You are on page 1of 1

Test PM Induction May 2017

Working time: 240 minutes (4h)


1. (2 points) For a project using both internal and external sample, please describe
the Project flow from the moment the field is closed until the study is closed in all
applications. Please summarize all the tasks done by the project team members.

2. (5 points) You have been assigned on the Kinder +Sport ITA 2016 project- the
materials are attached. Please analyze the quotation file (Inputs IIS tab) and the
questionnaire and prepare the following:

- An email where you confirm the project specs with the client;
- An email for providing questions/comments/suggestions to the client in
regards to the questionnaire;
- The estimative timing of the project- just build up a table reflecting the project
schedule.

3. (4 points) Using the same materials (questionnaire and quotation file), please
create the quota file that will be sent to the SW and FC. Make sure to include any
soft quotas required and also to use the main and boost structure.

4. (2 points) For the questionnaire from exercise 2, please identify the screening
questions that will be taken into consideration for the incidence calculation. For
this purpose please create a file with the screening table (both screenouts and
quotafulls) that will be sent in scripting.

5. (2 points) Please create a short questionnaire (that includes also the specs for
programming) in order to identify the target:

Target 1: males and females, 18-50, from Malaysia


Target 2: males and females, 18-50, from Malaysia who use myteksi application at
least twice a week for going to work.

6. (1.5 points) Please describe what is the information that should be contained in
the 48H report that you would receive from the Field Coordinator on your study.
Also, explain what is that impact that each change might have on the study.

7. (1.5 points) Which is the difference between a soft launch and a full launch?
Please describe the significance and advantages/disadvantages of each one.

You might also like