS11 Traction Power
342 PS12 UPS
Slide No: 55
PM & SE Management
*Validation Handover
A *
SYSTEM Functional & Operational Dynamic Integration Tests V
System Verification
P Validation PHASE 7 Test Running
P Specifications Specifications [Site Acceptance Tests] E
O R
R I
The Engineer
M Requirements
E I
N O
T DESIGN N
SubSystem Verification
DESIGN PHASE 3 Post Installation PHASE 1 Civils: Infrastructure Facilities Inspections
SUBSYSTEM DESIGN
DESIGN PHASE 2 IRNs
*
Definition PHASE 1 Systems: FAT-C, FAT-SS
PHASE 1 Production Tests
PB #7
PB
PB # 6
PB #5
PB X
PB # 6
PB 7
S#
5
S#
#
S#
S
S
S
S
S
X
PB S #
PB
PB #4
PB #3
PB # 2
1
S#
PB S #2
S# 3
S
S
S
PB
PB S #
4
PB
1
Whitmore
* All validation & verification is by directional
Slide No: 56
PM & SE Management
Overview
Typical Project
Project Management
Recap
Requirements
– Product (proven, tested) Assurance
Recap
Slide No: 57
PM & SE Management
Overview
Typical Project
Recap
Requirements
– RAMS Assurance
Recap
– EMC
– Earthing & bonding
Slide No: 58
PM & SE Management
Overview
Recap Objectives
Typical Project
Recap
engineering. Systems Engineering
Definitions
Requirements
• Discuss project attributes and the Assurance
Objectives
Typical Project
Project Management
Project Attributes
Recap
Definitions
Requirements
Assurance
Critical Considerations
Recap
Slide No: 60