Professional Documents
Culture Documents
Maintenance Protocol
System
Maintenance Protocol
Customer:
Address:
Fax / E-Mail:
Fax / E-Mail:
Department: Room:
Material-No.: Serial-No.:
Contract-No.: Expire date:
Order-No.: System - ID:
MAMMOMAT Inspiration
MAMMOMAT Revelation
Mammomat Fusion
The instructions XPW7-000.831.01.02.XX are required for this protocol
2 Protocol Date: Serial-No.:
*) For imaging systems: The result of the image quality check shows no deviation from
the reference values.
Signature:
Date: Name:
Signature:
Date: Name:
Remarks:
1 Introduction
1.1 Safety guidelines
1.1.1 Symbols
1.1.2 Hazard keys
1.4 Requirements
1.4.1 Protocol
1.4.2 Required documents
1.4.3 Personnel requirements
1.4.4 Passwords
1.4.5 Required tools
1.4.6 Measuring equipment
1.4.7 Test phantoms
1.4.8 Cleaning products
2 Visual Inspections
2.1 MammoUnit
PM Check mammography unit for alignment and secure mount‐
ing
PMF Check the tube arm cover and the opening to the collimator
for damage or unusual conditions.
SI Check stand cover for damage
SI Check object table for damage
SI Check operating elements for damage
SI Check display stand for damage
SI Check face protection for damage
3.3 Options
3.3.1 Magnification table (optional)
SI Check the function of the magnification table
3.3.2 Biopsy (optional)
SI Check function of biopsy unit
3.3.3 Tomosynthesis (optional)
SI Check the tomosynthesis function.
4.2 Workstation
PMP Inspecting the workstation housing (WH AWS)
5 Quality check
5.1 Artifact detection in image
PMF Check image on monitor for artifacts, defect lines, grid lines,
visible collimator blades.
6 Safety checks
6.1 General information
siemens-healthineers.com