Lenght of Anchorage and Lap Splices

Concrete fc' 2

Anchorages Anchorages
Grade of Length in Length in
Bar Bar size Tension Tension (Top
(General) Reinf)

(S1) (S2)

BJTD-50 ( fc'= 25 )
2510 10 360 470
2513 13 470 610
2516 16 580 750
2519 19 690 890
BJTD-50
2522 22 990 1290
2525 25 1130 1470
2529 29 1310 1700
2532 32 1440 1880

BJTD-50 ( fc'= 35 )
3510 10 310 400
3513 13 400 520
3516 16 490 640
3519 19 580 760
BJTD-50
3522 22 840 1090
3525 25 960 1240
BJTD-50
(S1) (S2)
3529 29 1110 1440
3532 32 1220 1590

BJTD-50 ( fc'= 40 ) for Kolom 41 - Roof Flo


4010 10 310 400
4013 13 400 520
4016 16 490 640
4019 BJTD-50 19 580 760
4022 41 - Roof 22 840 1090
4025 25 960 1240
4029 29 1110 1440
4032 32 1220 1590

BJTD-50 ( fc'= 45 ) for Kolom 21 - 40 Flo


4510 10 300 400
4513 13 390 520
4516 16 480 640
4519 BJTD-50 19 570 760
4522 21 - 40 22 740 960
4525 25 840 1100
4529 29 980 1270
4532 32 1080 1400

BJTD-50 ( fc'= 50 ) for Kolom B1 - 20 Flo


5010 10 300 400
5013 13 390 520
5016 16 480 640
BJTD-50
B1 - 20
(S1) (S2)
5019 BJTD-50 19 570 760
5022 B1 - 20 22 740 960
5025 25 840 1100
5029 29 980 1270
5032 32 1080 1400

BJTD-50 ( fc'= 40 ) HILTI


HILTI10 10 125
HILTI13 13 163
HILTI16 16 200
HILTI19 19 240
BJTD-50
HILTI22 22 275
HILTI25 25 314
HILTI29 29 420
HILTI32 32 495
Concrete fc' 25MPa

Anchorages Lap Splice Lap Splice


Length Length in Length in
Compression Compression Tension
(Top Reinf)

(S3) (S4) (S5)

fc'= 25 )
250 410 470
325 533 610
400 656 750
475 779 890
550 902 1290
625 1025 1470
725 1189 1700
800 1312 1880

fc'= 35 )
220 410 400
286 533 520
352 656 640
418 779 760
484 902 1090
550 1025 1240
(S3) (S4) (S5)
638 1189 1440
704 1312 1590

Kolom 41 - Roof Floor


220 410 400
286 533 520
352 656 640
418 779 760
484 902 1090
550 1025 1240
638 1189 1440
704 1312 1590

Kolom 21 - 40 Floor
200 410 400
260 533 520
320 656 640
380 779 760
440 902 960
500 1025 1100
580 1189 1270
640 1312 1400

Kolom B1 - 20 Floor
200 410 400
260 533 520
320 656 640
(S3) (S4) (S5)
380 779 760
440 902 960
500 1025 1100
580 1189 1270
640 1312 1400

'= 40 ) HILTI
PROJECT : TUNJUNGAN PLAZA 6
WORK : COLUMN (CONDO)
BASED ON DRAWING : SECTION-B PLAN
DRAWING NUMBER : BA-2002-B
ISSUED : R1 FOR CONSTRUCTION (30/01/15)
TRANSMITTAL : 18/ARS-TP6/03/2015

TP6 Condo Finish Floor : 0.05


Elevation Height Elevation Height
Floor fc' Floor fc'
FFL SFL Floor to Floor FFL SFL Floor to Floor

LG 10.500 10.500 25 35 139.000 138.950 25


3.75 3.30
UG 14.300 14.250 25 36 142.300 142.250 25
3.20 3.30
1 17.500 17.450 25 37 145.600 145.550 25
5.45 3.30
2 22.950 22.900 25 38 148.900 148.850 25
4.50 3.30
3 27.450 27.400 25 39 152.200 152.150 25
4.50 3.30
4 31.950 31.900 25 40 155.500 155.450 25
4.50 3.30
5 36.450 36.400 25 41 158.800 158.750 25
5.05 3.30
6 41.500 41.450 25 42 162.100 162.050 25
3.10 3.30
7 44.600 44.550 25 43 165.400 165.350 25
3.10 3.30
8 47.700 47.650 25 44 168.700 168.650 25
3.10 3.30
9 50.800 50.750 25 45 172.000 171.950 25
3.10 3.30
10 53.900 53.850 25 46 175.300 175.250 25
3.10 3.30
11 57.000 56.950 25 47 178.600 178.550 25
3.10 3.30
12 60.100 60.050 25 48 181.900 181.850 25
3.10 3.30
13 63.200 63.150 25 49 185.200 185.150 25
5.00 3.30
14 68.200 68.150 25 50 188.500 188.450 25
4.80 3.30
15 73.000 72.950 25 51 191.800 191.750 25
3.30 3.30
16 76.300 76.250 25 52 195.100 195.050 25
3.30 6.10
17 79.600 79.550 25 LR 201.200 201.150 25
3.30 5.40
18 82.900 82.850 25 R 206.600 206.550 25
3.30 0.00
19 86.200 86.150 25 UR 206.600 206.550 25
3.30
20 89.500 89.450 25
3.30
21 92.800 92.750 25
3.30
22 96.100 96.050 25
3.30
23 99.400 99.350 25
3.30
24 102.700 102.650 25
3.30
25 106.000 105.950 25
3.30
26 109.300 109.250 25
3.30
27 112.600 112.550 25
3.30
28 115.900 115.850 25
3.30
29 119.200 119.150 25
3.30
30 122.500 122.450 25
3.30
31 125.800 125.750 25
3.30
32 129.100 129.050 25
3.30
33 132.400 132.350 25
3.30
34 135.700 135.650 25
3.30
35 139.000 138.950 25
3.30
List of Column Strengthening Sheraton Work
LG FLOOR
No. COLUMN UG FLOOR 1st FLOOR 2nd FLOOR
Status

1 C45 Perkuatan Perkuatan Baru Baru


2 C44 Perkuatan Perkuatan Baru Baru
3 C43 Perkuatan Perkuatan Existing Exisitng
4 C58 Perkuatan Perkuatan Baru Baru
5 C57 Perkuatan Perkuatan Baru Baru
6 C56 Perkuatan Perkuatan Baru Baru
7 C55 Perkuatan Perkuatan Baru Baru
8 C54 Perkuatan Perkuatan Existing Exisitng
9 C95 Perkuatan Perkuatan Baru Baru SC-TP3-01
10 KE1 Perkuatan Bobok + Cor Baru - -
11 KE2 Perkuatan Perkuatan - -
12 KE3 Perkuatan Perkuatan - -
13 KE4 Perkuatan Bobok + Cor Baru - -
14 KT1 - - Baru Baru
15 KT2 - - Baru Baru
16 KT3 - - Baru Baru
17 KT4 - - Baru Baru
18 KT5 - - Baru Baru
19 C94 Perkuatan Perkuatan - -
20 C76 Perkuatan Perkuatan - -
21 C98 Perkuatan Bobok + Cor Baru - -
22 C97 Perkuatan Perkuatan - - SC-TP3-02
23 KT6 Baru Baru Baru Baru
24 KT7 Baru Baru Baru Baru
25 KT8 - - Baru Baru
26 KT9 - - Baru Baru
27 KT10 - - Baru Baru
28 KE5 Perkuatan Perkuatan Baru Baru
29 KE6 Perkuatan Perkuatan Baru Baru Dauz:
Drop Panel
30 KE7 Perkuatan Perkuatan Baru Baru
31 KE8 Perkuatan Perkuatan Baru Baru
32 KE9 Perkuatan Perkuatan Bobok + Cor Baru +DP Baru SC-TP3-03
33 KE10 Perkuatan Perkuatan Perkuatan + DP Baru
Dauz:
34 KE11 Perkuatan Perkuatan Bobok + Cor Baru Baru Drop Panel
35 KE12 Perkuatan Perkuatan Bobok + Cor Baru Baru
36 KE13 Perkuatan Bobok + Cor Baru - -
37 KE14 Perkuatan Perkuatan - -
38 KE15 Perkuatan Perkuatan - -
39 KE16 Perkuatan Perkuatan - -
40 KE17 Perkuatan Perkuatan - -
41 KE18 Perkuatan Perkuatan - - SC-TP3-04
42 KE19 Perkuatan Perkuatan - -
43 KE20 Perkuatan Perkuatan - -
44 KE21 Perkuatan Perkuatan - -
45 KT11 - - Bobok + Cor Baru Baru
46 KT12 - - Bobok + Cor Baru Baru
47 KT13 - - Bobok + Cor Baru Baru
48 KT23 - - Bobok + Cor Baru Baru
49 KT24 - - Bobok + Cor Baru Baru
50 KT25 - - Bobok + Cor Baru Baru
List of Column Strengthening Sheraton Work
LG FLOOR
No. COLUMN UG FLOOR 1st FLOOR 2nd FLOOR
Status

51 KT14 - - Bobok + Cor Baru Baru


52 KT15 - - Bobok + Cor Baru Baru
53 KT17 - - Bobok + Cor Baru Baru
54 KT18 - - Bobok + Cor Baru Baru
55 KT19 - - Bobok + Cor Baru Baru
56 KT20 - - Bobok + Cor Baru Baru
57 KT21 - - Bobok + Cor Baru Baru
58 KT22 - - Bobok + Cor Baru Baru
59 KE22 Hold Hold Perkuatan Perkuatan
60 C32 - - Existing Perkuatan (Lt.2A)
61 C33 - - Existing Perkuatan (Lt.2A)
62 C34 - - Existing Perkuatan (Lt.2A)
63 C22 - Existing Perkuatan Perkuatan SC-TP3-05
64 K1 Baru Baru - -
65 K2 Baru Baru - -
66 K3 Baru Baru - -
67 K4 Baru Baru - -
68 K5 Baru Baru - -
69 K6 Baru Baru - -
70 K7 Baru Baru - - SM-M-03
71 K8 Baru Baru Baru Baru
72 K9 Baru Baru Baru Baru
73 K10 Baru Baru Baru Baru
74 K11 Baru Baru Baru Baru
75 K12 Baru Baru Baru Baru
76 K13 Baru Baru Baru Baru
77 K14 - - Baru Baru
78 K15 - - Baru Baru
79 K16 - - Baru Baru
80 C(1) Baru Baru Baru Baru SM-M-03A
81 KA(1) - - Baru Baru
82 KA(2) Perkuatan Perkuatan Baru Baru
83 KB(1) Bobok + Cor Baru Bobok + Cor Baru - -
84 KB(2) Perkuatan Perkuatan - -
85 KB(3) Perkuatan Perkuatan - -
86 KB(4) Perkuatan Perkuatan - -
87 KB(5) Perkuatan Perkuatan Existing Exisitng
88 KC(5)/C37 Perkuatan Perkuatan Existing Exisitng SM-M-03B
89 KC(1)
90 KC(2)
91 KC(3)
92 KC(4)
93 KC(6)
94 C77
95 C78
List of Column Strengthening Sheraton Work

No. COLUMN LG FLOOR UG FLOOR 1st FLOOR 2nd FLOOR

ZONE 1
1 C45 Perkuatan Perkuatan Baru Baru
2 C44 Perkuatan Perkuatan Baru Baru
3 C43 Perkuatan Perkuatan Existing Exisitng
4 C58 Perkuatan Perkuatan Baru Baru
5 C57 Perkuatan Perkuatan Baru Baru
6 C56 Perkuatan Perkuatan Baru Baru
7 C95 Perkuatan Perkuatan Baru Baru
8 C98 Perkuatan Bobok + Cor Baru - -
9 KE5 Perkuatan Perkuatan Baru Baru
10 KE6 Perkuatan Perkuatan Baru Baru
11 KE7 Perkuatan Perkuatan Baru Baru
12 KE8 Perkuatan Perkuatan Baru Baru
13 KE9 Perkuatan Perkuatan Bobok + Cor Baru +DP Baru
14 KE10 Perkuatan Perkuatan Perkuatan + DP Baru
15 KE11 Perkuatan Perkuatan Bobok + Cor Baru Baru
16 KE13 Perkuatan Bobok + Cor Baru - -
17 KT4 - - Baru Baru
18 KT5 - - Baru Baru
19 KT11 - - Bobok + Cor Baru Baru
20 KT13 - - Bobok + Cor Baru Baru

ZONE 1A
1 KE22 Exisiting Exisiting Perkuatan Perkuatan
2 C32 - - Existing Perkuatan (Lt.2A)
3 C33 - - Existing Perkuatan (Lt.2A)
4 C34 - - Existing Perkuatan (Lt.2A)
5 C22 - Existing Perkuatan Perkuatan

ZONE 2
1 C55 Perkuatan Perkuatan Baru Baru
2 C54 Perkuatan Perkuatan Existing Exisitng
3 C94 Perkuatan Perkuatan - -
4 C76 Perkuatan Perkuatan - -
5 C97 Perkuatan Perkuatan - -
6 C77 Perkuatan Perkuatan Perkuatan Perkuatan
7 C78 Perkuatan Perkuatan Perkuatan Perkuatan
8 KT1 - - Baru Baru
9 KT2 - - Baru Baru
10 KT3 - - Baru Baru
List of Column Strengthening Sheraton Work

No. COLUMN LG FLOOR UG FLOOR 1st FLOOR 2nd FLOOR

ZONE 3
1 KE1 Perkuatan Bobok + Cor Baru - -
2 KE2 Perkuatan Perkuatan - -
3 KE3 Perkuatan Perkuatan - -
4 KE4 Perkuatan Bobok + Cor Baru - -
5 KT6 Baru Baru Baru Baru
6 KT7 Baru Baru Baru Baru
7 KE12 Perkuatan Perkuatan Bobok + Cor Baru Baru
8 KE14 Perkuatan Perkuatan - -
9 KE15 Perkuatan Perkuatan - -
10 KE16 Perkuatan Perkuatan - -
11 KE17 Perkuatan Perkuatan - -
12 KE18 Perkuatan Perkuatan - -
13 KE19 Perkuatan Perkuatan - -
14 KE20 Perkuatan Perkuatan - -
15 KE21 Perkuatan Perkuatan - -
16 KT8 - - Baru Baru
17 KT9 - - Baru Baru
18 KT10 - - Baru Baru
19 KT12 - - Bobok + Cor Baru Baru
20 KT23 - - Bobok + Cor Baru Baru
21 KT24 - - Bobok + Cor Baru Baru
22 KT25 - - Bobok + Cor Baru Baru
23 KT14 - - Bobok + Cor Baru Baru
24 KT15 - - Bobok + Cor Baru Baru
25 KT17 - - Bobok + Cor Baru Baru
26 KT18 - - Bobok + Cor Baru Baru
27 KT19 - - Bobok + Cor Baru Baru
28 KT20 - - Bobok + Cor Baru Baru
29 KT21 - - Bobok + Cor Baru Baru
30 KT22 - - Bobok + Cor Baru Baru

ZONE 4
1 KA(2) Perkuatan Perkuatan Baru Baru
2 KB(1) Bobok + Cor Baru Bobok + Cor Baru - -
3 KB(2) Perkuatan Perkuatan - -
4 KB(3) Perkuatan Perkuatan - -
5 KB(4) Perkuatan Perkuatan - -
6 KB(5) Perkuatan Perkuatan Existing Exisitng
7 KC(5)/C37 Perkuatan Perkuatan Existing Exisitng
8 K11 Baru Baru Baru Baru
9 K12 Baru Baru Baru Baru
10 K13 Baru Baru Baru Baru
11 K14 - - Baru Baru
12 K15 - - Baru Baru
13 K16 - - Baru Baru
14 C(1) Baru Baru Baru Baru
15 KA(1) - - Baru Baru
List of Column Strengthening Sheraton Work
LG FLOOR
No. COLUMN UG FLOOR 1st FLOOR 2nd FLOOR
Status

1 C45 Perkuatan Perkuatan Baru Baru


2 C44 Perkuatan Perkuatan Baru Baru
3 C43 Perkuatan Perkuatan Existing Exisitng
4 C58 Perkuatan Perkuatan Baru Baru
5 C57 Perkuatan Perkuatan Baru Baru
6 C56 Perkuatan Perkuatan Baru Baru
7 C55 Perkuatan Perkuatan Baru Baru
8 C54 Perkuatan Perkuatan Existing Exisitng
9 C95 Perkuatan Perkuatan Baru Baru SC-TP3-01
10 KE1 Perkuatan Bobok + Cor Baru - -
11 KE2 Perkuatan Perkuatan - -
12 KE3 Perkuatan Perkuatan - -
13 KE4 Perkuatan Bobok + Cor Baru - -
14 KT1 - - Baru Baru
15 KT2 - - Baru Baru
16 KT3 - - Baru Baru
17 KT4 - - Baru Baru
18 KT5 - - Baru Baru
19 C94 Perkuatan Perkuatan - -
20 C76 Perkuatan Perkuatan - -
21 C98 Perkuatan Bobok + Cor Baru - -
22 C97 Perkuatan Perkuatan - - SC-TP3-02
23 KT6 Baru Baru Baru Baru
24 KT7 Baru Baru Baru Baru
25 KT8 - - Baru Baru
26 KT9 - - Baru Baru
27 KT10 - - Baru Baru
28 KE5 Perkuatan Perkuatan Baru Baru
29 KE6 Perkuatan Perkuatan Baru Baru Dauz:
Drop Panel
30 KE7 Perkuatan Perkuatan Baru Baru
31 KE8 Perkuatan Perkuatan Baru Baru
32 KE9 Perkuatan Perkuatan Bobok + Cor Baru +DP Baru SC-TP3-03
33 KE10 Perkuatan Perkuatan Perkuatan + DP Baru
Dauz:
34 KE11 Perkuatan Perkuatan Bobok + Cor Baru Baru Drop Panel
35 KE12 Perkuatan Perkuatan Bobok + Cor Baru Baru
36 KE13 Perkuatan Bobok + Cor Baru - -
37 KE14 Perkuatan Perkuatan - -
38 KE15 Perkuatan Perkuatan - -
39 KE16 Perkuatan Perkuatan - -
40 KE17 Perkuatan Perkuatan - -
41 KE18 Perkuatan Perkuatan - - SC-TP3-04
42 KE19 Perkuatan Perkuatan - -
43 KE20 Perkuatan Perkuatan - -
44 KE21 Perkuatan Perkuatan - -
45 KT11 - - Bobok + Cor Baru Baru
46 KT12 - - Bobok + Cor Baru Baru
47 KT13 - - Bobok + Cor Baru Baru
48 KT23 - - Bobok + Cor Baru Baru
49 KT24 - - Bobok + Cor Baru Baru
50 KT25 - - Bobok + Cor Baru Baru
List of Column Strengthening Sheraton Work
LG FLOOR
No. COLUMN UG FLOOR 1st FLOOR 2nd FLOOR
Status

