G3520C Generator Set GZB00001-UP(SEBP5411 - 00)/Basic Search Page 1 of 3

Shutdown SIS

Previous Screen

Product: GENERATOR SET


Model: G3520C GENERATOR SET GZB
Configuration: G3520C Generator Set GZB00001-UP

Operation and Maintenance Manual


G3500C and G3500E Generator Sets
Media Number -SEBU7681-11 Publication Date -01/04/2008 Date Updated -04/04/2008

i02246950

Rotating Rectifier - Check


SMCS - 4465-535

Check the exciter armature. Ensure that the rotating rectifier is tight. If a failure of a rectifier is
suspected, proceed to the "Testing a Three-Diode Rectifier Block" section.

Testing a Three-Diode Rectifier Block

Illustration 1 g00610240

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 10/20/2008
G3520C Generator Set GZB00001-UP(SEBP5411 - 00)/Basic Search Page 2 of 3

Illustration 2 g00613971
Three-Diode Rectifier Block (two pieces)

The following procedure tests all three diodes within a block. Check the positive rectifier block and the
negative rectifier block. If any meter reading does not fall within the given ranges, replace the rectifier
block.

1. Set the digital multimeter on the diode range. Remove all leads from the rectifier block.

2. To test the negative rectifier block, follow these steps:

a. Place the red test lead on the negative "-" terminal. Place the black test lead on the
following rectifier terminals: "AC1" (3), "AC2" (4) and "AC3" (5). All readings on the
meter should be between 0.4 and 1.0.

b. Place the black test lead on the negative "-" terminal. Place the red test lead on the
following rectifier terminals: "AC1" (3), "AC2" (4) and "AC3" (5). In all cases, the meter
should read "OL" (overload).

3. To test the positive rectifier block, follow these steps:

a. Place the red test lead on the positive "+" rectifier terminal. Place the black test lead on the

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 10/20/2008
G3520C Generator Set GZB00001-UP(SEBP5411 - 00)/Basic Search Page 3 of 3

following rectifier terminals: "AC1" (3), "AC2" (4) and "AC3" (5). In all cases, the meter
should read "OL" (overload).

b. Place the black test lead on the positive "+" rectifier terminal. Place the red test lead on the
following rectifier terminals: "AC1" (3), "AC2" (4) and "AC3" (5). All readings on the
meter should be between 0.4 and 1.0.

Note: A shorted diode can cause damage to the exciter rotor. If a diode is shorted, check the exciter
rotor. Refer to the Testing and Adjusting, "Winding - Test" and Testing and Adjusting, "Insulation -
Test". Perform these tests.

Note: This rectifier block also contains varistor "CR7". "CR7" can be checked by measuring the
resistance between the positive "+" rectifier terminal and the negative "-" rectifier terminal. The
resistance should be a minimum of 15000.

Copyright 1993 - 2008 Caterpillar Inc. Mon Oct 20 15:48:37 UTC+0200 2008