4G ‘Contract Nos. RDA/SEEP/CONT-S4 Contractor's General
Projet Names: Gonstucton of Exenson of .
S Souttem Bavessnoy,Secions-Uataats | Submission (CGS)
FSDI Hambaricia
[Part A; To be prepared by Contractor
“To: Engineer's Representative [Wr.Dong Wei
Subject Verification for the Theoretical Elongation Calculations of BRI 4 ~ P15 and P16,
‘Submission Ref. No. ICHECICGSMOTRT
‘Outgoing Log No, [CHECIRDA/SEEP/CONTISA01.2 110003805
‘Specification Reference
Drawing Reference ee attachment
Location of Works = [Bridge BR-04-P7S and PTS
‘SUBMISSION DETAIL
Purpose of Submission : 2] 1-Fortfornsion Racers; 2-For Approval; 8-ForConsincon: 4~As butt
Description of Content
With reference to your comments on general submission CHECICGSIO101/R0 dated on O4th September 2017 regarding
the above subject, our comments are as follows,
We are here with re-submitting the Theoretical calculations of the BRI 4-P15 and P16 referring to the designer who has
|conceded material properties,
Pre-stressing force Ps at each section can be caleulated from below equation
Ps= Po e-(kx +y 0) ;( Designer's has used same Equation for the calculation: 7
lwnere,
| P- Pre-stress force (without Ioss),
| Ps ; (T))=Force at the jacking end
|. PO ; (7x)=Force at distance x from jacking end
+ orzo engin (rece eng ofthe tncon each secon
Vand at or veria! ana Horzortal cuvette caret oe tndon length
x: Sacionaengnoftondon at each secon bang conlered (ath ces corecon and pemanent anchorage
jain corecion)
i anda are engent teen a each en of esetonin relevant rectons
/e-rota argent cfrene at onch en othe secn beng conced
besiners hs considered materal properties as ows, (ease ret testched design cleuson) Cleustons ot
fenden fc ae etngaton are made using asumadvluos er he end are (A) ane oc cectay (2)
sonsatons measied dung stossng operators wre cin of lraess, acta vais of Ap an opera
feo of stand shout be used io resone iecropancis, gen
Using Gsvanzed Metal Sreoth mate propates,
[curate cect Freon eaican 0's
tera! Cot wots cooicenn
Sao Stand $534 mn
ava er Stand, Ape tad na
Snodor tasty €
| Mens Sgt
[Theoretical elongation values, Liwhere calculated by using numerical formula,
PPX) /ADES)
were; Average pre stress force, Pp = (Ps + P)2 or Pp = P(1- etx +9) /(ke 46)
0.004
Designer's considered tendon length and our calculation length is defferent, because in the actual site situation, we
Jconsider the permanent anchorage length for the calculations. (Ploase refer the attached manufacture details for
[anchorage length =80mmn)
|Your esriest reply on this regards will be highly appreciated
Thank you
From f Contractor's Representative/Project Manager
Name/Wang Senyan 2
Date:" 21-Dec-17
signature dite Ff NiA Wang Xiao Hue[ Shen Hong Zhan
[Subcontractror| Originator_| Checked By
Distibution Remarks[FaRrBS To be Completed by Eraineer
“Reviewed &iniie with) B- Reviewed wit Commans FAIS SoM
Contact incorporate comments end proceed |__and resubmit
Re Retuned
Not reviewed
| Aeetig? Charge 7 Vafege P= Pad Raise oho
hoe tis LO lng ete tb te
Af B2- Foo Ayumed Modedlef 2f 1 F2°62 Bit
Abe acl
Pc Ge a te tt Pek A)
TL | Wer Doge zif-w-3}