51 KT14 - - Bobok + Cor Baru Baru


52 KT15 - - Bobok + Cor Baru Baru
53 KT17 - - Bobok + Cor Baru Baru
54 KT18 - - Bobok + Cor Baru Baru
55 KT19 - - Bobok + Cor Baru Baru
56 KT20 - - Bobok + Cor Baru Baru
57 KT21 - - Bobok + Cor Baru Baru
58 KT22 - - Bobok + Cor Baru Baru
59 KE22 Hold Hold Perkuatan Perkuatan
60 C32 - - Existing Perkuatan (Lt.2A)
61 C33 - - Existing Perkuatan (Lt.2A)
62 C34 - - Existing Perkuatan (Lt.2A)
63 C22 - Existing Perkuatan Perkuatan SC-TP3-05
64 K1 Baru Baru - -
65 K2 Baru Baru - -
66 K3 Baru Baru - -
67 K4 Baru Baru - -
68 K5 Baru Baru - -
69 K6 Baru Baru - -
70 K7 Baru Baru - - SM-M-03
71 K8 Baru Baru Baru Baru
72 K9 Baru Baru Baru Baru
73 K10 Baru Baru Baru Baru
74 K11 Baru Baru Baru Baru
75 K12 Baru Baru Baru Baru
76 K13 Baru Baru Baru Baru
77 K14 - - Baru Baru
78 K15 - - Baru Baru
79 K16 - - Baru Baru
80 C(1) Baru Baru Baru Baru SM-M-03A
81 KA(1) - - Baru Baru
82 KA(2) Perkuatan Perkuatan Baru Baru
83 KB(1) Bobok + Cor Baru Bobok + Cor Baru - -
84 KB(2) Perkuatan Perkuatan - -
85 KB(3) Perkuatan Perkuatan - -
86 KB(4) Perkuatan Perkuatan - -
87 KB(5) Perkuatan Perkuatan Existing Exisitng
88 KC(5)/C37 Perkuatan Perkuatan Existing Exisitng SM-M-03B
89 KC(1)
90 KC(2)
91 KC(3)
92 KC(4)
93 KC(6)
94 C77
95 C78
PROJECT : TUNJUNGAN PLAZA 6 LINK TO TP-3
WORK : COLUMN STRENGTHENING SHERATON
BASED ON DRAWING :
DRAWING NUMBER :
ISSUED :
TRANSMITTAL : 103/STR-TP6/05/2015

Recapitulation of Column Strengthening Sheraton Work -


1 2 3 4 5 6 8 9 10 57 58 59 60 61 62 63 64 65 69 70 71 72 73 74 75
Demolish Cut of Concrete Formwork TOTAL Rebar of Kolom (Kg) CHEMICALL HILTI
No. COLUMN Chipping
Slab Beam Column B.Wall C.Guard Fc'40 Kotak Bulat REBAR 10 13 16 19 22 25 29 32 10 13 16 19 22 25 29
[m3] [m3] [m3] [m2] [m2] [nos] [m3] [m2] [m2] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [titik] [titik] [titik] [titik] [titik] [titik] [titik]

1 TP3 C45 LG 0.05 - - - 7.50 4 1.51 12.00 - 569.14 - 193.49 - - 375.66 - - - - 123 - - 36 - -
2 TP3 C44 LG 0.05 - - - 7.50 4 1.51 12.00 - 603.52 - 196.55 - - 406.96 - - - - 123 - - 39 - -
3 TP3 C43 LG 0.07 - - - 7.50 4 2.17 13.50 - 538.65 - 225.60 - - 313.05 - - - - 182 - - 30 - -
4 TP3 C58 LG 0.03 - - - 1.88 4 0.97 11.25 - 294.65 21.20 85.62 - - 187.83 - - - - 94 - - 18 - -
5 TP3 C57 LG 0.05 - - - 5.63 4 1.47 12.00 - 602.16 - 226.50 - - 375.66 - - - - 153 - - 36 - -
6 TP3 C56 LG 0.07 - - - 5.63 4 2.17 13.50 - 726.98 91.41 197.30 - - 438.27 - - - - 177 - - 42 - -
7 TP3 C55 LG 0.08 - - - 7.50 4 2.52 14.25 - 738.77 - 300.50 - - 438.27 - - - - 214 - - 42 - -
8 TP3 C54 LG 0.08 - - - 7.50 4 2.52 14.25 - 738.77 - 300.50 - - 438.27 - - - - 214 - - 42 - -
9 TP3 C95 LG 0.06 - - - 7.50 4 1.82 12.75 - 735.48 - 297.21 - - 438.27 - - - - 177 - - 42 - -
10 TP3 KE1 LG 0.07 - - - 7.50 4 2.17 13.50 - 933.16 46.18 214.19 - - - 672.80 - - - 214 - - - 48 -
11 TP3 KE2 LG 0.07 - - - 7.50 4 2.17 13.50 - 933.16 46.18 214.19 - - - 672.80 - - - 214 - - - 48 -
12 TP3 KE3 LG 0.05 - - - 5.63 4 1.47 12.00 - 747.22 63.85 178.78 - - - 504.60 - - - 161 - - - 36 -
13 TP3 KE4 LG 0.05 - - - 7.50 4 1.47 12.00 - 783.51 100.13 178.78 - - - 504.60 - - - 161 - - - 36 -
19 TP3 C94 LG 0.10 - - - 7.50 4 2.91 15.00 - 1,003.63 100.84 230.00 - - - 672.80 - - - 214 - - - 48 -
20 TP3 C76 LG 0.10 - - - 7.50 4 2.91 15.00 - 1,003.63 100.84 230.00 - - - 672.80 - - - 214 - - - 48 -
21 TP3 C98 LG 0.05 - - - 7.50 4 1.51 12.00 - 542.00 40.99 164.61 - - - 336.40 - - - 139 - - - 24 -
22 TP3 C97 LG 0.05 - - - 7.50 4 1.51 12.00 - 706.73 - 268.46 - - 438.27 - - - - 139 - - 42 - -
23 TP3 KT6 LG 0.03 - - - - 0 0.77 - 5.89 263.28 - 75.45 - - 187.83 - - - - - - - 18 - -
24 TP3 KT7 LG 0.03 - - - - 0 0.77 - 5.89 263.28 - 75.45 - - 187.83 - - - - - - - 18 - -
28 TP3 KE5 LG 0.03 - - - 1.88 4 0.97 11.25 - 326.68 26.86 112.00 - - 187.83 - - - - 102 - - 18 - -
29 TP3 KE6 LG 0.05 - - - 5.63 4 1.47 12.00 - 657.06 - 281.40 - - 375.66 - - - - 177 - - 36 - -
30 TP3 KE7 LG 0.05 - - - 5.63 4 1.47 12.00 - 616.29 59.14 181.49 - - 375.66 - - - - 177 - - 36 - -
31 TP3 KE8 LG 0.06 - - - 5.63 4 1.82 12.75 - 735.48 - 297.21 - - 438.27 - - - - 177 - - 42 - -
32 TP3 KE9 LG 0.05 - - - 7.50 4 1.51 12.00 - 618.67 - 243.01 - - 375.66 - - - - 139 - - 36 - -
33 TP3 KE10 LG 0.05 - - - 7.50 4 1.51 12.00 - 618.67 - 243.01 - - 375.66 - - - - 139 - - 36 - -
34 TP3 KE11 LG 0.06 - - - 7.50 4 1.82 12.75 - 706.07 - 267.80 - - 438.27 - - - - 177 - - 42 - -
35 TP3 KE12 LG 0.08 - - - 7.50 4 2.44 14.25 - 821.35 - 320.47 - - 500.88 - - - - 139 - - 48 - -
36 TP3 KE13 LG 0.07 - - - 5.63 4 2.17 13.50 - 821.16 - 351.59 - - 469.57 - - - - 177 - - 45 - -
37 TP3 KE14 LG 0.08 - - - 5.63 4 2.38 14.25 - 792.78 86.70 205.21 - - 500.88 - - - - 177 - - 48 - -
38 TP3 KE15 LG 0.07 - - - 5.63 4 1.94 13.13 - 664.16 63.85 193.35 - - 406.96 - - - - 177 - - 39 - -
39 TP3 KE16 LG 0.08 - - - 7.50 4 2.52 14.25 - 824.52 - 307.98 - - 516.53 - - - - 139 - - 50 - -
40 TP3 KE17 LG 0.07 - - - 5.63 4 2.23 13.88 - 705.73 66.20 201.25 - - 438.27 - - - - 177 - - 42 - -
41 TP3 KE18 LG 0.10 - - - 7.50 4 2.87 15.00 - 867.68 - 319.84 - - 547.84 - - - - 139 - - 53 - -
42 TP3 KE19 LG 0.07 - - - 5.63 4 2.23 13.88 - 756.35 85.52 201.25 - - 469.57 - - - - 177 - - 45 - -
43 TP3 KE20 LG 0.10 - - - 7.50 4 2.91 15.00 - 840.32 - 323.79 - - 516.53 - - - - 139 - - 50 - -
44 TP3 KE21 LG 0.05 - - - 5.63 4 1.47 12.00 - 634.43 77.28 181.49 - - 375.66 - - - - 177 - - 36 - -
60 TP3 C32 LG 0.02 - - - - 2 0.53 3.74 - 151.91 - 64.26 - - 87.66 - - - - 58 - - 9 - -
94 TP3 C77 LG 0.07 - - - 7.50 4 2.17 13.50 - 647.13 - 271.47 - - 375.66 - - - - 139 - - 36 - -
95 TP3 C78 LG 0.07 - - - 7.50 4 2.17 13.50 - 647.13 - 271.47 - - 375.66 - - - - 139 - - 36 - -

11,581.34 34,332.88 - 259.75 69,773.84 13,301.66 - - 2,901 18,298 - 156 5,722 1,054 -
Total : 13.50 - 9.94 - 605.42 371 413.74 2,218.18 522.51 129,249.46
129,249.46 kg 28,131

Surabaya, 2 July 2015


Checked and approved by : Submitted by :
PT. Pakuwon Jati Tbk PT. Rider Levett Bucknall PT. PP (Persero) Tbk

( M. Zuhel ) ( Benyamin Yuniarto ) ( Ir. Tanto Barnowo )


QSM Sr. Quantity Surveyor QSM
76
CHEMICALL HILTI
32
[titik]

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
[titik]
Demolish Cut of
Chipping
PROYEK TP3 Link to TP6 Slab Beam Column B.Wall C.Guard
[m3] [m3] [m3] [m2] [m2] [nos]
LG Floor
UG Floor
1st Floor
2nd Floor
Concrete Formwork TOTAL Rebar of Kolom (Kg)
Fc'40 Kotak Bulat REBAR 10 13 16 19 22 25
[m3] [m2] [m2] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg]
CHEMICALL HILTI
29 32 10 13 16 19 22
[Kg] [Kg] [titik] [titik] [titik] [titik] [titik]
ALL HILTI
25 29 32
[titik] [titik] [titik]
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C45 TRANSMITTAL : 103/STR-TP6/05/2015
C45

Concrete Cover = 0.04 fc' = 40 0.23 - - - 13.90 8.00 483 7.81 50.10 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C45 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 159 1.51 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG C45 0 KOTAK 0.80 0.80 0.50 0.50 14.25 17.45 3.20 0.05 6.40 4 136 1.30 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 C45 0 KOTAK 0.70 0.70 17.45 22.90 5.45 0.06 - 88 2.73 15.26 - 24 D22 24 22 24 0.28 1.09 6.54 2.98 487.41
1 EXTRA 0
2 C45 0 KOTAK 0.70 0.70 22.90 27.40 4.50 0.06 - 100 2.27 12.60 - 24 D22 24 22 36 0.28 1.09 5.59 2.98 429.30
2 EXTRA 0

0.23 - - - 13.90 8.00 483 7.81 50.10 -

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 22 23
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C45 TRANSMITTAL : 103/STR-TP6/05/2015
C45

2,286.36
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Siku Chem Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Qty Length Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 11 8 1.50 100 19 64 0.16 3.04 - - 1.04 118.09 D13/100/100 13 100 11 100 19 0.50 4 1.04 61.90 13 200 4 0.22 0.16 59 1.04 13.50
LG
UG D13/100/100 13 100 8 8 1.50 100 16 64 0.16 3.04 - - 1.04 99.14 D13/100/100 13 100 8 100 16 0.50 4 1.04 49.52 13 200 4 0.22 0.16 48 1.04 10.98
UG
1 D10/100/150 10 100 20 150 28 64 0.13 2.63 - - 0.62 83.23 D10/100/150 10 100 20 150 28 0.77 2 0.77 2 0.62 91.66
1
2 D10/100/150 10 100 15 150 23 64 0.13 2.63 - - 0.62 66.92 D10/100/150 10 100 15 150 23 0.77 2 0.77 2 0.62 72.56
2

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C45 TRANSMITTAL : 103/STR-TP6/05/2015
C45

314.38 353.13 - - 1,618.86 - - - TOTAL 10,035.11 219.01 128 235 - - 120 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 193.49 - - 375.66 - - - - 123 - - 36 - - -


569.14 11,225.73 236.69 159

- 159.64 - - 326.49 - - - - 112 - - 24 - - -


486.13 9,588.42 201.97 136

174.89 - - - 487.41 - - - 64 - - - 24 - - -
662.30 10,397.15 239.56 88

139.49 - - - 429.30 - - - 64 - - - 36 - - -
568.79 8,929.14 197.80 100

314.38 353.13 - - 1,618.86 - - - 2,286.36 10,035.11 219.01 128 235 - - 120 - - - 483

58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C44 TRANSMITTAL : 103/STR-TP6/05/2015
C44

Concrete Cover = 0.04 fc' = 40 0.20 - - - 13.90 8.00 478 6.49 46.12 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C44 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 162 1.51 12.00 - 26 D22 26 22 39 0.28 1.09 4.84 2.98 406.96
LG EXTRA 0
UG C44 0 KOTAK 0.80 0.80 0.50 0.50 14.25 17.45 3.20 0.05 6.40 4 138 1.30 10.24 - 26 D22 26 22 26 0.28 1.09 4.29 2.98 353.70
UG EXTRA 0
1 C44 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 84 2.01 13.08 - 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 C44 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 94 1.67 10.80 - 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.20 - - - 13.90 8.00 478 6.49 46.12 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C44 TRANSMITTAL : 103/STR-TP6/05/2015
C44

2,203.71
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Siku Chem Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Qty Length Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 11 8 1.50 100 19 64 0.16 3.04 - - 1.04 118.09 D13/100/100 13 100 11 100 19 0.50 4 1.04 61.90 13 200 4 0.27 0.16 59 1.04 16.57
LG
UG D13/100/100 13 100 8 8 1.50 100 16 64 0.16 3.04 - - 1.04 99.14 D13/100/100 13 100 8 100 16 0.50 4 1.04 49.52 13 200 4 0.27 0.16 48 1.04 13.48
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C44 TRANSMITTAL : 103/STR-TP6/05/2015
C44

320.43 358.69 - - 1,524.58 - - - TOTAL 11,311.97 237.23 128 235 - - 115 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 196.55 - - 406.96 - - - - 123 - - 39 - - -


603.52 11,903.70 236.69 162

- 162.14 - - 353.70 - - - - 112 - - 26 - - -


515.84 10,174.29 201.97 138

175.44 - - - 406.17 - - - 64 - - - 20 - - -
581.61 12,427.55 279.49 84

144.99 - - - 357.75 - - - 64 - - - 30 - - -
502.74 10,742.35 230.77 94

320.43 358.69 - - 1,524.58 - - - 2,203.71 11,311.97 237.23 128 235 - - 115 - - - 478
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C43 TRANSMITTAL : 103/STR-TP6/05/2015
C43

Concrete Cover = 0.04 fc' = 40 0.29 - - - 33.80 8.00 968 9.76 60.84 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C43 KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 212 2.17 13.50 - 20 D22 20 22 30 0.28 1.09 4.84 2.98 313.05
LG EXTRA 0
UG C43 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 180 1.86 11.52 - 20 D22 20 22 20 0.28 1.09 4.29 2.98 272.07
UG EXTRA 0
1 C43 0 KOTAK 0.90 0.90 0.50 0.50 17.45 22.90 5.45 0.07 10.90 302 3.12 19.62 - 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 C43 0 KOTAK 0.90 0.90 0.50 0.50 22.90 27.40 4.50 0.07 9.00 274 2.59 16.20 - 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.29 - - - 33.80 8.00 968 9.76 60.84 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C43 TRANSMITTAL : 103/STR-TP6/05/2015
C43

2,290.26
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Siku Chem Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Qty Length Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 11 8 1.50 100 19 64 0.16 3.44 - - 1.04 130.57 D13/100/100 13 100 11 100 19 0.50 4 1.04 61.90 13 200 8 0.27 0.16 118 1.04 33.13
LG
UG D13/100/100 13 100 8 8 1.50 100 16 64 0.16 3.44 - - 1.04 109.13 D13/100/100 13 100 8 100 16 0.50 4 1.04 49.52 13 200 8 0.27 0.16 96 1.04 26.96
UG
1 D10/100/100 10 100 28 100 28 64 0.13 3.43 - - 0.62 124.05 D10/100/100 10 100 28 100 28 0.49 4 0.62 68.05 13 200 8 0.27 0.16 218 1.04 98.17
1
2 D10/100/100 10 100 23 100 23 64 0.13 3.43 - - 0.62 102.78 D10/100/100 10 100 23 100 23 0.49 4 0.62 55.90 13 200 8 0.27 0.16 180 1.04 81.06
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C43 TRANSMITTAL : 103/STR-TP6/05/2015
C43

350.78 590.43 - - 1,349.05 - - - TOTAL 7,864.91 208.93 128 740 - - 100 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 225.60 - - 313.05 - - - - 182 - - 30 - - -


538.65 7,399.04 185.44 212

- 185.60 - - 272.07 - - - - 160 - - 20 - - -


457.68 6,286.77 158.24 180

192.10 98.17 - - 406.17 - - - 64 218 - - 20 - - -


696.44 9,566.55 269.51 302

158.68 81.06 - - 357.75 - - - 64 180 - - 30 - - -


597.49 8,207.27 222.53 274

350.78 590.43 - - 1,349.05 - - - 2,290.26 7,864.91 208.93 128 740 - - 100 - - - 968
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C58 TRANSMITTAL : 103/STR-TP6/05/2015
C58

Concrete Cover = 0.04 fc' = 40 0.16 - - - 3.48 8.00 385 5.48 46.72 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C58 KOTAK 1.00 0.50 0.50 0.50 10.50 14.25 3.75 0.03 1.88 4 112 0.97 11.25 - 12 D22 12 22 18 0.28 1.09 4.84 2.98 187.83
LG EXTRA 0
UG C58 0 KOTAK 1.00 0.50 0.50 0.50 14.25 17.45 3.20 0.03 1.60 4 100 0.83 9.60 - 12 D22 12 22 12 0.28 1.09 4.29 2.98 163.24
UG EXTRA 0
1 C58 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 C58 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.16 - - - 3.48 8.00 385 5.48 46.72 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C58 TRANSMITTAL : 103/STR-TP6/05/2015
C58

