4G ‘Contract Nos. RDA/SEEP/CONT-S4 Contractor's General Projet Names: Gonstucton of Exenson of . S Souttem Bavessnoy,Secions-Uataats | Submission (CGS) FSDI Hambaricia [Part A; To be prepared by Contractor “To: Engineer's Representative [Wr.Dong Wei Subject Verification for the Theoretical Elongation Calculations of BRI 4 ~ P15 and P16, ‘Submission Ref. No. ICHECICGSMOTRT ‘Outgoing Log No, [CHECIRDA/SEEP/CONTISA01.2 110003805 ‘Specification Reference Drawing Reference ee attachment Location of Works = [Bridge BR-04-P7S and PTS ‘SUBMISSION DETAIL Purpose of Submission : 2] 1-Fortfornsion Racers; 2-For Approval; 8-ForConsincon: 4~As butt Description of Content With reference to your comments on general submission CHECICGSIO101/R0 dated on O4th September 2017 regarding the above subject, our comments are as follows, We are here with re-submitting the Theoretical calculations of the BRI 4-P15 and P16 referring to the designer who has |conceded material properties, Pre-stressing force Ps at each section can be caleulated from below equation Ps= Po e-(kx +y 0) ;( Designer's has used same Equation for the calculation: 7 lwnere, | P- Pre-stress force (without Ioss), | Ps ; (T))=Force at the jacking end |. PO ; (7x)=Force at distance x from jacking end + orzo engin (rece eng ofthe tncon each secon Vand at or veria! ana Horzortal cuvette caret oe tndon length x: Sacionaengnoftondon at each secon bang conlered (ath ces corecon and pemanent anchorage jain corecion) i anda are engent teen a each en of esetonin relevant rectons /e-rota argent cfrene at onch en othe secn beng conced besiners hs considered materal properties as ows, (ease ret testched design cleuson) Cleustons ot fenden fc ae etngaton are made using asumadvluos er he end are (A) ane oc cectay (2) sonsatons measied dung stossng operators wre cin of lraess, acta vais of Ap an opera feo of stand shout be used io resone iecropancis, gen Using Gsvanzed Metal Sreoth mate propates, [curate cect Freon eaican 0's tera! Cot wots cooicenn Sao Stand $534 mn ava er Stand, Ape tad na Snodor tasty € | Mens Sgt [Theoretical elongation values, Liwhere calculated by using numerical formula, PPX) /ADES) were; Average pre stress force, Pp = (Ps + P)2 or Pp = P(1- etx +9) /(ke 46) 0.004 Designer's considered tendon length and our calculation length is defferent, because in the actual site situation, we Jconsider the permanent anchorage length for the calculations. (Ploase refer the attached manufacture details for [anchorage length =80mmn) |Your esriest reply on this regards will be highly appreciated Thank you From f Contractor's Representative/Project Manager Name/Wang Senyan 2 Date:" 21-Dec-17 signature dite Ff NiA Wang Xiao Hue[ Shen Hong Zhan [Subcontractror| Originator_| Checked By Distibution Remarks [FaRrBS To be Completed by Eraineer “Reviewed &iniie with) B- Reviewed wit Commans FAIS SoM Contact incorporate comments end proceed |__and resubmit Re Retuned Not reviewed | Aeetig? Charge 7 Vafege P= Pad Raise oho hoe tis LO lng ete tb te Af B2- Foo Ayumed Modedlef 2f 1 F2°62 Bit Abe acl Pc Ge a te tt Pek A) TL | Wer Doge zif-w-3}

You might also like