Hence a good
planning and co-ordination will be vital towards successful completion of dry dock.
1. To brief engine room staffs before docking and ensure they under stand their respective
duties.
2. Preparation of machinery survey in dry dock
3. Preparation of dry dock list .
4. Study previous dry dock reports and note clearance to be measured .
5. Ensure all tools and spares are ready for use .
6. Liaise with the shipyard manager and contractor to ensure correct works carried out .
7. Emergency lightening and generator set to be tested before docking in case of shore
power failure.
8. Fire fighting equipments on board to be checked and tested and make ready for use .
9. All tanks, wells and coffer dams to be sound and recorded.
10. Minimum bunker and ballast to be carried.
11. To ensure filter elements in oily water separator and renewed and system is checked and
system is checked for satisfactory function.