1,517.68
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Siku Chem Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Qty Length Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 11 100 19 64 0.16 1.84 - - 1.04 68.13 D10/100/100 10 100 11 100 19 0.57 1 0.57 1 0.62 21.20 13 200 2 0.57 0.16 30 1.04 17.49
LG
UG D13/100/100 13 100 8 100 16 64 0.16 1.84 - - 1.04 56.68 D10/100/100 10 100 8 100 16 0.57 1 0.57 1 0.62 16.96 13 200 2 0.57 0.16 24 1.04 14.23
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C58 TRANSMITTAL : 103/STR-TP6/05/2015
C58

322.55 156.52 - - 1,038.60 - - - TOTAL 9,390.02 298.58 128 182 - - 75 - - - TOTAL


TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

21.20 85.62 - - 187.83 - - - - 94 - - 18 - - -


294.65 9,066.26 346.15 112

16.96 70.90 - - 163.24 - - - - 88 - - 12 - - -


251.11 7,726.48 295.38 100

155.64 - - - 365.56 - - - 64 - - - 18 - - -
521.20 11,136.78 302.78 82

128.74 - - - 321.97 - - - 64 - - - 27 - - -
450.71 9,630.57 250.00 91

322.55 156.52 - - 1,038.60 - - - 1,517.68 9,390.02 298.58 128 182 - - 75 - - - 385


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C57 TRANSMITTAL : 103/STR-TP6/05/2015
C57

Concrete Cover = 0.04 fc' = 40 0.19 - - - 10.43 8.00 522 6.42 48.11 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C57 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 5.63 4 189 1.47 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG C57 0 KOTAK 0.90 0.70 0.50 0.50 14.25 17.45 3.20 0.05 4.80 4 160 1.27 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 C57 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 C57 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.19 - - - 10.43 8.00 522 6.42 48.11 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C57 TRANSMITTAL : 103/STR-TP6/05/2015
C57

2,091.71
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 19 100 19 64 0.16 4.83 - - 1.04 201.65 D13/100/100 13 100 - 100 - 0.78 - 0.98 - 1.04 - 13 200 6 0.27 0.16 89 1.04 24.85
LG
UG D13/100/100 13 100 16 100 16 64 0.16 4.81 - - 1.04 170.93 D13/100/100 13 100 - 100 - 0.78 - 0.98 - 1.04 - 13 200 6 0.27 0.16 72 1.04 20.22
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C57 TRANSMITTAL : 103/STR-TP6/05/2015
C57

284.38 417.65 - - 1,389.68 - - - TOTAL 10,858.81 250.75 128 289 - - 105 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 226.50 - - 375.66 - - - - 153 - - 36 - - -


602.16 12,189.50 242.91 189

- 191.14 - - 326.49 - - - - 136 - - 24 - - -


517.63 10,478.39 207.29 160

155.64 - - - 365.56 - - - 64 - - - 18 - - -
521.20 11,136.78 302.78 82

128.74 - - - 321.97 - - - 64 - - - 27 - - -
450.71 9,630.57 250.00 91

284.38 417.65 - - 1,389.68 - - - 2,091.71 10,858.81 250.75 128 289 - - 105 - - - 522
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C56 TRANSMITTAL : 103/STR-TP6/05/2015
C56

Concrete Cover = 0.04 fc' = 40 0.24 - 2.41 - 10.43 8.00 575 7.71 48.90 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C56 KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 5.63 4 219 2.17 13.50 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG C56 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 4.80 4 188 1.86 11.52 - 28 D22 28 22 28 0.28 1.09 4.29 2.98 380.90
UG EXTRA 0
1 C56 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 2.41 - 80 2.01 13.08 - 16 D22 16 22 16 0.28 1.09 6.54 2.98 324.94
1 EXTRA 0
2 C56 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 88 1.67 10.80 - 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.24 - 2.41 - 10.43 8.00 575 7.71 48.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C56 TRANSMITTAL : 103/STR-TP6/05/2015
C56

2,284.86
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D10/100/100 10 100 19 100 19 0.97 2 0.97 2 0.62 91.41 13 200 6 0.27 0.16 113 1.04 50.66
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D10/100/100 10 100 16 100 16 0.97 2 0.97 2 0.62 76.98 13 200 6 0.27 0.16 96 1.04 43.23
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C56 TRANSMITTAL : 103/STR-TP6/05/2015
C56

488.82 365.73 - - 1,430.31 - - - TOTAL 9,623.62 213.48 128 337 - - 110 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

91.41 197.30 - - 438.27 - - - - 177 - - 42 - - -


726.98 9,986.02 185.44 219

76.98 168.43 - - 380.90 - - - - 160 - - 28 - - -


626.31 8,603.20 158.24 188

175.44 - - - 324.94 - - - 64 - - - 16 - - -
500.37 10,691.76 279.49 80

144.99 - - - 286.20 - - - 64 - - - 24 - - -
431.19 9,213.51 230.77 88

488.82 365.73 - - 1,430.31 - - - 2,284.86 9,623.62 213.48 128 337 - - 110 - - - 575
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C55 TRANSMITTAL : 103/STR-TP6/05/2015
C55

Concrete Cover = 0.04 fc' = 40 0.26 - - - 13.90 8.00 654 8.36 50.29 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C55 KOTAK 1.00 0.90 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 256 2.52 14.25 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG C55 0 KOTAK 1.00 0.90 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 220 2.16 12.16 - 28 D22 28 22 28 0.28 1.09 4.29 2.98 380.90
UG EXTRA 0
1 C55 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 84 2.01 13.08 - 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 C55 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 94 1.67 10.80 - 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.26 - - - 13.90 8.00 654 8.36 50.29 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C55 TRANSMITTAL : 103/STR-TP6/05/2015
C55

2,459.55
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 8 0.27 0.16 150 1.04 67.55
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 8 0.27 0.16 128 1.04 57.64
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C55 TRANSMITTAL : 103/STR-TP6/05/2015
C55

320.43 556.02 - - 1,583.10 - - - TOTAL 9,861.10 205.70 128 406 - - 120 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 300.50 - - 438.27 - - - - 214 - - 42 - - -


738.77 8,742.82 168.64 256

- 255.52 - - 380.90 - - - - 192 - - 28 - - -


636.43 7,531.69 143.91 220

175.44 - - - 406.17 - - - 64 - - - 20 - - -
581.61 12,427.55 279.49 84

144.99 - - - 357.75 - - - 64 - - - 30 - - -
502.74 10,742.35 230.77 94

320.43 556.02 - - 1,583.10 - - - 2,459.55 9,861.10 205.70 128 406 - - 120 - - - 654
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C54 TRANSMITTAL : 103/STR-TP6/05/2015
C54

Concrete Cover = 0.04 fc' = 40 0.17 - - - 13.90 8.00 490 4.69 26.41 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C54 KOTAK 1.00 0.90 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 256 2.52 14.25 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG C54 0 KOTAK 1.00 0.90 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 234 2.16 12.16 - 28 D22 28 22 42 0.28 1.09 4.29 2.98 392.38
UG EXTRA 0

0.17 - - - 13.90 8.00 490 4.69 26.41 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C54 TRANSMITTAL : 103/STR-TP6/05/2015
C54

1,386.67
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 8 0.27 0.16 150 1.04 67.55
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 8 0.27 0.16 128 1.04 57.64
UG
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C54 TRANSMITTAL : 103/STR-TP6/05/2015
C54

- 556.02 - - 830.65 - - - TOTAL 8,205.14 156.27 - 406 - - 84 - - - TOTAL


TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 300.50 - - 438.27 - - - - 214 - - 42 - - -


738.77 8,742.82 168.64 256

- 255.52 - - 392.38 - - - - 192 - - 42 - - -


647.90 7,667.46 143.91 234

- 556.02 - - 830.65 - - - 1,386.67 8,205.14 156.27 - 406 - - 84 - - - 490


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C95 TRANSMITTAL : 103/STR-TP6/05/2015
C95

Concrete Cover = 0.04 fc' = 40 0.22 - - - 13.90 8.00 580 7.06 49.50 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C95 KOTAK 0.90 0.80 0.50 0.50 10.50 14.25 3.75 0.06 7.50 4 219 1.82 12.75 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG C95 0 KOTAK 0.90 0.80 0.50 0.50 14.25 17.45 3.20 0.06 6.40 4 188 1.57 10.88 - 28 D22 28 22 28 0.28 1.09 4.29 2.98 380.90
UG EXTRA 0
1 C95 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 C95 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.22 - - - 13.90 8.00 580 7.06 49.50 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C95 TRANSMITTAL : 103/STR-TP6/05/2015
C95

2,340.85
STIRRUPS H / V Ties Angkur Ties
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total

LG D13/100/100 13 100 19 100 19 64 0.16 3.24 - - 1.04 138.74 D13/100/100 13 100 19 100 19 0.88 2 0.98 1 1.04 107.81 13 200 6 0.27 0.16 113 1.04 50.66
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.24 - - 1.04 118.54 D13/100/100 13 100 16 100 16 0.88 2 0.98 1 1.04 90.79 13 200 6 0.27 0.16 96 1.04 43.23
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47
2
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (1) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-01
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C95 TRANSMITTAL : 103/STR-TP6/05/2015
C95

284.38 549.77 - - 1,506.70 - - - TOTAL 10,793.07 234.88 128 337 - - 115 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO TOTAL CHEMICAL HILTI CHEMICAL
10 13 16 19 22 25 29 32 ALL Rebar Formwork 10 13 16 19 22 25 29 32 ALL
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3 [titik] [titik] [titik] [titik] [titik] [titik] [titik] [titik] [Kg]

- 297.21 - - 438.27 - - - - 177 - - 42 - - -


735.48 12,037.25 208.67 219

- 252.56 - - 380.90 - - - - 160 - - 28 - - -


633.47 10,367.68 178.07 188

155.64 - - - 365.56 - - - 64 - - - 18 - - -
521.20 11,136.78 302.78 82

128.74 - - - 321.97 - - - 64 - - - 27 - - -
450.71 9,630.57 250.00 91

284.38 549.77 - - 1,506.70 - - - 2,340.85 10,793.07 234.88 128 337 - - 115 - - - 580
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE1 TRANSMITTAL : 103/STR-TP6/05/2015
KE1

Concrete Cover = 0.04 fc' = 40 0.18 - 0.80 - 7.50 4.00 518.00 4.87 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE1 A63/6S' KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 262 2.17 13.50 - 32 D25 32 25 48 0.31 1.24 4.99 3.85 672.80
LG EXTRA A63/6S'
UG KE1 A63/6S' KOTAK 0.90 0.90 14.25 17.45 3.20 0.11 0.80 - 256 2.70 11.52 - 32 D25 32 25 64 0.31 1.24 4.44 3.85 624.38
UG EXTRA A63/6S'

0.18 - 0.80 - 7.50 4.00 518.00 4.87 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE1 TRANSMITTAL : 103/STR-TP6/05/2015

1,817.36 123.16 397.03 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D10/100/100 10 100 19 100 19 0.49 4 0.62 46.18 13 200 8 0.27 0.16 150 1.04 67.55 46.18 214.19 -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D10/100/100 10 100 16 100 16 0.97 2 0.97 2 0.62 76.98 13 200 8 0.27 0.16 128 1.04 57.64 76.98 182.84 -
UG

123.16 397.03 -
KE1

- - 1,297.17 - - TOTAL 10,607.54 147.42


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 672.80 - -
933.16 12,818.14 185.44

- - 624.38 - -
884.20 8,396.93 109.40

- - 1,297.17 - - 1,817.36 10,607.54 147.42


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE2 TRANSMITTAL : 103/STR-TP6/05/2015
KE2

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 518.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE2 A24'/6S' KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 262 2.17 13.50 - 32 D25 32 25 48 0.31 1.24 4.99 3.85 672.80
LG EXTRA A24'/6S'
UG KE2 A24'/6S' KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 256 1.86 11.52 - 32 D25 32 25 64 0.31 1.24 4.44 3.85 624.38
UG EXTRA A24'/6S'

0.15 - - - 13.90 8.00 518.00 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE2 TRANSMITTAL : 103/STR-TP6/05/2015

1,817.36 123.16 397.03 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D10/100/100 10 100 19 100 19 0.49 4 0.62 46.18 13 200 8 0.27 0.16 150 1.04 67.55 46.18 214.19 -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D10/100/100 10 100 16 100 16 0.97 2 0.97 2 0.62 76.98 13 200 8 0.27 0.16 128 1.04 57.64 76.98 182.84 -
UG

123.16 397.03 -
KE2

- - 1,297.17 - - TOTAL 12,481.85 171.84


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 672.80 - -
933.16 12,818.14 185.44

- - 624.38 - -
884.20 12,145.56 158.24

- - 1,297.17 - - 1,817.36 12,481.85 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE3 TRANSMITTAL : 103/STR-TP6/05/2015
KE3

Concrete Cover = 0.04 fc' = 40 0.10 - - - 10.43 8.00 388.50 2.74 22.24 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE3 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 5.63 4 197 1.47 12.00 - 24 D25 24 25 36 0.31 1.24 4.99 3.85 504.60
LG EXTRA 0
UG KE3 0 KOTAK 0.90 0.70 0.50 0.50 14.25 17.45 3.20 0.05 4.80 4 192 1.27 10.24 - 24 D25 24 25 48 0.31 1.24 4.44 3.85 468.28
UG EXTRA 0

0.10 - - - 10.43 8.00 388.50 2.74 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE3 TRANSMITTAL : 103/STR-TP6/05/2015

1,421.68 117.61 331.19 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 48 0.16 3.04 - - 1.04 128.12 D10/100/100 10 100 19 100 19 0.97 2 0.77 1 0.62 63.85 13 200 6 0.27 0.16 113 1.04 50.66 63.85 178.78 -
LG
UG D13/100/100 13 100 16 100 16 48 0.16 3.04 - - 1.04 109.18 D10/100/100 10 100 16 100 16 0.97 2 0.77 1 0.62 53.77 13 200 6 0.27 0.16 96 1.04 43.23 53.77 152.41 -
UG

117.61 331.19 -
KE3

- - 972.88 - - TOTAL 14,389.47 225.10


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 504.60 - -
747.22 15,126.01 242.91

- - 468.28 - -
674.46 13,652.94 207.29

- - 972.88 - - 1,421.68 14,389.47 225.10


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE4 TRANSMITTAL : 103/STR-TP6/05/2015
KE4

Concrete Cover = 0.04 fc' = 40 0.13 - 0.80 - 7.50 4.00 300.50 3.57 22.24 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE4 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 197 1.47 12.00 - 24 D25 24 25 36 0.31 1.24 4.99 3.85 504.60
LG EXTRA 0
UG KE4 0 KOTAK 0.90 0.70 14.25 17.45 3.20 0.08 0.80 - 104 2.10 10.24 - 28 D25 28 25 56 0.31 1.24 4.44 3.85 546.33
UG EXTRA 0

0.13 - 0.80 - 7.50 4.00 300.50 3.57 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE4 TRANSMITTAL : 103/STR-TP6/05/2015

1,523.33 184.45 287.96 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 48 0.16 3.04 - - 1.04 128.12 D10/100/100 10 100 19 100 19 0.97 2 0.77 3 0.62 100.13 13 200 6 0.27 0.16 113 1.04 50.66 100.13 178.78 -
LG
UG D13/100/100 13 100 16 100 16 48 0.16 3.04 - - 1.04 109.18 D10/100/100 10 100 16 100 16 0.97 2 0.77 3 0.62 84.32 84.32 109.18 -
UG

184.45 287.96 -
KE4

- - 1,050.93 - - TOTAL 12,446.87 183.97


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 504.60 - -
783.51 15,860.47 242.91

- - 546.33 - -
739.83 9,033.28 125.03

- - 1,050.93 - - 1,523.33 12,446.87 183.97


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT1 TRANSMITTAL : 103/STR-TP6/05/2015
KT1

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 50.00 3.68 23.88 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT1 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 30 2.01 13.08 - 20 D22 20 22 30 0.28 1.09 6.54 2.98 414.37
1 EXTRA 0
2 KT1 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 20 1.67 10.80 - 20 D22 20 22 20 0.28 1.09 5.59 2.98 349.55
2 EXTRA 0

0.09 - - - - - 50.00 3.68 23.88 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT1 TRANSMITTAL : 103/STR-TP6/05/2015

1,074.43 310.51 - - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D10/100/150 10 100 28 150 28 2.23 - - 0.62 77.43 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05 170.48 - - -
1
2 D10/100/150 10 100 23 150 23 2.23 - - 0.62 63.60 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43 140.03 - - -
2

310.51 - - -
KT1

763.92 - - - TOTAL 11,478.97 255.13


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

414.37 - - -
584.84 12,496.67 279.49

349.55 - - -
489.59 10,461.26 230.77

763.92 - - - 1,074.43 11,478.97 255.13


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT2 TRANSMITTAL : 103/STR-TP6/05/2015
KT2

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 50.00 3.68 23.88 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT2 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 30 2.01 13.08 - 20 D22 20 22 30 0.28 1.09 6.54 2.98 414.37
1 EXTRA 0
2 KT2 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 20 1.67 10.80 - 20 D22 20 22 20 0.28 1.09 5.59 2.98 349.55
2 EXTRA 0

0.09 - - - - - 50.00 3.68 23.88 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT2 TRANSMITTAL : 103/STR-TP6/05/2015

1,074.43 310.51 - - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D10/100/150 10 100 28 150 28 2.23 - - 0.62 77.43 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05 170.48 - - -
1
2 D10/100/150 10 100 23 150 23 2.23 - - 0.62 63.60 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43 140.03 - - -
2

310.51 - - -
KT2

763.92 - - - TOTAL 11,478.97 255.13


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

414.37 - - -
584.84 12,496.67 279.49

349.55 - - -
489.59 10,461.26 230.77

763.92 - - - 1,074.43 11,478.97 255.13


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT3 TRANSMITTAL : 103/STR-TP6/05/2015
KT3

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 40.00 2.91 - 18.76


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT3 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 KT3 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 16 1.32 - 8.48 16 D22 16 22 16 0.28 1.09 5.59 2.98 279.64
2 EXTRA 0

0.09 - - - - - 40.00 2.91 - 18.76


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT3 TRANSMITTAL : 103/STR-TP6/05/2015

1,234.25 - 623.11 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 121.78 0.78 10 1.04 134.89 D13/75/75 13 75 37 75 37 0.68 2 0.68 2 1.04 208.10 - 342.99 - -
1
2 D13/75/75 13 75 30 75 30 100.57 0.78 8 1.04 111.39 D13/75/75 13 75 30 75 30 0.68 2 0.68 2 1.04 168.73 - 280.12 - -
2

- 623.11 - -
KT3

611.14 - - - TOTAL 13,186.40 200.38


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

331.50 - - -
674.48 14,411.98 219.51

279.64 - - -
559.77 11,960.82 181.25

611.14 - - - 1,234.25 13,186.40 200.38


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT4 TRANSMITTAL : 103/STR-TP6/05/2015
KT4

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 30.00 2.91 - 18.76


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT4 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 18 1.59 - 10.27 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT4 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 12 1.32 - 8.48 12 D22 12 22 12 0.28 1.09 5.59 2.98 209.73
2 EXTRA 0

0.09 - - - - - 30.00 2.91 - 18.76


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT4 TRANSMITTAL : 103/STR-TP6/05/2015

