Sample Projects for Experience of Eng. Nasser Zohny 
1 of 2 

1. Wady El Nile Hospital Extension in Cairo, 500 beds, consisting of
main building  built up area of 120,000 sq. m., Car Park Build‐ 
ing of 16 levels for parking of 800 cars, three services buildings,
and hotel building of 9000 sq. m. built up area, construction cost
650 Million L.E, construction started  on 2007 and comple‐ tion
About Nasser Zohny: is expected on 2015.
2. Zayton Court Building, 2B+G+8 with total built up area 12,000
B.Sc. degree in Civil engineering sq. m.,  construction cost 75 Million L.E., Cairo, construction

department, faculty of started  on 2009 and completed on  2014.
engineering, Cairo University, 1988.  3. Al Zohoor club (New Cairo), Social and Sports Club, social
building, 3 sports buildings, swimming pools, many playing
Diploma in projects management  courts (football, handball, basketball, squash, tennis, etc.), con‐ 

at Ain Shams University, 2000.  struction cost 262 Million L.E., construction started  on 2009
and completion achieved by  2014.
Registered Project Management  4. Restoration of National Cancer Institute (N.C.R), built up area

Professional IPMA. 14,000 sq. m., construction cost 95 Million L.E, construction
started  on 2007 and completed on  2013.
5. Center of Radio and Television Broadcasting in  Elmokatum,
built up area about 10,000 sq. m., construction cost 76 Million
L.E., construction started  on 2007 and completed on 2011.

ProService
Sample Projects for Experience of Eng. Nasser Zohny 
2 of 2 
6. Students Housing Buildings of Al Azhar University, construction
cost 35 Million L.E, construction started  on 2013 and comple‐ 
tion is expected on 2015.

7. Zayton Hospital, 62 beds, built up area of 20,000 sq. m.,  con‐ 
struction cost 82 Million L.E., construction started  on 2003 and
completed on 2008.

The Main Festival Hall in Radio & Television Union in Maspiro,
8.
construction cost 6 Million L.E., started and completed  on 2005.

Restoration of Mohammed Ali Palace, construction cost 50 Mil‐ 
9.
lion L.E., construction started  on 2006 and completed on 2009.

Restoration of Moied Shekh Mosque, construction  cost 18 Mil‐ 
10.
lion L.E., construction started  on 2003 and completed on 2006.

Forsan 3 Residential and Commercial Buildings, built up area of
11. 12,000 sq. m., construction cost 30 Million L.E., construction
started  on 2000 and completed on 2003.

Boryvage Fayed Resort,  Housing & Administration Buildings,
12.
swimming pools, services building, water treatment plant, trans‐ 
formers station, roads, landscape,  etc., construction cost 120
Million L.E.
, construction started  on 1995 and completed on 1998. 

ProService
 Contracting projects in Egypt

Cairo American College, Phase II .

Scope of works : 
• Construction
Electrical, HVAC, Fire

Fighting, Plumbing, for

Cairo American College Project 

Middle School Building and Libarary 
“Cairo‐ Maadi ” 

Main Contractor : Rowad Modern 
Engineering 

MEP Design Consultant : Wassef 
Design Office 

Cairo American College Building is 
consists of ( Basement + Gr. + 1st + 
2nd + 3rd + Roof) Floors with 

total Built‐Up Area of 3,500 m 2 .

ProService
 Contracting projects in Egypt

Cairo American College, Phase I .

 Scope of works :

• Construction
• Electrical, HVAC, Plumbing,
Irrigation and Fire Fighting
Work For Cairo American
College “C.A.C” Al Maadi

Main Consultant : RMC " RAAFAT 
MILLER CONSULTANT " 

MEP Consultant : ECO “Engineering 
Consultant Office ” 

ProService
Contracting projects in Egypt

Le Meridian Hotel 

Scope of works : 
• Construction

Electrical, HVAC, Fire Fighting,

Plumbing, for Le Meridian
Hotel – “Cairo ‐ Heliopolis ”

ProService
 Contracting projects in Egypt

Egyptian Radio Television Union 

(ERTU) Finishing Works 
Scope Of Work :  
• Insulation works for roofs

• Painting works for ground
floor

Polishing and finishing the

surface for Granite and
Marble

Installing new marble and

granite for walls  and
floors .

 Total Cost = 2,000,000 L.E

ProService
Contracting projects in Egypt

Al‐ Azhar Institutes Sector 
Building Finishing Works 
Scope Of Work: 
• Insulation Works
• Marble works for floors
and walls
• Ceramic works for floors
and walls

• False ceiling works
• Plastering and painting
works
• Electric and Plumbing
works
• Rapair works for concrete
elements
 Total Cost = 4,800,000 L.E

ProService
Contracting projects in Egypt

  Al‐ Azhar Stores in Darasa


 Construction and Finishing Works
 :Scope Of Work
• Site Construction Works
• Concrete Works

• Block Works

• Insulation Works

• Finishing Works

• MEP Works

 Total Cost = 21,000,000 L.E

ProService
Contracting projects in Egypt 

Lesaffre New Warehouse ( Nubaria ) 
  

 Structural & Architectural Works

Scope Of Work: 
Concrete work for footings

• Steel work for main building
(steel structure)

• Finishing works :
Block works ,Plaster,
painting and landscape
works.

 Total Cost : 5,400,000 L.E
Contracting projects in Egypt 

Stone Park Project ( New Cairo )                 

Structural Works 

Scope Of Work : 
• Concrete works for 8 buildings.
• Each building contain ground
floor and 4 typical floors .
• Concrete works for ( Footings,
Smells, Slab on grade, Columns ,
Slabs and stairs ).

Total Cost : 7,000,000  L.E 

ProService
ContractingprojectsinEgypt

RKW Vistaflex Civil Works


StructuralWorks

ScopeOfWork:

• Civil Works for Vistaflex Foundation

Civil works includes excavation,

• P.C for footing, R.C for footing,

insulation works, Backfilling

Works, Anti-static epoxy

installation, Joint sealant

installation.


Total Cost =2,200,000 L.E

ProService
ContractingprojectsinEgypt

RKW Warehouse Extension

Structural, Architectural and


Electromechanical Works

ScopeOfWork:
• Concrete Works, Masonry Works
Finishing Works

• Steel Structure for main Building

• MEP Works

TotalCost:25,000,000L.E
Contracting projects in Egypt

Renovation of Pharmacy Building in


 Maadi

 Finishing and MEP Works 


 :Scope Of Work

• Finishing Works

• Landscape Works

• MEP Works

 Total Cost = 26,440,000 L.E

ProService
We are keen to establish a good start for our intended long‐term 
business relationship. 

Please don't hesitate to contact us: 

ProService

The Engineering Company for Projects Services 
  95Hafez  Ramadan  St., 
11371 Nasr City,  Cairo, 
Egypt. 

Tel   : +(202) 23546739 /49  info@proservice.com.eg 
Fax  : +(202) 235 46 368  www.proservice.com.eg 

ProService ProService ProService ProService

You might also like