VAMSADHARA PROJECT PHASE II OF STAGE II

HIRAMANDALAM RESERVOIR Friction loss coefficient = Kf = 0.00394 x L/R^1.2


A B DIVERSION ROAD - HYDRAULIC CALCULATIONS Velocity = V = 4.43x(H/(1+Ke+Kf))^0.5
Q = CM 3/4 Where C is taken as 14 and M in Sq Km

Wetted Hydraulic Length of Head on Friction Discharge No. of


Chainage C.A in C.A in SQ Discharge Pipe Dia C/S Area Perimeter Mean Culvert Up Streem loss Velocity per pipe Pipes
SL NO DESCRIPTION in Km Hec KM in Cumecs (mm) (sq.m) (m) Radius (m) (m) coefficient (m/sec) (cum) Required
M Q= CM^(3/4) d A P R=A/P L H Kf V Q=AxV

1 Pipe Culvert 1.227 10.600 0.106 2.601 900 0.636 2.83 0.225 19.300 0.2 0.455 1.589 1.011 3

2 Pipe Culvert 2.050 40.000 0.400 7.042 1200 1.131 3.77 0.300 13.900 0.22 0.232 1.800 2.036 4

3 Box Culvert 2.640 52.300 0.523 8.610 1200 1.131 3.77 0.300 15.000 0.2 0.251 1.705 1.928 5

4 Pipe Culvert 3.315 82.200 0.822 12.086 1200 1.131 3.77 0.300 14.800 0.2 0.247 1.707 1.930 7

5 Pipe Culvert 3.710 70.400 0.704 10.760 1200 1.131 3.77 0.300 12.300 0.2 0.206 1.734 1.961 6

6 Pipe Culvert 4.240 45.500 0.455 7.756 1200 1.131 3.77 0.300 10.330 0.22 0.173 1.842 2.083 4

7 Pipe Culvert 4.497 13.800 0.138 3.170 900 0.636 2.83 0.225 11.250 0.2 0.265 1.695 1.079 3

8 Pipe Culvert 4.698 24.400 0.244 4.860 1200 1.131 3.77 0.300 15.000 0.2 0.251 1.705 1.928 3

9 Pipe Culvert 4.885 6.700 0.067 1.844 900 0.636 2.83 0.225 15.000 0.2 0.354 1.643 1.045 2

10 Pipe Culvert 5.020 8.600 0.086 2.223 900 0.636 2.83 0.225 12.000 0.2 0.283 1.685 1.072 3

11 Pipe Culvert 5.320 17.400 0.174 3.772 1200 1.131 3.77 0.300 12.000 0.2 0.201 1.737 1.965 2

12 Pipe Culvert 5.711 25.300 0.253 4.994 1200 1.131 3.77 0.300 11.600 0.2 0.194 1.742 1.970 3

13 Box Culvert 6.070 47.600 0.476 8.023 1200 1.131 3.77 0.300 15.000 0.2 0.251 1.705 1.928 5

14 Box Culvert 6.325 26.800 0.268 5.215 1200 1.131 3.77 0.300 15.000 0.2 0.251 1.705 1.928 3

15 Pipe Culvert 6.590 18.800 0.188 3.997 1200 1.131 3.77 0.300 12.000 0.2 0.201 1.737 1.965 3

16 Box Culvert 6.815 11.100 0.111 2.692 900 0.636 2.83 0.225 15.000 0.2 0.354 1.643 1.045 3

17 Pipe Culvert 7.280 11.300 0.113 2.729 900 0.636 2.83 0.225 10.500 0.2 0.248 1.707 1.086 3

18 Pipe Culvert 7.500 10.300 0.103 2.545 900 0.636 2.83 0.225 14.100 0.2 0.333 1.655 1.053 3

19 Pipe Culvert 7.750 14.600 0.146 3.307 1200 1.131 3.77 0.300 13.600 0.2 0.227 1.720 1.945 2

20 Pipe Culvert 7.955 8.400 0.084 2.184 900 0.636 2.83 0.225 17.300 0.2 0.408 1.613 1.026 3

21 Pipe Culvert 8.032 7.800 0.078 2.066 900 0.636 2.83 0.225 16.000 0.2 0.378 1.630 1.037 2

22 Pipe Culvert 8.670 22.900 0.229 4.635 1200 1.131 3.77 0.300 18.200 0.2 0.304 1.672 1.891 3

23 Pipe Culvert 8.930 11.900 0.119 2.837 900 0.636 2.83 0.225 11.900 0.2 0.281 1.686 1.073 3

24 Pipe Culvert 9.100 4.500 0.045 1.368 900 0.636 2.83 0.225 14.100 0.2 0.333 1.655 1.053 2
25 Pipe Culvert 9.372 3.300 0.033 1.084 900 0.636 2.83 0.225 14.200 0.2 0.335 1.654 1.052 2
Detailed hydraulic calculations of culvert at km 4.497

Catchment Area M= 0.138 Sq. km


Discharge Q= C M ^(3/4) cumecs as per IRC:SP:13 C = 14
3.17 cumecs
Dia pf Pipe d= 900 mm
C/S Area A= 0.64 sq.m
Wetted Perimeter P= 2.83 m
Hydraulic mean Radious R = A/P = 0.23
Total Length of Pipe L= 11.25 m

Culvert is designed as pipe flowing full


Head on the upstream above the pipe H = 0.2 m
Entry loss coefficient Ke = 0.1 as per table 5 of IRC:SP:13
Friction loss coefficient Kf = 0.00394 x L/R^1.2 as per table 5 of IRC:SP:13
= 0.265

Velocity V= 4.43 x H/(1+Ke+Kf)


1.6954159 m/sec

Discharge per row of pipe q = AV = 1.079 cum

No. of Rows required = = Q/q = 2.94 Say 3 nos


Detailed hydraulic calculations of culvert at km 4.885

Catchment Area M= 0.067 Sq. km


Discharge Q= C M ^(3/4) cumecs as per IRC:SP:13 C = 14
1.84 cumecs
Dia pf Pipe d= 900 mm
C/S Area A= 0.64 sq.m
Wetted Perimeter P= 2.83 m
Hydraulic mean Radious R = A/P = 0.23
Total Length of Pipe L= 15.00 m

Culvert is designed as pipe flowing full


Head on the upstream above the pipe H = 0.2 m
Entry loss coefficient Ke = 0.1 as per table 5 of IRC:SP:13
Friction loss coefficient Kf = 0.00394 x L/R^1.2 as per table 5 of IRC:SP:13
= 0.354

Velocity V= 4.43 x H/(1+Ke+Kf)


1.6430121 m/sec

Discharge per row of pipe q = AV = 1.045 cum

No. of Rows required = = Q/q = 1.76 Say 2 nos