1,081.46 - ### - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 121.78 0.78 10 1.04 134.89 D13/75/75 13 75 37 75 37 0.68 2 0.68 2 1.04 208.10 - ### - -
1
2 D13/75/75 13 75 30 75 30 100.57 0.78 8 1.04 111.39 D13/75/75 13 75 30 75 30 0.68 2 0.68 2 1.04 168.73 - ### - -
2

- ### - -
KT4

458.35 - - - TOTAL 11,554.09 200.38


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
591.61 12,641.18 219.51

209.73 - - -
489.86 10,467.00 181.25

458.35 - - - 1,081.46 11,554.09 200.38


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT5 TRANSMITTAL : 103/STR-TP6/05/2015
KT5

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 40.00 2.91 - 18.76


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT5 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 KT5 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 16 1.32 - 8.48 16 D22 16 22 16 0.28 1.09 5.59 2.98 279.64
2 EXTRA 0

0.09 - - - - - 40.00 2.91 - 18.76


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT5 TRANSMITTAL : 103/STR-TP6/05/2015

1,234.25 - ### - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 121.78 0.78 10 1.04 134.89 D13/75/75 13 75 37 75 37 0.68 2 0.68 2 1.04 208.10 - ### - -
1
2 D13/75/75 13 75 30 75 30 100.57 0.78 8 1.04 111.39 D13/75/75 13 75 30 75 30 0.68 2 0.68 2 1.04 168.73 - ### - -
2

- ### - -
KT5

611.14 - - - TOTAL 13,186.40 200.38


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

331.50 - - -
674.48 14,411.98 219.51

279.64 - - -
559.77 11,960.82 181.25

611.14 - - - 1,234.25 13,186.40 200.38


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C94 TRANSMITTAL : 103/STR-TP6/05/2015
C94

Concrete Cover = 0.04 fc' = 40 0.20 - - - 13.90 8.00 518.00 5.41 27.80 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C94 KOTAK 1.00 1.00 0.50 0.50 10.50 14.25 3.75 0.10 7.50 4 262 2.91 15.00 - 32 D25 32 25 48 0.31 1.24 4.99 3.85 672.80
LG EXTRA 0
UG C94 0 KOTAK 1.00 1.00 0.50 0.50 14.25 17.45 3.20 0.10 6.40 4 256 2.50 12.80 - 32 D25 32 25 64 0.31 1.24 4.44 3.85 624.38
UG EXTRA 0

0.20 - - - 13.90 8.00 518.00 5.41 27.80 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C94 TRANSMITTAL : 103/STR-TP6/05/2015

1,909.07 185.75 426.15 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.84 - - 1.04 162.45 D10/100/100 10 100 19 100 19 1.07 2 1.07 2 0.62 100.84 13 200 8 0.27 0.16 150 1.04 67.55 100.84 230.00 -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.84 - - 1.04 138.51 D10/100/100 10 100 16 100 16 1.07 2 1.07 2 0.62 84.92 13 200 8 0.27 0.16 128 1.04 57.64 84.92 196.15 -
UG

185.75 426.15 -
C94

- - 1,297.17 - - TOTAL 9,790.12 142.56


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 672.80 - -
1,003.63 10,293.62 153.85

- - 624.38 - -
905.45 9,286.62 131.28

- - 1,297.17 - - 1,909.07 9,790.12 142.56


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C76 TRANSMITTAL : 103/STR-TP6/05/2015
C76

Concrete Cover = 0.04 fc' = 40 0.20 - - - 13.90 8.00 518.00 5.41 27.80 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C76 KOTAK 1.00 1.00 0.50 0.50 10.50 14.25 3.75 0.10 7.50 4 262 2.91 15.00 - 32 D25 32 25 48 0.31 1.24 4.99 3.85 672.80
LG EXTRA 0
UG C76 0 KOTAK 1.00 1.00 0.50 0.50 14.25 17.45 3.20 0.10 6.40 4 256 2.50 12.80 - 32 D25 32 25 64 0.31 1.24 4.44 3.85 624.38
UG EXTRA 0

0.20 - - - 13.90 8.00 518.00 5.41 27.80 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C76 TRANSMITTAL : 103/STR-TP6/05/2015

1,909.07 185.75 426.15 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.84 - - 1.04 162.45 D10/100/100 10 100 19 100 19 1.07 2 1.07 2 0.62 100.84 13 200 8 0.27 0.16 150 1.04 67.55 100.84 230.00 -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.84 - - 1.04 138.51 D10/100/100 10 100 16 100 16 1.07 2 1.07 2 0.62 84.92 13 200 8 0.27 0.16 128 1.04 57.64 84.92 196.15 -
UG

185.75 426.15 -
C76

- - 1,297.17 - - TOTAL 9,790.12 142.56


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 672.80 - -
1,003.63 10,293.62 153.85

- - 624.38 - -
905.45 9,286.62 131.28

- - 1,297.17 - - 1,909.07 9,790.12 142.56


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C98 TRANSMITTAL : 103/STR-TP6/05/2015
C98

Concrete Cover = 0.04 fc' = 40 0.13 - 0.80 - 7.50 4.00 275.00 3.64 22.24 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C98 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 163 1.51 12.00 - 16 D25 16 25 24 0.31 1.24 4.99 3.85 336.40
LG EXTRA 0
UG C98 0 KOTAK 0.80 0.80 14.25 17.45 3.20 0.08 0.80 - 112 2.13 10.24 - 24 D25 24 25 48 0.31 1.24 4.44 3.85 468.28
UG EXTRA 0

0.13 - 0.80 - 7.50 4.00 275.00 3.64 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C98 TRANSMITTAL : 103/STR-TP6/05/2015

1,191.21 110.04 276.49 -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D10/100/100 10 100 19 100 19 0.87 1 0.87 1 0.62 40.99 13 200 4 0.27 0.16 75 1.04 33.77 40.99 164.61 -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D10/100/100 10 100 16 100 16 0.87 2 0.87 2 0.62 69.04 69.04 111.89 -
UG

110.04 276.49 -
C98

- - 804.68 - - TOTAL 9,246.67 179.88


TOTAL REBAR of KOLOM WEIGHT RASIO
19 22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 336.40 - -
542.00 10,690.30 236.69

- - 468.28 - -
649.21 7,803.05 123.08

- - 804.68 - - 1,191.21 9,246.67 179.88


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C97 TRANSMITTAL : 103/STR-TP6/05/2015
C97

Concrete Cover = 0.04 fc' = 40 0.10 - - - 13.90 8.00 365.00 2.81 22.24 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C97 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 181 1.51 12.00 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG C97 0 KOTAK 0.80 0.80 0.50 0.50 14.25 17.45 3.20 0.05 6.40 4 184 1.30 10.24 - 28 D22 28 22 56 0.28 1.09 4.29 2.98 403.85
UG EXTRA 0

0.10 - - - 13.90 8.00 365.00 2.81 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (2) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-02
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C97 TRANSMITTAL : 103/STR-TP6/05/2015

1,338.75 - 496.63 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D13/100/100 13 100 19 100 19 0.88 1 0.88 2 1.04 103.86 13 200 4 0.27 0.16 75 1.04 33.77 - 268.46 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D13/100/100 13 100 16 100 16 0.88 1 0.88 2 1.04 87.46 13 200 4 0.27 0.16 64 1.04 28.82 - 228.17 - -
UG

- 496.63 - -
C97

842.12 - - - TOTAL 13,202.67 219.33


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

438.27 - - -
706.73 13,939.51 236.69

403.85 - - -
632.02 12,465.82 201.97

842.12 - - - 1,338.75 13,202.67 219.33


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT6 TRANSMITTAL : 103/STR-TP6/05/2015
KT6

Concrete Cover = 0.04 fc' = 40 0.13 - - - - - 60.00 3.45 - 26.55


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KT6 BULAT 0.50 0.50 10.50 14.25 3.75 0.03 - 18 0.77 - 5.89 12 D22 12 22 18 0.28 1.09 4.84 2.98 187.83
LG EXTRA 0
UG KT6 0 BULAT 0.50 0.50 14.25 17.45 3.20 0.03 - 12 0.66 - 5.03 12 D22 12 22 12 0.28 1.09 4.29 2.98 163.24
UG EXTRA 0
1 KT6 0 BULAT 0.50 0.50 17.45 22.90 5.45 0.03 - 12 1.10 - 8.56 12 D22 12 22 12 0.28 1.09 6.54 2.98 243.70
1 EXTRA 0
2 KT6 0 BULAT 0.50 0.50 22.90 27.40 4.50 0.03 - 18 0.92 - 7.07 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.13 - - - - - 60.00 3.45 - 26.55


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT6 TRANSMITTAL : 103/STR-TP6/05/2015

1,149.39 - 339.97 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/75 13 75 25 75 25 68.12 0.78 6 1.04 75.45 D13/75/75 13 75 25 75 25 0.58 - 0.58 - 1.04 - - 75.45 - -
LG
UG D13/75/75 13 75 22 75 22 58.14 0.78 5 1.04 64.40 D13/75/75 13 75 22 75 22 0.58 - 0.58 - 1.04 - - 64.40 - -
UG
1 D13/75/75 13 75 37 75 37 98.95 0.78 8 1.04 109.60 D13/75/75 13 75 37 75 37 0.58 - 0.58 - 1.04 - - 109.60 - -
1
2 D13/75/75 13 75 30 75 30 81.72 0.78 7 1.04 90.52 D13/75/75 13 75 30 75 30 0.58 - 0.58 - 1.04 - - 90.52 - -
2

- 339.97 - -
KT6

809.43 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

187.83 - - -
263.28

163.24 - - -
227.64

243.70 - - -
353.30

214.65 - - -
305.17

809.43 - - - 1,149.39
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT7 TRANSMITTAL : 103/STR-TP6/05/2015
KT7

Concrete Cover = 0.04 fc' = 40 0.13 - - - - - 60.00 3.45 - 26.55


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KT7 BULAT 0.50 0.50 10.50 14.25 3.75 0.03 - 18 0.77 - 5.89 12 D22 12 22 18 0.28 1.09 4.84 2.98 187.83
LG EXTRA 0
UG KT7 0 BULAT 0.50 0.50 14.25 17.45 3.20 0.03 - 12 0.66 - 5.03 12 D22 12 22 12 0.28 1.09 4.29 2.98 163.24
UG EXTRA 0
1 KT7 0 BULAT 0.50 0.50 17.45 22.90 5.45 0.03 - 12 1.10 - 8.56 12 D22 12 22 12 0.28 1.09 6.54 2.98 243.70
1 EXTRA 0
2 KT7 0 BULAT 0.50 0.50 22.90 27.40 4.50 0.03 - 18 0.92 - 7.07 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.13 - - - - - 60.00 3.45 - 26.55


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT7 TRANSMITTAL : 103/STR-TP6/05/2015

1,149.39 - 339.97 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/75 13 75 25 75 25 68.12 0.78 6 1.04 75.45 D13/75/75 13 75 25 75 25 0.58 - 0.58 - 1.04 - - 75.45 - -
LG
UG D13/75/75 13 75 22 75 22 58.14 0.78 5 1.04 64.40 D13/75/75 13 75 22 75 22 0.58 - 0.58 - 1.04 - - 64.40 - -
UG
1 D13/75/75 13 75 37 75 37 98.95 0.78 8 1.04 109.60 D13/75/75 13 75 37 75 37 0.58 - 0.58 - 1.04 - - 109.60 - -
1
2 D13/75/75 13 75 30 75 30 81.72 0.78 7 1.04 90.52 D13/75/75 13 75 30 75 30 0.58 - 0.58 - 1.04 - - 90.52 - -
2

- 339.97 - -
KT7

809.43 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

187.83 - - -
263.28

163.24 - - -
227.64

243.70 - - -
353.30

214.65 - - -
305.17

809.43 - - - 1,149.39
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT8 TRANSMITTAL : 103/STR-TP6/05/2015
KT8

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 30.00 2.02 - 15.63


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT8 BULAT 0.50 0.50 17.45 22.90 5.45 0.03 - 18 1.10 - 8.56 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT8 0 BULAT 0.50 0.50 22.90 27.40 4.50 0.03 - 12 0.92 - 7.07 12 D22 12 22 12 0.28 1.09 5.59 2.98 209.73
2 EXTRA 0

0.07 - - - - - 30.00 2.02 - 15.63


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT8 TRANSMITTAL : 103/STR-TP6/05/2015

658.47 - 200.12 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 98.95 0.78 8 1.04 109.60 D13/75/75 13 75 37 75 37 0.58 - 0.58 - 1.04 - - 109.60 - -
1
2 D13/75/75 13 75 30 75 30 81.72 0.78 7 1.04 90.52 D13/75/75 13 75 30 75 30 0.58 - 0.58 - 1.04 - - 90.52 - -
2

- 200.12 - -
KT8

458.35 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
358.22

209.73 - - -
300.25

458.35 - - - 658.47
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT9 TRANSMITTAL : 103/STR-TP6/05/2015
KT9

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 30.00 2.02 - 15.63


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT9 BULAT 0.50 0.50 17.45 22.90 5.45 0.03 - 18 1.10 - 8.56 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT9 0 BULAT 0.50 0.50 22.90 27.40 4.50 0.03 - 12 0.92 - 7.07 12 D22 12 22 12 0.28 1.09 5.59 2.98 209.73
2 EXTRA 0

0.07 - - - - - 30.00 2.02 - 15.63


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT9 TRANSMITTAL : 103/STR-TP6/05/2015

658.47 - 200.12 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 98.95 0.78 8 1.04 109.60 D13/75/75 13 75 37 75 37 0.58 - 0.58 - 1.04 - - 109.60 - -
1
2 D13/75/75 13 75 30 75 30 81.72 0.78 7 1.04 90.52 D13/75/75 13 75 30 75 30 0.58 - 0.58 - 1.04 - - 90.52 - -
2

- 200.12 - -
KT9

458.35 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
358.22

209.73 - - -
300.25

458.35 - - - 658.47
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT10 TRANSMITTAL : 103/STR-TP6/05/2015
KT10

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 30.00 2.02 - 15.63


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT10 BULAT 0.50 0.50 17.45 22.90 5.45 0.03 - 18 1.10 - 8.56 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT10 0 BULAT 0.50 0.50 22.90 27.40 4.50 0.03 - 12 0.92 - 7.07 12 D22 12 22 12 0.28 1.09 5.59 2.98 209.73
2 EXTRA 0

0.07 - - - - - 30.00 2.02 - 15.63


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT10 TRANSMITTAL : 103/STR-TP6/05/2015

658.47 - 200.12 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/75 13 75 37 75 37 98.95 0.78 8 1.04 109.60 D13/75/75 13 75 37 75 37 0.58 - 0.58 - 1.04 - - 109.60 - -
1
2 D13/75/75 13 75 30 75 30 81.72 0.78 7 1.04 90.52 D13/75/75 13 75 30 75 30 0.58 - 0.58 - 1.04 - - 90.52 - -
2

- 200.12 - -
KT10

458.35 - - - TOTAL
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
358.22

209.73 - - -
300.25

458.35 - - - 658.47
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE5 TRANSMITTAL : 103/STR-TP6/05/2015
KE5

Concrete Cover = 0.04 fc' = 40 0.16 - - - 3.48 8.00 401 5.48 46.72 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE5 KOTAK 1.00 0.50 0.50 0.50 10.50 14.25 3.75 0.03 1.88 4 120 0.97 11.25 - 12 D22 12 22 18 0.28 1.09 4.84 2.98 187.83
LG EXTRA 0
UG KE5 0 KOTAK 1.00 0.50 0.50 0.50 14.25 17.45 3.20 0.03 1.60 4 108 0.83 9.60 - 12 D22 12 22 12 0.28 1.09 4.29 2.98 163.24
UG EXTRA 0
1 KE5 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 KE5 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.16 - - - 3.48 8.00 401 5.48 46.72 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE5 TRANSMITTAL : 103/STR-TP6/05/2015

1,580.80 333.86 208.34 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 1.84 - - 1.04 83.41 D10/100/100 10 100 19 100 19 0.57 1 0.57 1 0.62 26.86 13 200 2 0.57 0.16 38 1.04 28.59 26.86 112.00 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 1.84 - - 1.04 71.95 D10/100/100 10 100 16 100 16 0.57 1 0.57 1 0.62 22.62 13 200 2 0.57 0.16 32 1.04 24.39 22.62 96.35 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32 155.64 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47 128.74 - - -
2

333.86 208.34 - -
KE5

1,038.60 - - - TOTAL 9,875.61 298.58


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

187.83 - - -
326.68 10,051.78 346.15

163.24 - - -
282.21 8,683.31 295.38

365.56 - - -
521.20 11,136.78 302.78

321.97 - - -
450.71 9,630.57 250.00

1,038.60 - - - 1,580.80 9,875.61 298.58


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE6 TRANSMITTAL : 103/STR-TP6/05/2015
KE6

Concrete Cover = 0.04 fc' = 40 0.19 - - - 10.43 8.00 570 6.42 48.11 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE6 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 5.63 4 213 1.47 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KE6 0 KOTAK 0.90 0.70 0.50 0.50 14.25 17.45 3.20 0.05 4.80 4 184 1.27 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 KE6 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 KE6 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.19 - - - 10.43 8.00 570 6.42 48.11 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE6 TRANSMITTAL : 103/STR-TP6/05/2015

2,194.71 284.38 520.65 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D13/100/100 13 100 19 100 19 0.78 2 0.98 1 1.04 99.91 13 200 6 0.27 0.16 113 1.04 50.66 - 281.40 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D13/100/100 13 100 16 100 16 0.78 2 0.98 1 1.04 84.13 13 200 6 0.27 0.16 96 1.04 43.23 - 239.25 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32 155.64 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47 128.74 - - -
2

284.38 520.65 - -
KE6

1,389.68 - - - TOTAL 11,380.08 250.75


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
657.06 13,300.78 242.91

326.49 - - -
565.74 11,452.20 207.29

365.56 - - -
521.20 11,136.78 302.78

321.97 - - -
450.71 9,630.57 250.00

1,389.68 - - - 2,194.71 11,380.08 250.75


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE7 TRANSMITTAL : 103/STR-TP6/05/2015
KE7

Concrete Cover = 0.04 fc' = 40 0.19 - 2.41 - 10.43 8.00 565 6.42 46.12 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE7 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 5.63 4 213 1.47 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KE7 0 KOTAK 0.90 0.70 0.50 0.50 14.25 17.45 3.20 0.05 4.80 4 184 1.27 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 KE7 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 2.41 - 80 2.01 13.08 - 16 D22 16 22 16 0.28 1.09 6.54 2.98 324.94
1 EXTRA 0
2 KE7 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 88 1.67 10.80 - 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - 2.41 - 10.43 8.00 565 6.42 46.12 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE7 TRANSMITTAL : 103/STR-TP6/05/2015

2,079.26 429.36 336.61 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D10/100/100 10 100 19 100 19 0.77 2 0.97 1 0.62 59.14 13 200 6 0.27 0.16 113 1.04 50.66 59.14 181.49 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D10/100/100 10 100 16 100 16 0.77 2 0.97 1 0.62 49.80 13 200 6 0.27 0.16 96 1.04 43.23 49.80 155.12 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05 175.44 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43 144.99 - - -
2

