You are on page 1of 2

OPERATION & MAINTENANCE MANUAL MARINA COM 05

PART 8

AEROSOL SYSTEM (BY OPTIMAL SOLUTIONS)

1) Description of the overall system.


2) General operation plant, starting up and shutting down procedures, location of
each equipment, normal and emergency operation of system/equipment, control
setting and tolerances.
3) Size and capacity of all the major equipment and components of the system.
4) The proposed initial setting of protective devices and other adjustable
components of the system. Space shall be reserved for the insertion of final
commissioned and accepted settings.
5) Normal sequence of equipment and plant operation and alternative sequence to
maintain operation of part of the total facilities during abnormal circumstances.

SECTION B: - TECHNICAL SPECIFICATION

1. EQUIPMENT SCHEDULE (Quantities, model, make, type, location


Etc.)

2. CATALOGE,CERTIFICATE AND PERFORMANCE DATA

3. MANUFACTURER DRAWINGS

4. WIRING DIAGRAMS

SECTION C: - OPERATING AND MAINTENANCE INSTRUCTIONS

1. INSPECTION MANUAL FOR ALL SYSTEM / EQUIPMENT

2. OPERATION MANUAL FOR ALL SYSTEM / EQUIPMENT

3. MAINTENANCE INSTRUCTIONS

4. PRECAUTIONS DURING OPERATION AND MAINTENANCE

5. PROCEDURE FOR SYSTEM FAULT FINDING.

SECTION D: - COPIES OF MATERIAL SUBMITTAL

Page 1 of 2
OPERATION & MAINTENANCE MANUAL MARINA COM 05

SECTION E: LIST OF SPARES

SECTION F: - MANUFACTURER GUARANTEE & WARRANTIES

`
SECTION G: - MANUFACTURER / SUPPLIER LOCAL ADDRESS & CONTACT-

DETAILS

SECTION H: - ORGANIZATION OF MAINTENANCE TEAM

SECTION 1: - TESTING & COMMISSIONING REPORT

SECTION J: - LIST OF AS BUILT DRAWINGS

Page 2 of 2

You might also like