429.36 336.61 - -
KE7

1,313.29 - - - TOTAL 10,784.48 240.11


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
616.29 12,475.45 242.91

326.49 - - -
531.41 10,757.19 207.29

324.94 - - -
500.37 10,691.76 279.49

286.20 - - -
431.19 9,213.51 230.77

1,313.29 - - - 2,079.26 10,784.48 240.11


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE8 TRANSMITTAL : 103/STR-TP6/05/2015
KE8

Concrete Cover = 0.04 fc' = 40 0.22 - - - 10.43 8.00 580 7.06 49.50 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE8 KOTAK 0.90 0.80 0.50 0.50 10.50 14.25 3.75 0.06 5.63 4 219 1.82 12.75 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG KE8 0 KOTAK 0.90 0.80 0.50 0.50 14.25 17.45 3.20 0.06 4.80 4 188 1.57 10.88 - 28 D22 28 22 28 0.28 1.09 4.29 2.98 380.90
UG EXTRA 0
1 KE8 0 KOTAK 0.90 0.40 17.45 22.90 5.45 0.05 - 82 2.01 14.17 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 KE8 0 KOTAK 0.90 0.40 22.90 27.40 4.50 0.05 - 91 1.67 11.70 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.22 - - - 10.43 8.00 580 7.06 49.50 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE8 TRANSMITTAL : 103/STR-TP6/05/2015

2,340.85 284.38 549.77 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.24 - - 1.04 138.74 D13/100/100 13 100 19 100 19 0.88 2 0.98 1 1.04 107.81 13 200 6 0.27 0.16 113 1.04 50.66 - 297.21 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.24 - - 1.04 118.54 D13/100/100 13 100 16 100 16 0.88 2 0.98 1 1.04 90.79 13 200 6 0.27 0.16 96 1.04 43.23 - 252.56 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.43 - - 0.62 89.33 D10/100/150 10 100 28 150 28 0.47 2 0.97 1 0.62 66.32 155.64 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.43 - - 0.62 74.26 D10/100/150 10 100 23 150 23 0.47 2 0.97 1 0.62 54.47 128.74 - - -
2

284.38 549.77 - -
KE8

1,506.70 - - - TOTAL 10,793.07 234.88


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

438.27 - - -
735.48 12,037.25 208.67

380.90 - - -
633.47 10,367.68 178.07

365.56 - - -
521.20 11,136.78 302.78

321.97 - - -
450.71 9,630.57 250.00

1,506.70 - - - 2,340.85 10,793.07 234.88


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE9 TRANSMITTAL : 103/STR-TP6/05/2015
KE9

Concrete Cover = 0.04 fc' = 40 0.23 - - - 13.90 8.00 528 6.77 22.24 21.88
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE9 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 175 1.51 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KE9 0 KOTAK 0.80 0.80 0.50 0.50 14.25 17.45 3.20 0.05 6.40 4 152 1.30 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 KE9 0 BULAT 0.70 0.70 17.45 22.90 5.45 0.06 - 97 2.16 - 11.99 12 D22 12 22 12 0.28 1.09 6.54 2.98 243.70
1 EXTRA 0
2 KE9 0 BULAT 0.70 0.70 22.90 27.40 4.50 0.06 - 103 1.80 - 9.90 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.23 - - - 13.90 8.00 528 6.77 22.24 21.88


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (3) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-03
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE9 TRANSMITTAL : 103/STR-TP6/05/2015

2,059.57 127.94 771.12 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 4 0.27 0.16 75 1.04 33.77 - 243.01 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 4 0.27 0.16 64 1.04 28.82 - 206.74 - -
UG
1 D13/75/75 13 75 37 75 37 85 0.16 144.61 0.78 12 1.04 174.64 D10/75/75 10 75 37 75 37 0.77 1 0.77 1 0.62 70.66 70.66 174.64 - -
1
2 D13/75/75 13 75 30 75 30 85 0.16 119.42 0.78 10 1.04 146.74 D10/75/75 10 75 30 75 30 0.77 1 0.77 1 0.62 57.29 57.29 146.74 - -
2

127.94 771.12 - -
KE9

1,160.50 - - - TOTAL 9,242.25 195.54


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
618.67 12,202.61 236.69

326.49 - - -
533.22 10,517.24 201.97

243.70 - - -
489.00 7,676.55 188.15

214.65 - - -
418.67 6,572.60 155.35

1,160.50 - - - 2,059.57 9,242.25 195.54


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE10 TRANSMITTAL : 103/STR-TP6/05/2015
KE10

Concrete Cover = 0.04 fc' = 40 0.21 - - - 31.34 8.00 627 6.20 22.24 27.02
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE10 KOTAK 0.80 0.80 0.50 0.50 10.50 14.25 3.75 0.05 7.50 4 175 1.51 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KE10 0 KOTAK 0.80 0.80 0.50 0.50 14.25 17.45 3.20 0.05 6.40 4 152 1.30 10.24 - 24 D22 24 22 24 0.28 1.09 4.29 2.98 326.49
UG EXTRA 0
1 KE10 0 BULAT 1.00 1.00 0.80 0.80 17.45 22.90 5.45 0.05 17.44 197 1.59 - 17.12 24 D22 24 22 24 0.28 1.09 6.54 2.98 487.41
1 EXTRA 0
2 KE10 0 BULAT 0.70 0.70 22.90 27.40 4.50 0.06 - 103 1.80 - 9.90 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.21 - - - 31.34 8.00 627 6.20 22.24 27.02


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE10 TRANSMITTAL : 103/STR-TP6/05/2015

2,232.20 141.26 686.73 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Ver Qty Hor Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 4 0.27 0.16 75 1.04 33.77 - 243.01 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 4 0.27 0.16 64 1.04 28.82 - 206.74 - -
UG
1 D13/100/100 13 100 28 100 28 64 0.16 159.85 0.78 13 1.04 187.90 13 200 4 0.27 0.16 109 1.04 49.08 - 236.98 - -
1
2 D10/75/75 10 75 30 75 30 85 0.13 118.83 0.60 10 0.62 83.97 D10/75/75 10 75 30 75 30 0.77 1 0.77 1 0.62 57.29 141.26 - - -
2

141.26 686.73 - -
KE10

1,404.21 - - - TOTAL 10,946.40 239.97


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
618.67 12,202.61 236.69

326.49 - - -
533.22 10,517.24 201.97

487.41 - - -
724.39 15,478.46 365.85

214.65 - - -
355.91 5,587.29 155.35

1,404.21 - - - 2,232.20 10,946.40 239.97


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE11 TRANSMITTAL : 103/STR-TP6/05/2015
KE11

Concrete Cover = 0.04 fc' = 40 0.22 - 1.36 - 13.90 8.00 575 7.06 47.51 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE11 KOTAK 0.90 0.80 0.50 0.50 10.50 14.25 3.75 0.06 7.50 4 219 1.82 12.75 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG KE11 0 KOTAK 0.90 0.80 0.50 0.50 14.25 17.45 3.20 0.06 6.40 4 188 1.57 10.88 - 28 D22 28 22 28 0.28 1.09 4.29 2.98 380.90
UG EXTRA 0
1 KE11 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 1.36 - 80 2.01 13.08 - 16 D22 16 22 16 0.28 1.09 6.54 2.98 324.94
1 EXTRA 0
2 KE11 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 88 1.67 10.80 - 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.22 - 1.36 - 13.90 8.00 575 7.06 47.51 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE11 TRANSMITTAL : 103/STR-TP6/05/2015

2,246.35 320.43 495.61 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.24 - - 1.04 138.74 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 6 0.27 0.16 113 1.04 50.66 - 267.80 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.24 - - 1.04 118.54 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 6 0.27 0.16 96 1.04 43.23 - 227.80 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 2 0.67 2 0.62 93.05 175.44 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 2 0.67 2 0.62 76.43 144.99 - - -
2

320.43 495.61 - -
KE11

1,430.31 - - - TOTAL 10,355.94 224.25


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

438.27 - - -
706.07 11,556.03 208.67

380.90 - - -
608.71 9,962.44 178.07

324.94 - - -
500.37 10,691.76 279.49

286.20 - - -
431.19 9,213.51 230.77

1,430.31 - - - 2,246.35 10,355.94 224.25


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE12 TRANSMITTAL : 103/STR-TP6/05/2015
KE12

Concrete Cover = 0.04 fc' = 40 0.23 - 1.36 - 13.90 8.00 505 7.09 46.31 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE12 KOTAK 1.10 0.80 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 187 2.44 14.25 - 32 D22 32 22 48 0.28 1.09 4.84 2.98 500.88
LG EXTRA 0
UG KE12 0 KOTAK 1.10 0.80 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 160 2.10 12.16 - 32 D22 32 22 32 0.28 1.09 4.29 2.98 435.32
UG EXTRA 0
1 KE12 0 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 1.36 - 76 1.40 10.90 - 12 D22 12 22 12 0.28 1.09 6.54 2.98 243.70
1 EXTRA 0
2 KE12 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 82 1.16 9.00 - 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.23 - 1.36 - 13.90 8.00 505 7.09 46.31 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE12 TRANSMITTAL : 103/STR-TP6/05/2015

2,256.82 269.84 592.44 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.50 2 1.18 2 1.04 132.15 13 200 4 0.27 0.16 75 1.04 33.77 - 320.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.50 2 1.18 2 1.04 111.29 13 200 4 0.27 0.16 64 1.04 28.82 - 271.96 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 1.83 - - 0.62 68.50 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 147.66 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 1.83 - - 0.62 57.15 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 122.18 - - -
2

269.84 592.44 - -
KE12

1,394.55 - - - TOTAL 10,267.62 233.69


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

500.88 - - -
821.35 10,028.71 173.99

435.32 - - -
707.28 8,635.93 148.47

243.70 - - -
391.36 12,041.96 335.38

214.65 - - -
336.83 10,363.90 276.92

1,394.55 - - - 2,256.82 10,267.62 233.69


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE13 TRANSMITTAL : 103/STR-TP6/05/2015
KE13

Concrete Cover = 0.04 fc' = 40 0.15 - - - 10.43 8.00 427 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE13 KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 5.63 4 222 2.17 13.50 - 30 D22 30 22 45 0.28 1.09 4.84 2.98 469.57
LG EXTRA 0
UG KE13 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 4.80 4 205 1.86 11.52 - 30 D22 30 22 45 0.28 1.09 4.29 2.98 420.40
UG EXTRA 0

0.15 - - - 10.43 8.00 427 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE13 TRANSMITTAL : 103/STR-TP6/05/2015

1,539.92 - 649.94 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.98 2 0.98 2 1.04 154.29 13 200 6 0.27 0.16 113 1.04 50.66 - 351.59 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.98 2 0.98 2 1.04 129.93 13 200 6 0.27 0.16 96 1.04 43.23 - 298.36 - -
UG

- 649.94 - -
KE13

889.98 - - - TOTAL 10,576.37 171.84


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

469.57 - - -
821.16 11,279.68 185.44

420.40 - - -
718.76 9,873.06 158.24

889.98 - - - 1,539.92 10,576.37 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE14 TRANSMITTAL : 103/STR-TP6/05/2015
KE14

Concrete Cover = 0.04 fc' = 40 0.16 - - - 10.43 8.00 433 4.42 26.41 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE14 KOTAK 1.15 0.75 0.50 0.50 10.50 14.25 3.75 0.08 5.63 4 225 2.38 14.25 - 32 D22 32 22 48 0.28 1.09 4.84 2.98 500.88
LG EXTRA 0
UG KE14 0 KOTAK 1.15 0.75 0.50 0.50 14.25 17.45 3.20 0.08 4.80 4 208 2.04 12.16 - 32 D22 32 22 48 0.28 1.09 4.29 2.98 448.43
UG EXTRA 0

0.16 - - - 10.43 8.00 433 4.42 26.41 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE14 TRANSMITTAL : 103/STR-TP6/05/2015

1,489.31 159.71 380.29 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D10/100/100 10 100 19 100 19 0.82 3 1.22 1 0.62 86.70 13 200 6 0.27 0.16 113 1.04 50.66 86.70 205.21 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D10/100/100 10 100 16 100 16 0.82 3 1.22 1 0.62 73.01 13 200 6 0.27 0.16 96 1.04 43.23 73.01 175.09 - -
UG

159.71 380.29 - -
KE14

949.31 - - - TOTAL 9,352.04 165.84


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

500.88 - - -
792.78 9,956.47 178.96

448.43 - - -
696.53 8,747.60 152.72

949.31 - - - 1,489.31 9,352.04 165.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE15 TRANSMITTAL : 103/STR-TP6/05/2015
KE15

Concrete Cover = 0.04 fc' = 40 0.13 - - - 10.43 8.00 415 3.61 24.33 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE15 KOTAK 1.00 0.75 0.50 0.50 10.50 14.25 3.75 0.07 5.63 4 216 1.94 13.13 - 26 D22 26 22 39 0.28 1.09 4.84 2.98 406.96
LG EXTRA 0
UG KE15 0 KOTAK 1.00 0.75 0.50 0.50 14.25 17.45 3.20 0.07 4.80 4 199 1.67 11.20 - 26 D22 26 22 39 0.28 1.09 4.29 2.98 364.35
UG EXTRA 0

0.13 - - - 10.43 8.00 415 3.61 24.33 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE15 TRANSMITTAL : 103/STR-TP6/05/2015

1,247.38 117.61 358.45 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.34 - - 1.04 142.69 D10/100/100 10 100 19 100 19 0.82 2 1.07 1 0.62 63.85 13 200 6 0.27 0.16 113 1.04 50.66 63.85 193.35 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.34 - - 1.04 121.87 D10/100/100 10 100 16 100 16 0.82 2 1.07 1 0.62 53.77 13 200 6 0.27 0.16 96 1.04 43.23 53.77 165.10 - -
UG

117.61 358.45 - -
KE15

771.31 - - - TOTAL 9,595.22 187.12


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

406.96 - - -
664.16 10,217.85 201.92

364.35 - - -
583.22 8,972.59 172.31

771.31 - - - 1,247.38 9,595.22 187.12


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE16 TRANSMITTAL : 103/STR-TP6/05/2015
KE16

Concrete Cover = 0.04 fc' = 40 0.17 - - - 13.90 8.00 366 4.69 26.41 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE16 KOTAK 1.00 0.90 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 189 2.52 14.25 - 33 D22 33 22 50 0.28 1.09 4.84 2.98 516.53
LG EXTRA 0
UG KE16 0 KOTAK 1.00 0.90 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 178 2.16 12.16 - 33 D22 33 22 50 0.28 1.09 4.29 2.98 462.44
UG EXTRA 0

0.17 - - - 13.90 8.00 366 4.69 26.41 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE16 TRANSMITTAL : 103/STR-TP6/05/2015

1,548.41 - 569.43 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.98 2 1.08 1 1.04 119.67 13 200 4 0.27 0.16 75 1.04 33.77 - 307.98 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.98 2 1.08 1 1.04 100.77 13 200 4 0.27 0.16 64 1.04 28.82 - 261.45 - -
UG

- 569.43 - -
KE16

978.97 - - - TOTAL 9,162.17 156.27


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

516.53 - - -
824.52 9,757.58 168.64

462.44 - - -
723.89 8,566.76 143.91

978.97 - - - 1,548.41 9,162.17 156.27


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE17 TRANSMITTAL : 103/STR-TP6/05/2015
KE17

Concrete Cover = 0.04 fc' = 40 0.15 - - - 10.43 8.00 421 4.15 25.72 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE17 KOTAK 1.10 0.75 0.50 0.50 10.50 14.25 3.75 0.07 5.63 4 219 2.23 13.88 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG KE17 0 KOTAK 1.10 0.75 0.50 0.50 14.25 17.45 3.20 0.07 4.80 4 202 1.91 11.84 - 28 D22 28 22 42 0.28 1.09 4.29 2.98 392.38
UG EXTRA 0

0.15 - - - 10.43 8.00 421 4.15 25.72 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE17 TRANSMITTAL : 103/STR-TP6/05/2015

1,325.61 121.95 373.01 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.54 - - 1.04 150.59 D10/100/100 10 100 19 100 19 0.82 2 1.17 1 0.62 66.20 13 200 6 0.27 0.16 113 1.04 50.66 66.20 201.25 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.54 - - 1.04 128.53 D10/100/100 10 100 16 100 16 0.82 2 1.17 1 0.62 55.75 13 200 6 0.27 0.16 96 1.04 43.23 55.75 171.76 - -
UG

121.95 373.01 - -
KE17

830.65 - - - TOTAL 8,866.96 172.01


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

438.27 - - -
705.73 9,441.14 185.62

392.38 - - -
619.89 8,292.78 158.39

830.65 - - - 1,325.61 8,866.96 172.01


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE18 TRANSMITTAL : 103/STR-TP6/05/2015
KE18

Concrete Cover = 0.04 fc' = 40 0.19 - - - 13.90 8.00 372 5.34 27.80 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE18 KOTAK 1.10 0.90 0.50 0.50 10.50 14.25 3.75 0.10 7.50 4 192 2.87 15.00 - 35 D22 35 22 53 0.28 1.09 4.84 2.98 547.84
LG EXTRA 0
UG KE18 0 KOTAK 1.10 0.90 0.50 0.50 14.25 17.45 3.20 0.10 6.40 4 181 2.46 12.80 - 35 D22 35 22 53 0.28 1.09 4.29 2.98 490.47
UG EXTRA 0

0.19 - - - 13.90 8.00 372 5.34 27.80 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (4) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-04
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE18 TRANSMITTAL : 103/STR-TP6/05/2015

1,629.58 - 591.27 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.84 - - 1.04 162.45 D13/100/100 13 100 19 100 19 0.98 2 1.18 1 1.04 123.62 13 200 4 0.27 0.16 75 1.04 33.77 - 319.84 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.84 - - 1.04 138.51 D13/100/100 13 100 16 100 16 0.98 2 1.18 1 1.04 104.10 13 200 4 0.27 0.16 64 1.04 28.82 - 271.43 - -
UG

- 591.27 - -
KE18

1,038.31 - - - TOTAL 8,469.74 144.49


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

547.84 - - -
867.68 9,019.50 155.93

490.47 - - -
761.90 7,919.98 133.06

1,038.31 - - - 1,629.58 8,469.74 144.49


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE19 TRANSMITTAL : 103/STR-TP6/05/2015
KE19

Concrete Cover = 0.04 fc' = 40 0.15 - - - 10.43 8.00 427 4.15 25.72 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE19 KOTAK 1.10 0.75 0.50 0.50 10.50 14.25 3.75 0.07 5.63 4 222 2.23 13.88 - 30 D22 30 22 45 0.28 1.09 4.84 2.98 469.57
LG EXTRA 0
UG KE19 0 KOTAK 1.10 0.75 0.50 0.50 14.25 17.45 3.20 0.07 4.80 4 205 1.91 11.84 - 30 D22 30 22 45 0.28 1.09 4.29 2.98 420.40
UG EXTRA 0

0.15 - - - 10.43 8.00 427 4.15 25.72 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE19 TRANSMITTAL : 103/STR-TP6/05/2015

1,420.53 157.54 373.01 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.54 - - 1.04 150.59 D10/100/100 10 100 19 100 19 0.82 3 1.17 1 0.62 85.52 13 200 6 0.27 0.16 113 1.04 50.66 85.52 201.25 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.54 - - 1.04 128.53 D10/100/100 10 100 16 100 16 0.82 3 1.17 1 0.62 72.02 13 200 6 0.27 0.16 96 1.04 43.23 72.02 171.76 - -
UG

157.54 373.01 - -
KE19

889.98 - - - TOTAL 9,501.87 172.01


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

469.57 - - -
756.35 10,118.39 185.62

420.40 - - -
664.18 8,885.36 158.39

889.98 - - - 1,420.53 9,501.87 172.01


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE20 TRANSMITTAL : 103/STR-TP6/05/2015
KE20

Concrete Cover = 0.04 fc' = 40 0.20 - - - 13.90 8.00 366 5.41 27.80 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE20 KOTAK 1.00 1.00 0.50 0.50 10.50 14.25 3.75 0.10 7.50 4 189 2.91 15.00 - 33 D22 33 22 50 0.28 1.09 4.84 2.98 516.53
LG EXTRA 0
UG KE20 0 KOTAK 1.00 1.00 0.50 0.50 14.25 17.45 3.20 0.10 6.40 4 178 2.50 12.80 - 33 D22 33 22 50 0.28 1.09 4.29 2.98 462.44
UG EXTRA 0

0.20 - - - 13.90 8.00 366 5.41 27.80 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE20 TRANSMITTAL : 103/STR-TP6/05/2015

1,577.53 - 598.55 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.84 - - 1.04 162.45 D13/100/100 13 100 19 100 19 1.08 2 1.08 1 1.04 127.57 13 200 4 0.27 0.16 75 1.04 33.77 - 323.79 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.84 - - 1.04 138.51 D13/100/100 13 100 16 100 16 1.08 2 1.08 1 1.04 107.43 13 200 4 0.27 0.16 64 1.04 28.82 - 274.76 - -
UG

- 598.55 - -
KE20

978.97 - - - TOTAL 8,089.88 142.56


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

516.53 - - -
840.32 8,618.70 153.85

462.44 - - -
737.20 7,561.06 131.28

978.97 - - - 1,577.53 8,089.88 142.56


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE21 TRANSMITTAL : 103/STR-TP6/05/2015
KE21

Concrete Cover = 0.04 fc' = 40 0.10 - - - 10.43 8.00 409 2.74 22.24 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KE21 KOTAK 0.90 0.70 0.50 0.50 10.50 14.25 3.75 0.05 5.63 4 213 1.47 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KE21 0 KOTAK 0.90 0.70 0.50 0.50 14.25 17.45 3.20 0.05 4.80 4 196 1.27 10.24 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.10 - - - 10.43 8.00 409 2.74 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE21 TRANSMITTAL : 103/STR-TP6/05/2015

1,190.94 142.35 336.61 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.04 - - 1.04 130.83 D10/100/100 10 100 19 100 19 0.77 3 0.97 1 0.62 77.28 13 200 6 0.27 0.16 113 1.04 50.66 77.28 181.49 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.04 - - 1.04 111.89 D10/100/100 10 100 16 100 16 0.77 3 0.97 1 0.62 65.08 13 200 6 0.27 0.16 96 1.04 43.23 65.08 155.12 - -
UG

142.35 336.61 - -
KE21

711.98 - - - TOTAL 12,054.10 225.10


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
634.43 12,842.68 242.91

336.32 - - -
556.52 11,265.51 207.29

711.98 - - - 1,190.94 12,054.10 225.10


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT11 TRANSMITTAL : 103/STR-TP6/05/2015
KT11

Concrete Cover = 0.04 fc' = 40 0.11 - - - - - 200.00 4.31 25.87 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT11 KOTAK 0.65 0.65 17.45 22.90 5.45 0.05 - 100 2.36 14.17 - 24 D22 24 22 36 0.28 1.09 6.54 2.98 497.24
1 EXTRA 0
2 KT11 0 KOTAK 0.65 0.65 22.90 27.40 4.50 0.05 - 100 1.96 11.70 - 24 D22 24 22 36 0.28 1.09 5.59 2.98 429.30
2 EXTRA 0

0.11 - - - - - 200.00 4.31 25.87 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT11 TRANSMITTAL : 103/STR-TP6/05/2015

1,388.78 182.13 280.11 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 2.44 - - 1.04 152.72 D10/100/150 10 100 28 150 28 0.72 2 0.72 2 0.62 99.99 99.99 152.72 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 2.44 - - 1.04 127.39 D10/100/150 10 100 23 150 23 0.72 2 0.72 2 0.62 82.14 82.14 127.39 - -
2

182.13 280.11 - -
KT11

926.54 - - - TOTAL 12,642.53 235.50


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

497.24 - - -
749.96 13,654.23 257.99

429.30 - - -
638.82 11,630.84 213.02

926.54 - - - 1,388.78 12,642.53 235.50


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT12 TRANSMITTAL : 103/STR-TP6/05/2015
KT12

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT12 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 6 4 D19 4 19 6 0.24 0.76 0.76 2.23 9.99
2 KT12 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 6 4 D19 4 19 6 0 0.76 0.76 2.23 9.99

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT12 TRANSMITTAL : 103/STR-TP6/05/2015

617.38 72.09 216.46 - 19.98


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 39.58 117.78 - 9.99
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 32.51 98.68 - 9.99
2 - - -

72.09 216.46 - 19.98


KT12

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
333.10
- - - -
143.10 - - -
284.29
- - - -

308.85 - - - 617.38
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT13 TRANSMITTAL : 103/STR-TP6/05/2015
KT13

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT13 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 6 4 D19 4 19 6 0.24 0.76 0.76 2.23 9.99
2 KT13 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 6 4 D19 4 19 6 0 0.76 0.76 2.23 9.99

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT13 TRANSMITTAL : 103/STR-TP6/05/2015

617.38 72.09 216.46 - 19.98


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 39.58 117.78 - 9.99
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 32.51 98.68 - 9.99
2 - - -

72.09 216.46 - 19.98


KT13

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
333.10
- - - -
143.10 - - -
284.29
- - - -

308.85 - - - 617.38
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT23 TRANSMITTAL : 103/STR-TP6/05/2015
KT23

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT23 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 6 4 D19 4 19 6 0.24 0.76 0.76 2.23 9.99
2 KT23 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 6 4 D19 4 19 6 0 0.76 0.76 2.23 9.99

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT23 TRANSMITTAL : 103/STR-TP6/05/2015

617.38 72.09 216.46 - 19.98


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 39.58 117.78 - 9.99
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 32.51 98.68 - 9.99
2 - - -

72.09 216.46 - 19.98


KT23

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
333.10
- - - -
143.10 - - -
284.29
- - - -

308.85 - - - 617.38
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT24 TRANSMITTAL : 103/STR-TP6/05/2015
KT24

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT24 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 6 4 D19 4 19 6 0.24 0.76 0.76 2.23 9.99
2 KT24 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 6 4 D19 4 19 6 0 0.76 0.76 2.23 9.99

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT24 TRANSMITTAL : 103/STR-TP6/05/2015

617.38 72.09 216.46 - 19.98


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 39.58 117.78 - 9.99
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 32.51 98.68 - 9.99
2 - - -

72.09 216.46 - 19.98


KT24

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
333.10
- - - -
143.10 - - -
284.29
- - - -

308.85 - - - 617.38
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT25 TRANSMITTAL : 103/STR-TP6/05/2015
KT25

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT25 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 6 4 D19 4 19 6 0.24 0.76 0.76 2.23 9.99
2 KT25 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 6 4 D19 4 19 6 0 0.76 0.76 2.23 9.99

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT25 TRANSMITTAL : 103/STR-TP6/05/2015

617.38 72.09 216.46 - 19.98


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 39.58 117.78 - 9.99
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 32.51 98.68 - 9.99
2 - - -

72.09 216.46 - 19.98


KT25

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
333.10
- - - -
143.10 - - -
284.29
- - - -

308.85 - - - 617.38
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT14 TRANSMITTAL : 103/STR-TP6/05/2015
KT14

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT14 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 82 1.40 10.90 - 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT14 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 82 1.16 9.00 - 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT14 TRANSMITTAL : 103/STR-TP6/05/2015

823.92 144.19 ### - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 ### - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 ### - -
2

144.19 ### - -
KT14

463.27 - - - TOTAL 12,675.68 306.15


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
445.56 13,709.57 335.38

214.65 - - -
378.36 11,641.80 276.92

463.27 - - - 823.92 12,675.68 306.15


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT15 TRANSMITTAL : 103/STR-TP6/05/2015
KT15

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT15 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 82 1.40 10.90 - 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT15 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 82 1.16 9.00 - 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT15 TRANSMITTAL : 103/STR-TP6/05/2015

823.92 144.19 ### - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 ### - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 ### - -
2

144.19 ### - -
KT15

463.27 - - - TOTAL 12,675.68 306.15


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
445.56 13,709.57 335.38

214.65 - - -
378.36 11,641.80 276.92

463.27 - - - 823.92 12,675.68 306.15


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT17 TRANSMITTAL : 103/STR-TP6/05/2015
KT17

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT17 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 82 1.40 10.90 - 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT17 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 82 1.16 9.00 - 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT17 TRANSMITTAL : 103/STR-TP6/05/2015

823.92 144.19 216.46 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - -
2

144.19 216.46 - -
KT17

463.27 - - - TOTAL 12,675.68 306.15


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
445.56 13,709.57 335.38

214.65 - - -
378.36 11,641.80 276.92

463.27 - - - 823.92 12,675.68 306.15


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT18 TRANSMITTAL : 103/STR-TP6/05/2015
KT18

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 164.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT18 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 82 1.40 10.90 - 12 D22 12 22 18 0.28 1.09 6.54 2.98 248.62
1 EXTRA 0
2 KT18 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 82 1.16 9.00 - 12 D22 12 22 18 0.28 1.09 5.59 2.98 214.65
2 EXTRA 0

0.07 - - - - - 164.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT18 TRANSMITTAL : 103/STR-TP6/05/2015

823.92 144.19 216.46 - -


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - -
2

144.19 216.46 - -
KT18

463.27 - - - TOTAL 12,675.68 306.15


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

248.62 - - -
445.56 13,709.57 335.38

214.65 - - -
378.36 11,641.80 276.92

463.27 - - - 823.92 12,675.68 306.15


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT19 TRANSMITTAL : 103/STR-TP6/05/2015
KT19

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 176.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT19 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 12 8 D19 8 19 12 0.24 0.76 0.76 2.23 19.98
2 KT19 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 12 8 D19 8 19 12 0 0.76 0.76 2.23 19.98

0.07 - - - - - 176.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT19 TRANSMITTAL : 103/STR-TP6/05/2015

709.46 144.19 216.46 - 39.96


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - 19.98
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - 19.98
2 - - -

144.19 216.46 - 39.96


KT19

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
382.67
- - - -
143.10 - - -
326.79
- - - -

308.85 - - - 709.46
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT20 TRANSMITTAL : 103/STR-TP6/05/2015
KT20

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 176.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT20 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 12 8 D19 8 19 12 0.24 0.76 0.76 2.23 19.98
2 KT20 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 12 8 D19 8 19 12 0 0.76 0.76 2.23 19.98

0.07 - - - - - 176.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT20 TRANSMITTAL : 103/STR-TP6/05/2015

709.46 144.19 216.46 - 39.96


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - 19.98
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - 19.98
2 - - -

144.19 216.46 - 39.96


KT20

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
382.67
- - - -
143.10 - - -
326.79
- - - -

308.85 - - - 709.46
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT21 TRANSMITTAL : 103/STR-TP6/05/2015
KT21

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 176.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT21 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 12 8 D19 8 19 12 0.24 0.76 0.76 2.23 19.98
2 KT21 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 12 8 D19 8 19 12 0 0.76 0.76 2.23 19.98

0.07 - - - - - 176.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT21 TRANSMITTAL : 103/STR-TP6/05/2015

709.46 144.19 216.46 - 39.96


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - 19.98
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - 19.98
2 - - -

144.19 216.46 - 39.96


KT21

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
382.67
- - - -
143.10 - - -
326.79
- - - -

308.85 - - - 709.46
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT22 TRANSMITTAL : 103/STR-TP6/05/2015
KT22

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 176.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KT22 KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D22 8 22 12 0.28 1.09 6.54 2.98 165.75
1 EXTRA 0 12 8 D19 8 19 12 0.24 0.76 0.76 2.23 19.98
2 KT22 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 76 1.16 9.00 - 8 D22 8 22 12 0.28 1.09 5.59 2.98 143.10
2 EXTRA 0 12 8 D19 8 19 12 0 0.76 0.76 2.23 19.98

0.07 - - - - - 176.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KT22 TRANSMITTAL : 103/STR-TP6/05/2015

709.46 144.19 216.46 - 39.96


STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/100/150 13 100 28 150 28 64 0.16 1.84 - - 1.04 117.78 D10/100/150 10 100 28 150 28 0.57 2 0.57 2 0.62 79.16 79.16 117.78 - 19.98
1 - - -
2 D13/100/150 13 100 23 150 23 64 0.16 1.84 - - 1.04 98.68 D10/100/150 10 100 23 150 23 0.57 2 0.57 2 0.62 65.03 65.03 98.68 - 19.98
2 - - -

144.19 216.46 - 39.96


KT22

308.85 - - - TOTAL - -
TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

165.75 - - -
382.67
- - - -
143.10 - - -
326.79
- - - -

308.85 - - - 709.46
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE22 TRANSMITTAL : 103/STR-TP6/05/2015
KE22

Concrete Cover = 0.04 fc' = 40 0.02 - - - - 1.00 94 0.73 5.72 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KE22 KOTAK 0.65 0.20 17.45 22.90 5.45 0.02 - 1 94 0.73 5.72 - 10 D22 10 22 15 0.28 1.09 6.54 2.98 207.18
1 EXTRA 0

0.02 - - - - 1.00 94 0.73 5.72 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KE22 TRANSMITTAL : 103/STR-TP6/05/2015

302.39 - 95.20 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/150/150 13 150 19 150 19 43 0.16 1.54 - - 1.04 67.94 D13/150/150 13 150 19 150 19 0.73 - 0.28 1 1.04 10.91 13 450 3 0.27 0.16 36 1.04 16.36 - 95.20 - -
1

- 95.20 - -
KE22

207.18 - - - TOTAL 17,892.85 338.61


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

207.18 - - -
302.39 17,892.85 338.61

207.18 - - - 302.39 17,892.85 338.61


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C32 TRANSMITTAL : 103/STR-TP6/05/2015
C32

Concrete Cover = 0.04 fc' = 40 0.02 - - - - 2.00 67 0.53 3.74 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

2A C32 KOTAK 0.50 0.30 24.00 27.40 3.40 0.02 - 2 67 0.53 3.74 - 6 D22 6 22 9 0.28 1.09 4.49 2.98 87.66
2A EXTRA 0

0.02 - - - - 2.00 67 0.53 3.74 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C32 TRANSMITTAL : 103/STR-TP6/05/2015

151.91 - 64.26 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

2A D13/150/150 13 150 12 150 12 43 0.16 1.44 - - 1.04 43.08 D13/150/150 13 150 12 150 12 0.58 1 0.38 - 1.04 14.38 13 450 2 0.27 0.16 15 1.04 6.80 - 64.26 - -
2A

- 64.26 - -
C32

87.66 - - - TOTAL 7,790.46 191.79


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

87.66 - - -
151.91 7,790.46 191.79

87.66 - - - 151.91 7,790.46 191.79


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C33 TRANSMITTAL : 103/STR-TP6/05/2015
C33

Concrete Cover = 0.04 fc' = 40 0.02 - - - - 2.00 67 0.53 3.74 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

2A C33 KOTAK 0.50 0.30 24.00 27.40 3.40 0.02 - 2 67 0.53 3.74 - 6 D22 6 22 9 0.28 1.09 4.49 2.98 87.66
2A EXTRA 0

0.02 - - - - 2.00 67 0.53 3.74 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C33 TRANSMITTAL : 103/STR-TP6/05/2015

151.91 - 64.26 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

2A D13/150/150 13 150 12 150 12 43 0.16 1.44 - - 1.04 43.08 D13/150/150 13 150 12 150 12 0.58 1 0.38 - 1.04 14.38 13 450 2 0.27 0.16 15 1.04 6.80 - 64.26 - -
2A

- 64.26 - -
C33

87.66 - - - TOTAL 7,790.46 191.79


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

87.66 - - -
151.91 7,790.46 191.79

87.66 - - - 151.91 7,790.46 191.79


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C34 TRANSMITTAL : 103/STR-TP6/05/2015
C34

Concrete Cover = 0.04 fc' = 40 0.02 - - - - 2.00 67 0.53 3.74 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

2A C34 KOTAK 0.50 0.30 24.00 27.40 3.40 0.02 - 2 67 0.53 3.74 - 6 D22 6 22 9 0.28 1.09 4.49 2.98 87.66
2A EXTRA 0

0.02 - - - - 2.00 67 0.53 3.74 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C34 TRANSMITTAL : 103/STR-TP6/05/2015

151.91 - 64.26 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

2A D13/150/150 13 150 12 150 12 43 0.16 1.44 - - 1.04 43.08 D13/150/150 13 150 12 150 12 0.58 1 0.38 - 1.04 14.38 13 450 2 0.27 0.16 15 1.04 6.80 - 64.26 - -
2A

- 64.26 - -
C34

87.66 - - - TOTAL 7,790.46 191.79


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

87.66 - - -
151.91 7,790.46 191.79

87.66 - - - 151.91 7,790.46 191.79


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C22 TRANSMITTAL : 103/STR-TP6/05/2015
C22

Concrete Cover = 0.04 fc' = 40 0.03 - - - - - 182 1.33 10.45 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 C22 KOTAK 0.65 0.20 17.45 22.90 5.45 0.02 - 0 94 0.73 5.72 - 10 D22 10 22 15 0.28 1.09 6.54 2.98 207.18
1 EXTRA 0
2 C22 KOTAK 0.65 0.20 22.90 27.40 4.50 0.02 - 0 88 0.60 4.73 - 10 D22 10 22 15 0.28 1.09 5.59 2.98 178.87
2 EXTRA 0

0.03 - - - - - 182 1.33 10.45 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PEMBESIAN KOLOM (5) AREA TP6 LINK TP3 (REGENCY)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SC-TP3-05
ISSUED : R2 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C22 TRANSMITTAL : 103/STR-TP6/05/2015

558.54 - 172.48 - -
STIRRUPS H / V Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/150/150 13 150 19 150 19 43 0.16 1.54 - - 1.04 67.94 D13/150/150 13 150 19 150 19 0.73 - 0.28 1 1.04 10.91 13 450 3 0.27 0.16 36 1.04 16.36 - 95.20 - -
1
2 D13/150/150 13 150 15 150 15 43 0.16 1.54 - - 1.04 55.16 D13/150/150 13 150 15 150 15 0.73 - 0.28 1 1.04 8.61 13 450 3 0.27 0.16 30 1.04 13.51 - 77.28 - -
2

- 172.48 - -
C22

386.06 - - - TOTAL 16,524.87 309.10


TOTAL REBAR of KOLOM WEIGHT RASIO
22 25 29 32 ALL Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

207.18 - - -
302.39 17,892.85 338.61

178.87 - - -
256.15 15,156.88 279.59

386.06 - - - 558.54 16,524.87 309.10


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K1 TRANSMITTAL : 103/STR-TP6/05/2015
K1

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K1 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K1 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K1 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K1 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K1 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K1

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K2 TRANSMITTAL : 103/STR-TP6/05/2015
K2

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K2 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K2 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K2 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K2 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K2 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K2

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K3 TRANSMITTAL : 103/STR-TP6/05/2015
K3

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K3 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K3 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K3 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K3 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K3 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K3

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K4 TRANSMITTAL : 103/STR-TP6/05/2015
K4

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K4 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K4 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K4 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K4 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K4 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K4

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K5 TRANSMITTAL : 103/STR-TP6/05/2015
K5

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K5 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K5 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K5 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K5 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K5 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K5

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K6 TRANSMITTAL : 103/STR-TP6/05/2015
K6

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K6 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K6 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K6 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K6 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K6 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K6

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K7 TRANSMITTAL : 103/STR-TP6/05/2015
K7

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 88.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K7 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 24 1.11 - 7.07 16 D22 16 22 24 0.28 1.09 4.84 2.98 250.44
LG EXTRA 0
UG K7 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 16 0.95 - 6.03 16 D22 16 22 16 0.28 1.09 4.29 2.98 217.66
UG EXTRA 0
1 K7 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K7 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.19 - - - - - 88.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K7 TRANSMITTAL : 103/STR-TP6/05/2015

- 418.37 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/75/150 13 75 25 150 25 83.83 0.78 7 1.04 92.85 - 92.85 - -


LG
UG D13/75/150 13 75 22 150 22 71.55 0.78 6 1.04 79.25 - 79.25 - -
UG
1 D13/75/150 13 75 37 150 37 121.78 0.78 10 1.04 134.89 - 134.89 - -
1
2 D13/75/150 13 75 30 150 30 100.57 0.78 8 1.04 111.39 - 111.39 - -
2

- 418.37 - -
K7

1,085.79 - - - 1,504.17 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

250.44 - - -
343.29

217.66 - - -
296.91

331.50 - - -
466.38

286.20 - - -
397.59

1,085.79 - - - 1,504.17
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K8 TRANSMITTAL : 103/STR-TP6/05/2015
K8

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 346.00 6.27 50.70 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K8 KOTAK 1.20 0.30 10.50 14.25 3.75 0.05 - 91 1.40 11.25 - 18 D22 18 22 27 0.28 1.09 4.84 2.98 281.74
LG EXTRA 0
UG K8 0 KOTAK 1.20 0.30 14.25 17.45 3.20 0.05 - 82 1.20 9.60 - 18 D22 18 22 18 0.28 1.09 4.29 2.98 244.87
UG EXTRA 0
1 K8 0 KOTAK 1.20 0.30 17.45 22.90 5.45 0.05 - 82 2.01 16.35 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 K8 0 KOTAK 1.20 0.30 22.90 27.40 4.50 0.05 - 91 1.67 13.50 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.19 - - - - - 346.00 6.27 50.70 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K8 TRANSMITTAL : 103/STR-TP6/05/2015

118.37 550.70 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/150 13 100 19 150 19 64 0.16 2.84 - - 1.04 122.93 D10/100/150 10 100 19 150 19 1.27 - 0.37 3 0.62 26.15 26.15 122.93 - -
LG
UG D13/100/150 13 100 16 150 16 64 0.16 2.84 - - 1.04 105.23 D10/100/150 10 100 16 150 16 1.27 - 0.37 3 0.62 22.02 22.02 105.23 - -
UG
1 D13/100/150 13 100 28 150 28 64 0.16 2.84 - - 1.04 176.02 D10/100/150 10 100 28 150 28 1.27 - 0.37 3 0.62 38.54 38.54 176.02 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 2.84 - - 1.04 146.52 D10/100/150 10 100 23 150 23 1.27 - 0.37 3 0.62 31.66 31.66 146.52 - -
2

118.37 550.70 - -
K8

1,214.14 - - - 1,883.21 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

281.74 - - -
430.82

244.87 - - -
372.12

365.56 - - -
580.11

321.97 - - -
500.15

1,214.14 - - - 1,883.21
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K9 TRANSMITTAL : 103/STR-TP6/05/2015
K9

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 346.00 6.27 50.70 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K9 KOTAK 1.20 0.30 10.50 14.25 3.75 0.05 - 91 1.40 11.25 - 18 D22 18 22 27 0.28 1.09 4.84 2.98 281.74
LG EXTRA 0
UG K9 0 KOTAK 1.20 0.30 14.25 17.45 3.20 0.05 - 82 1.20 9.60 - 18 D22 18 22 18 0.28 1.09 4.29 2.98 244.87
UG EXTRA 0
1 K9 0 KOTAK 1.20 0.30 17.45 22.90 5.45 0.05 - 82 2.01 16.35 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 K9 0 KOTAK 1.20 0.30 22.90 27.40 4.50 0.05 - 91 1.67 13.50 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.19 - - - - - 346.00 6.27 50.70 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K9 TRANSMITTAL : 103/STR-TP6/05/2015

118.37 550.70 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/150 13 100 19 150 19 64 0.16 2.84 - - 1.04 122.93 D10/100/150 10 100 19 150 19 1.27 - 0.37 3 0.62 26.15 26.15 122.93 - -
LG
UG D13/100/150 13 100 16 150 16 64 0.16 2.84 - - 1.04 105.23 D10/100/150 10 100 16 150 16 1.27 - 0.37 3 0.62 22.02 22.02 105.23 - -
UG
1 D13/100/150 13 100 28 150 28 64 0.16 2.84 - - 1.04 176.02 D10/100/150 10 100 28 150 28 1.27 - 0.37 3 0.62 38.54 38.54 176.02 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 2.84 - - 1.04 146.52 D10/100/150 10 100 23 150 23 1.27 - 0.37 3 0.62 31.66 31.66 146.52 - -
2

118.37 550.70 - -
K9

1,214.14 - - - 1,883.21 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

281.74 - - -
430.82

244.87 - - -
372.12

365.56 - - -
580.11

321.97 - - -
500.15

1,214.14 - - - 1,883.21
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K10 TRANSMITTAL : 103/STR-TP6/05/2015
K10

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 346.00 6.27 50.70 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K10 KOTAK 1.20 0.30 10.50 14.25 3.75 0.05 - 91 1.40 11.25 - 18 D22 18 22 27 0.28 1.09 4.84 2.98 281.74
LG EXTRA 0
UG K10 0 KOTAK 1.20 0.30 14.25 17.45 3.20 0.05 - 82 1.20 9.60 - 18 D22 18 22 18 0.28 1.09 4.29 2.98 244.87
UG EXTRA 0
1 K10 0 KOTAK 1.20 0.30 17.45 22.90 5.45 0.05 - 82 2.01 16.35 - 18 D22 18 22 18 0.28 1.09 6.54 2.98 365.56
1 EXTRA 0
2 K10 0 KOTAK 1.20 0.30 22.90 27.40 4.50 0.05 - 91 1.67 13.50 - 18 D22 18 22 27 0.28 1.09 5.59 2.98 321.97
2 EXTRA 0

0.19 - - - - - 346.00 6.27 50.70 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K10 TRANSMITTAL : 103/STR-TP6/05/2015

118.37 550.70 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/150 13 100 19 150 19 64 0.16 2.84 - - 1.04 122.93 D10/100/150 10 100 19 150 19 1.27 - 0.37 3 0.62 26.15 26.15 122.93 - -
LG
UG D13/100/150 13 100 16 150 16 64 0.16 2.84 - - 1.04 105.23 D10/100/150 10 100 16 150 16 1.27 - 0.37 3 0.62 22.02 22.02 105.23 - -
UG
1 D13/100/150 13 100 28 150 28 64 0.16 2.84 - - 1.04 176.02 D10/100/150 10 100 28 150 28 1.27 - 0.37 3 0.62 38.54 38.54 176.02 - -
1
2 D13/100/150 13 100 23 150 23 64 0.16 2.84 - - 1.04 146.52 D10/100/150 10 100 23 150 23 1.27 - 0.37 3 0.62 31.66 31.66 146.52 - -
2

118.37 550.70 - -
K10

1,214.14 - - - 1,883.21 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

281.74 - - -
430.82

244.87 - - -
372.12

365.56 - - -
580.11

321.97 - - -
500.15

1,214.14 - - - 1,883.21
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K11 TRANSMITTAL : 103/STR-TP6/05/2015
K11

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 100.00 4.97 - 31.86


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K11 BULAT 0.60 0.60 10.50 14.25 3.75 0.05 - 30 1.11 - 7.07 20 D22 20 22 30 0.28 1.09 4.84 2.98 313.05
LG EXTRA 0
UG K11 0 BULAT 0.60 0.60 14.25 17.45 3.20 0.05 - 20 0.95 - 6.03 20 D22 20 22 20 0.28 1.09 4.29 2.98 272.07
UG EXTRA 0
1 K11 0 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 20 1.59 - 10.27 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 K11 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 30 1.32 - 8.48 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.19 - - - - - 100.00 4.97 - 31.86


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K11 TRANSMITTAL : 103/STR-TP6/05/2015

244.46 - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D10/75/150 10 75 25 150 25 83.33 0.60 7 0.62 54.25 54.25 - - -


LG
UG D10/75/150 10 75 22 150 22 71.12 0.60 6 0.62 46.30 46.30 - - -
UG
1 D10/75/150 10 75 37 150 37 121.07 0.60 10 0.62 78.82 78.82 - - -
1
2 D10/75/150 10 75 30 150 30 99.98 0.60 8 0.62 65.09 65.09 - - -
2

244.46 - - -
K11

1,349.05 - - - 1,593.50 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

313.05 - - -
367.30

272.07 - - -
318.37

406.17 - - -
484.99

357.75 - - -
422.84

1,349.05 - - - 1,593.50
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K12 TRANSMITTAL : 103/STR-TP6/05/2015
K12

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 356.00 6.27 40.56 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K12 KOTAK 0.60 0.60 10.50 14.25 3.75 0.05 - 94 1.40 9.00 - 20 D22 20 22 30 0.28 1.09 4.84 2.98 313.05
LG EXTRA 0
UG K12 0 KOTAK 0.60 0.60 14.25 17.45 3.20 0.05 - 84 1.20 7.68 - 20 D22 20 22 20 0.28 1.09 4.29 2.98 272.07
UG EXTRA 0
1 K12 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 84 2.01 13.08 - 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 K12 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 94 1.67 10.80 - 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.19 - - - - - 356.00 6.27 40.56 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K12 TRANSMITTAL : 103/STR-TP6/05/2015

400.54 - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D10/100/150 10 100 19 150 19 64 0.13 2.23 - - 0.62 57.50 D10/100/150 10 100 19 150 19 0.67 1 0.67 1 0.62 31.57 89.07 - - -
LG
UG D10/100/150 10 100 16 150 16 64 0.13 2.23 - - 0.62 49.20 D10/100/150 10 100 16 150 16 0.67 1 0.67 1 0.62 26.59 75.79 - - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 1 0.67 1 0.62 46.52 128.91 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 1 0.67 1 0.62 38.22 106.78 - - -
2

400.54 - - -
K12

1,349.05 - - - 1,749.59 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

313.05 - - -
402.12

272.07 - - -
347.86

406.17 - - -
535.08

357.75 - - -
464.53

1,349.05 - - - 1,749.59
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K13 TRANSMITTAL : 103/STR-TP6/05/2015
K13

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 356.00 6.27 40.56 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG K13 KOTAK 0.60 0.60 10.50 14.25 3.75 0.05 - 94 1.40 9.00 - 20 D22 20 22 30 0.28 1.09 4.84 2.98 313.05
LG EXTRA 0
UG K13 0 KOTAK 0.60 0.60 14.25 17.45 3.20 0.05 - 84 1.20 7.68 - 20 D22 20 22 20 0.28 1.09 4.29 2.98 272.07
UG EXTRA 0
1 K13 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 84 2.01 13.08 - 20 D22 20 22 20 0.28 1.09 6.54 2.98 406.17
1 EXTRA 0
2 K13 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 94 1.67 10.80 - 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.19 - - - - - 356.00 6.27 40.56 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN K13 TRANSMITTAL : 103/STR-TP6/05/2015

400.54 - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D10/100/150 10 100 19 150 19 64 0.13 2.23 - - 0.62 57.50 D10/100/150 10 100 19 150 19 0.67 1 0.67 1 0.62 31.57 89.07 - - -
LG
UG D10/100/150 10 100 16 150 16 64 0.13 2.23 - - 0.62 49.20 D10/100/150 10 100 16 150 16 0.67 1 0.67 1 0.62 26.59 75.79 - - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 1 0.67 1 0.62 46.52 128.91 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 1 0.67 1 0.62 38.22 106.78 - - -
2

400.54 - - -
K13

1,349.05 - - - 1,749.59 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

313.05 - - -
402.12

272.07 - - -
347.86

406.17 - - -
535.08

357.75 - - -
464.53

1,349.05 - - - 1,749.59
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K14 TRANSMITTAL : 103/STR-TP6/05/2015
K14

Concrete Cover = 0.04 fc' = 40 0.09 - - - - - 48.00 2.91 - 18.76


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 K14 BULAT 0.60 0.60 17.45 22.90 5.45 0.05 - 24 1.59 - 10.27 16 D22 16 22 24 0.28 1.09 6.54 2.98 331.50
1 EXTRA 0
2 K14 0 BULAT 0.60 0.60 22.90 27.40 4.50 0.05 - 24 1.32 - 8.48 16 D22 16 22 24 0.28 1.09 5.59 2.98 286.20
2 EXTRA 0

0.09 - - - - - 48.00 2.91 - 18.76


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K14 TRANSMITTAL : 103/STR-TP6/05/2015

143.91 - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D10/75/150 10 75 37 150 37 121.07 0.60 10 0.62 78.82 78.82 - - -


1
2 D10/75/150 10 75 30 150 30 99.98 0.60 8 0.62 65.09 65.09 - - -
2

143.91 - - -
K14

617.69 - - - 761.60 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

331.50 - - -
410.31

286.20 - - -
351.29

617.69 - - - 761.60
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K15 TRANSMITTAL : 103/STR-TP6/05/2015
K15

Concrete Cover = 0.04 fc' = 40 0.13 - - - - - 60.00 3.96 - 21.88


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 K15 BULAT 0.70 0.70 17.45 22.90 5.45 0.06 - 30 2.16 - 11.99 20 D22 20 22 30 0.28 1.09 6.54 2.98 414.37
1 EXTRA 0
2 K15 0 BULAT 0.70 0.70 22.90 27.40 4.50 0.06 - 30 1.80 - 9.90 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.13 - - - - - 60.00 3.96 - 21.88


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K15 TRANSMITTAL : 103/STR-TP6/05/2015

- 292.44 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/150 13 75 37 150 37 144.61 0.78 12 1.04 160.17 - 160.17 - -


1
2 D13/75/150 13 75 30 150 30 119.42 0.78 10 1.04 132.27 - 132.27 - -
2

- 292.44 - -
K15

772.12 - - - 1,064.56 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

414.37 - - -
574.54

357.75 - - -
490.02

772.12 - - - 1,064.56
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K16 TRANSMITTAL : 103/STR-TP6/05/2015
K16

Concrete Cover = 0.04 fc' = 40 0.13 - - - - - 60.00 3.96 - 21.88


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 K16 BULAT 0.70 0.70 17.45 22.90 5.45 0.06 - 30 2.16 - 11.99 20 D22 20 22 30 0.28 1.09 6.54 2.98 414.37
1 EXTRA 0
2 K16 0 BULAT 0.70 0.70 22.90 27.40 4.50 0.06 - 30 1.80 - 9.90 20 D22 20 22 30 0.28 1.09 5.59 2.98 357.75
2 EXTRA 0

0.13 - - - - - 60.00 3.96 - 21.88


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (1)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03
ISSUED : R3 FOR CONSTRUCTION (28/03/15)
SUB WORK : COLUMN K16 TRANSMITTAL : 103/STR-TP6/05/2015

- ### - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

1 D13/75/150 13 75 37 150 37 144.61 0.78 12 1.04 160.17 - ### - -


1
2 D13/75/150 13 75 30 150 30 119.42 0.78 10 1.04 132.27 - ### - -
2

- ### - -
K16

772.12 - - - 1,064.56 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

414.37 - - -
574.54

357.75 - - -
490.02

772.12 - - - 1,064.56
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C(1) TRANSMITTAL : 103/STR-TP6/05/2015
C(1)

Concrete Cover = 0.04 fc' = 40 0.19 - - - - - 306.00 6.27 40.56 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C(1) KOTAK 0.60 0.60 10.50 14.25 3.75 0.05 - 79 1.40 9.00 - 10 D22 10 22 15 0.28 1.09 4.84 2.98 156.52
LG EXTRA 0
UG C(1) 0 KOTAK 0.60 0.60 14.25 17.45 3.20 0.05 - 74 1.20 7.68 - 10 D22 10 22 10 0.28 1.09 4.29 2.98 136.04
UG EXTRA 0
1 C(1) 0 KOTAK 0.60 0.60 17.45 22.90 5.45 0.05 - 74 2.01 13.08 - 10 D22 10 22 10 0.28 1.09 6.54 2.98 203.09
1 EXTRA 0
2 C(1) 0 KOTAK 0.60 0.60 22.90 27.40 4.50 0.05 - 79 1.67 10.80 - 10 D22 10 22 15 0.28 1.09 5.59 2.98 178.87
2 EXTRA 0

0.19 - - - - - 306.00 6.27 40.56 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (2)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03A
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C(1) TRANSMITTAL : 103/STR-TP6/05/2015

400.54 - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D10/100/150 10 100 19 150 19 64 0.13 2.23 - - 0.62 57.50 D10/100/150 10 100 19 150 19 0.67 1 0.67 1 0.62 31.57 89.07 - - -
LG
UG D10/100/150 10 100 16 150 16 64 0.13 2.23 - - 0.62 49.20 D10/100/150 10 100 16 150 16 0.67 1 0.67 1 0.62 26.59 75.79 - - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.23 - - 0.62 82.39 D10/100/150 10 100 28 150 28 0.67 1 0.67 1 0.62 46.52 128.91 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.23 - - 0.62 68.56 D10/100/150 10 100 23 150 23 0.67 1 0.67 1 0.62 38.22 106.78 - - -
2

400.54 - - -
C(1)

674.52 - - - 1,075.07 - -
TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

156.52 - - -
245.59

136.04 - - -
211.83

203.09 - - -
332.00

178.87 - - -
285.65

674.52 - - - 1,075.07
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(1) TRANSMITTAL : 103/STR-TP6/05/2015
KA(1)

Concrete Cover = 0.04 fc' = 40 0.07 - - - - - 148.00 2.55 19.90 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

1 KA(1) KOTAK 0.50 0.50 17.45 22.90 5.45 0.03 - 76 1.40 10.90 - 8 D25 8 25 12 0.31 1.24 6.69 3.85 220.56
1 EXTRA 0
2 KA(1) 0 KOTAK 0.50 0.50 22.90 27.40 4.50 0.03 - 72 1.16 9.00 - 8 D25 8 25 8 0.31 1.24 5.74 3.85 186.46
2 EXTRA 0

0.07 - - - - - 148.00 2.55 19.90 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(1) TRANSMITTAL : 103/STR-TP6/05/2015

197.74 - - - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOLOM
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19 22
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg] [Kg]

1 D10/100/150 10 100 28 150 28 64 0.13 1.83 - - 0.62 68.50 D10/100/150 10 100 28 150 28 0.57 1 0.57 1 0.62 39.58 108.08 - - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 1.83 - - 0.62 57.15 D10/100/150 10 100 23 150 23 0.57 1 0.57 1 0.62 32.51 89.66 - - - -
2

197.74 - - - -
KA(1)

407.02 - - 604.76 - -
TOTAL REBAR of KOLOM TOTAL RASIO
25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

220.56 - -
328.64

186.46 - -
276.13

407.02 - - 604.76
PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(2) TRANSMITTAL : 103/STR-TP6/05/2015
KA(2)

Concrete Cover = 0.04 fc' = 40 0.27 - - - 13.90 8.00 475.00 9.04 52.88 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KA(2) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 163 2.17 13.50 - 16 D25 16 25 24 0.31 1.24 4.99 3.85 336.40
LG EXTRA 0
UG KA(2) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 144 1.86 11.52 - 16 D25 16 25 16 0.31 1.24 4.44 3.85 292.85
UG EXTRA 0
1 KA(2) 0 KOTAK 0.70 0.70 17.45 22.90 5.45 0.06 - 80 2.73 15.26 - 16 D25 16 25 16 0.31 1.24 6.69 3.85 431.45
1 EXTRA 0
2 KA(2) 0 KOTAK 0.70 0.70 22.90 27.40 4.50 0.06 - 88 2.27 12.60 - 16 D25 16 25 24 0.31 1.24 5.74 3.85 382.60
2 EXTRA 0

0.27 - - - 13.90 8.00 475 9.04 52.88 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(2) TRANSMITTAL : 103/STR-TP6/05/2015

371.02 478.87 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.50 4 1.04 78.41 13 200 4 0.27 0.16 75 1.04 33.77 - 258.82 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.50 4 1.04 66.03 13 200 4 0.27 0.16 64 1.04 28.82 - 220.05 - -
UG
1 D10/100/150 10 100 28 150 28 64 0.13 2.63 - - 0.62 96.27 D10/100/150 10 100 28 150 28 0.77 2 0.77 2 0.62 106.94 203.21 - - -
1
2 D10/100/150 10 100 23 150 23 64 0.13 2.63 - - 0.62 79.97 D10/100/150 10 100 23 150 23 0.77 2 0.77 2 0.62 87.84 167.81 - - -
2

371.02 478.87 - -
KA(2)

- 1,443.29 - - 2,293.18 8,456.29 195.26


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- 336.40 - -
595.22 8,176.09 185.44

- 292.85 - -
512.89 7,045.24 158.24

- 431.45 - -
634.66 9,963.23 239.56

- 382.60 - -
550.41 8,640.61 197.80

- 1,443.29 - - 2,293.18 8,456.29 195.26


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(2) TRANSMITTAL : 103/STR-TP6/05/2015
KA(2)

Concrete Cover = 0.04 fc' = 40 0.17 - - - - - 200.00 4.61 22.24 -


Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KA(2) KOTAK 0.80 0.80 10.50 14.25 3.75 0.08 - 100 2.48 12.00 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KA(2) 0 KOTAK 0.80 0.80 14.25 17.45 3.20 0.08 - 100 2.13 10.24 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.17 - - - - - 200 4.61 22.24 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KA(2) TRANSMITTAL : 103/STR-TP6/05/2015

- 497.81 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/150 13 100 19 150 19 64 0.16 3.04 - - 1.04 130.83 D13/100/100 13 100 19 100 19 0.88 2 0.88 2 1.04 138.48 - 269.31 - -
LG
UG D13/100/150 13 100 16 150 16 64 0.16 3.04 - - 1.04 111.89 D13/100/100 13 100 16 100 16 0.88 2 0.88 2 1.04 116.61 - 228.50 - -
UG

- 497.81 - -
KA(2)

711.98 - - - 1,209.79 7,270.39 133.65


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
644.97 7,752.03 144.23

336.32 - - -
564.82 6,788.74 123.08

711.98 - - - 1,209.79 7,270.39 133.65


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(2) TRANSMITTAL : 103/STR-TP6/05/2015
KB(2)

Concrete Cover = 0.04 fc' = 40 0.17 - - - 10.43 8.00 382.50 4.83 27.11 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KB(2) KOTAK 1.15 0.80 0.50 0.50 10.50 14.25 3.75 0.09 5.63 4 200 2.60 14.63 - 26 D25 26 25 39 0.31 1.24 4.99 3.85 546.65
LG EXTRA 0
UG KB(2) 0 KOTAK 1.15 0.80 0.50 0.50 14.25 17.45 3.20 0.09 4.80 4 183 2.23 12.48 - 26 D25 26 25 39 0.31 1.24 4.44 3.85 491.59
UG EXTRA 0

0.17 - - - 10.43 8.00 382.50 4.83 27.11 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(2) TRANSMITTAL : 103/STR-TP6/05/2015

143.65 382.15 -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR o
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 48 0.16 3.74 - - 1.04 155.78 D10/100/100 10 100 19 100 19 1.22 2 0.87 1 0.62 77.98 13 200 6 0.27 0.16 113 1.04 50.66 77.98 206.44 -
LG
UG D13/100/100 13 100 16 100 16 48 0.16 3.74 - - 1.04 132.47 D10/100/100 10 100 16 100 16 1.22 2 0.87 1 0.62 65.67 13 200 6 0.27 0.16 96 1.04 43.23 65.67 175.70 -
UG

143.65 382.15 -
KB(2)

- - 1,038.24 - - 1,564.04 8,978.40 155.60


TOTAL REBAR of KOLOM TOTAL RASIO
19 22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- - 546.65 - -
831.07 9,541.61 167.91

- - 491.59 - -
732.96 8,415.19 143.28

- - 1,038.24 - - 1,564.04 8,978.40 155.60


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(3) TRANSMITTAL : 103/STR-TP6/05/2015
KB(3)

Concrete Cover = 0.04 fc' = 40 0.20 - - - 13.90 8.00 502.00 5.41 27.80 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KB(3) KOTAK 1.00 1.00 0.50 0.50 10.50 14.25 3.75 0.10 7.50 4 262 2.91 15.00 - 32 D25 32 25 48 0.31 1.24 4.99 3.85 672.80
LG EXTRA 0
UG KB(3) 0 KOTAK 1.00 1.00 0.50 0.50 14.25 17.45 3.20 0.10 6.40 4 240 2.50 12.80 - 32 D25 32 25 48 0.31 1.24 4.44 3.85 605.04
UG EXTRA 0

0.20 - - - 13.90 8.00 502 5.41 27.80 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(3) TRANSMITTAL : 103/STR-TP6/05/2015

- 593.88 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.84 - - 1.04 162.45 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 8 0.27 0.16 150 1.04 67.55 - 321.05 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.84 - - 1.04 138.51 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 8 0.27 0.16 128 1.04 57.64 - 272.83 - -
UG

- 593.88 - -
KB(3)

- 1,277.83 - - 1,871.71 9,598.51 142.56


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- 672.80 - -
993.85 10,193.28 153.85

- 605.04 - -
877.86 9,003.74 131.28

- 1,277.83 - - 1,871.71 9,598.51 142.56


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(4) TRANSMITTAL : 103/STR-TP6/05/2015
KB(4)

Concrete Cover = 0.04 fc' = 40 0.17 - - - 13.90 8.00 490.00 4.69 26.41 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KB(4) KOTAK 1.00 0.90 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 256 2.52 14.25 - 28 D25 28 25 42 0.31 1.24 4.99 3.85 588.70
LG EXTRA 0
UG KB(4) 0 KOTAK 1.00 0.90 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 234 2.16 12.16 - 28 D25 28 25 42 0.31 1.24 4.44 3.85 529.41
UG EXTRA 0

0.17 - - - 13.90 8.00 490 4.69 26.41 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(4) TRANSMITTAL : 103/STR-TP6/05/2015

- 579.32 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KO
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 8 0.27 0.16 150 1.04 67.55 - 313.15 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 8 0.27 0.16 128 1.04 57.64 - 266.17 - -
UG

- 579.32 - -
KB(4)

- 1,118.10 - - 1,697.42 10,043.91 156.27


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

- 588.70 - -
901.84 10,672.68 168.64

- 529.41 - -
795.58 9,415.14 143.91

- 1,118.10 - - 1,697.42 10,043.91 156.27


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(5) TRANSMITTAL : 103/STR-TP6/05/2015
KB(5)

Concrete Cover = 0.04 fc' = 40 0.17 - - - 13.90 8.00 490.00 4.69 26.41 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KB(5) KOTAK 1.00 0.90 0.50 0.50 10.50 14.25 3.75 0.08 7.50 4 256 2.52 14.25 - 28 D22 28 22 42 0.28 1.09 4.84 2.98 438.27
LG EXTRA 0
UG KB(5) 0 KOTAK 1.00 0.90 0.50 0.50 14.25 17.45 3.20 0.08 6.40 4 234 2.16 12.16 - 28 D22 28 22 42 0.28 1.09 4.29 2.98 392.38
UG EXTRA 0

0.17 - - - 13.90 8.00 490 4.69 26.41 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KB(5) TRANSMITTAL : 103/STR-TP6/05/2015

- 579.32 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.64 - - 1.04 154.54 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 8 0.27 0.16 150 1.04 67.55 - 313.15 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.64 - - 1.04 131.86 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 8 0.27 0.16 128 1.04 57.64 - 266.17 - -
UG

- 579.32 - -
KB(5)

830.65 - - - 1,409.96 8,342.99 156.27


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

438.27 - - -
751.41 8,892.48 168.64

392.38 - - -
658.55 7,793.49 143.91

830.65 - - - 1,409.96 8,342.99 156.27


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(5) TRANSMITTAL : 103/STR-TP6/05/2015
KC(5)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(5) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(5) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(5) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(5)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(1) TRANSMITTAL : 103/STR-TP6/05/2015
KC(1)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(1) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(1) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(1) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(1)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(2) TRANSMITTAL : 103/STR-TP6/05/2015
KC(2)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(2) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(2) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(2) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(2)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(3) TRANSMITTAL : 103/STR-TP6/05/2015
KC(3)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(3) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(3) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(3) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(3)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(4) TRANSMITTAL : 103/STR-TP6/05/2015
KC(4)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(4) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(4) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(4) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(4)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(6) TRANSMITTAL : 103/STR-TP6/05/2015
KC(6)

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG KC(6) KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG KC(6) 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN KC(6) TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
KC(6)

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C77 TRANSMITTAL : 103/STR-TP6/05/2015
C77

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C77 KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG C77 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C77 TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
C77

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C78 TRANSMITTAL : 103/STR-TP6/05/2015
C78

Concrete Cover = 0.04 fc' = 40 0.15 - - - 13.90 8.00 339.00 4.04 25.02 -
Shape of New Column Existing Elevasi Demolish Cut of Chemical Concrete Formwork MAIN REBAR of KOLOM
Height Chipping
Floor Type Gridline Column wide thick wide thick Floor Upper Slab Beam Column B.Wall C.Guard HILTI Fc'40 Kotak Bulat Qty Ø Chemical S5 Length Weight
Rebar
[m] [m] [m] [m] [m] [m] [m] [m3] [m3] [m3] [m2] [m2] [nos] [nos] [m3] [m2] [m2] [bh] [mm] [nos] [m] [m] [m] Kg/m Total

LG C78 KOTAK 0.90 0.90 0.50 0.50 10.50 14.25 3.75 0.07 7.50 4 175 2.17 13.50 - 24 D22 24 22 36 0.28 1.09 4.84 2.98 375.66
LG EXTRA 0
UG C78 0 KOTAK 0.90 0.90 0.50 0.50 14.25 17.45 3.20 0.07 6.40 4 164 1.86 11.52 - 24 D22 24 22 36 0.28 1.09 4.29 2.98 336.32
UG EXTRA 0

0.15 - - - 13.90 8.00 339 4.04 25.02 -


PROJECT : TUNJUNGAN PLAZA 6 BASED ON DRAWING : PERKUATAN STRUKTUR AREA SHERATON (3)
WORK : STRENGTHENING COLUMN LINK TO TP-3 DRAWING NUMBER : SM-M-03B
ISSUED : R6 FOR CONSTRUCTION (23/05/15)
SUB WORK : COLUMN C78 TRANSMITTAL : 103/STR-TP6/05/2015

- 502.17 - -
STIRRUPS Short / Long Ties Angkur Ties TOTAL REBAR of KOL
Floor REBAR End Space Centre Space Chemical Lap Splice Weight REBAR End Centre Length Weight Rebar Length Hilti Weight 10 13 16 19
Length
Type Ø Spaces Qty Spaces Qty [nos] [m] S5 Qty Kg/m Total Type Ø Spaces Qty Spaces Qty Short Qty Long Qty Kg/m Total Ø Space Qty [m] [m] Qty Kg/m Total [Kg] [Kg] [Kg] [Kg]

LG D13/100/100 13 100 19 100 19 64 0.16 3.44 - - 1.04 146.64 D13/100/100 13 100 19 100 19 0.58 4 1.04 91.05 13 200 4 0.27 0.16 75 1.04 33.77 - 271.47 - -
LG
UG D13/100/100 13 100 16 100 16 64 0.16 3.44 - - 1.04 125.20 D13/100/100 13 100 16 100 16 0.58 4 1.04 76.68 13 200 4 0.27 0.16 64 1.04 28.82 - 230.70 - -
UG

- 502.17 - -
C78

711.98 - - - 1,214.15 8,338.92 171.84


TOTAL REBAR of KOLOM TOTAL RASIO
22 25 29 32 WEIGHT Rebar Formwork
[Kg] [Kg] [Kg] [Kg] [Kg] Kg/m3 m2/m3

375.66 - - -
647.13 8,889.11 185.44

336.32 - - -
567.02 7,788.73 158.24

711.98 - - - 1,214.15 8,338.92 171.84


PROJECT : TUNJUNGAN PLAZA 6 LINK TO TP-3
WORK : COLUMN STRENGTHENING SHERATON
BASED ON DRAWING :
DRAWING NUMBER :
ISSUED :
TRANSMITTAL : 103/STR-TP6/05/2015

Recapitulation of Column Strengthening Sheraton Work -


1 2 3 4 5 6 8 9 10 57 58 59 60 61 62 63 64
Formwork Ukuran Luas Volume
No. COLUMN Tinggi Luas lama Bekisting Chipping Chemical
Bulat|Kotak Sisi lama Sisi baru (P) Sisi Baru (L) Baru Eksisting Baru Kebutuhan
[mm] [mm] [mm] [m] [m2] [m2] [m3] [m3] [m3] [m2] [m2]

1 TP3 C45 LG Kotak 500.00 800.00 800.00 3.75 25 64 93.75 240.00 146.25 120.00 1,607.50
2 TP3 C44 LG Kotak 500.00 800.00 900.00 3.75 25 72 93.75 270.00 176.25 127.50 1,807.50
3 TP3 C43 LG Kotak 500.00 900.00 900.00 3.75 25 81 93.75 303.75 210.00 135.00 1,807.50
4 TP3 C58 LG Kotak 500.00 500.00 1,000.00 3.75 25 50 93.75 187.50 93.75 112.50 2,007.50
5 TP3 C57 LG Kotak 500.00 700.00 900.00 3.75 25 63 93.75 236.25 142.50 120.00 1,807.50
6 TP3 C56 LG Kotak 500.00 900.00 900.00 3.75 25 81 93.75 303.75 210.00 135.00 1,807.50
7 TP3 C55 LG Kotak 500.00 900.00 1,000.00 3.75 25 90 93.75 337.50 243.75 142.50 2,007.50
8 TP3 C54 LG Kotak 500.00 900.00 1,000.00 3.75 25 90 93.75 337.50 243.75 142.50 2,007.50
9 TP3 C95 LG Kotak 500.00 900.00 800.00 3.75 25 72 93.75 270.00 176.25 127.50 1,607.50
10 TP3 C94 LG Kotak 500.00 1,000.00 1,000.00 3.75 25 100 93.75 375.00 281.25 150.00 2,007.50
11 TP3 C76 LG Kotak 500.00 1,000.00 1,000.00 3.75 25 100 93.75 375.00 281.25 150.00 2,007.50
12 TP3 C98 LG Kotak 500.00 800.00 800.00 3.75 25 64 93.75 240.00 146.25 120.00 1,607.50
13 TP3 C97 LG Kotak 500.00 800.00 900.00 3.75 25 72 93.75 270.00 176.25 127.50 1,807.50
15 TP3 KE1 LG Kotak 500.00 900.00 900.00 3.75 25 81 93.75 303.75 210.00 135.00 1,807.50
16 TP3 KE2 LG Kotak 500.00 900.00 900.00 3.75 25 81 93.75 303.75 210.00 135.00 1,807.50
17 TP3 KE3 LG Kotak 500.00 900.00 700.00 3.75 25 63 93.75 236.25 142.50 120.00 1,407.50
18 TP3 KE4 LG Kotak 500.00 900.00 700.00 3.75 25 63 93.75 236.25 142.50 120.00 1,407.50
19 TP3 KT6 LG Bulat - 500.00 - 3.75 0 20 - 73.66 73.66 58.93 7.50
20 TP3 KT7 LG Bulat - 500.00 - 3.75 0 20 - 73.66 73.66 58.93 7.50
21 TP3 KE5 LG Kotak 500.00 500.00 1,000.00 3.75 25 50 93.75 187.50 93.75 112.50 2,007.50
22 TP3 KE6 LG Kotak 500.00 700.00 900.00 3.75 25 63 93.75 236.25 142.50 120.00 1,807.50
23 TP3 KE7 LG Kotak 500.00 700.00 900.00 3.75 25 63 93.75 236.25 142.50 120.00 1,807.50
24 TP3 KE8 LG Kotak 500.00 900.00 800.00 3.75 25 72 93.75 270.00 176.25 127.50 1,607.50
25 TP3 KE9 LG Kotak 500.00 800.00 800.00 3.75 25 64 93.75 240.00 146.25 120.00 1,607.50
26 TP3 KE10 LG Kotak 500.00 800.00 800.00 3.75 25 64 93.75 240.00 146.25 120.00 1,607.50
27 TP3 KE11 LG Kotak 500.00 900.00 800.00 3.75 25 72 93.75 270.00 176.25 127.50 1,607.50
28 TP3 KE13 LG Kotak 500.00 900.00 900.00 3.75 25 81 93.75 303.75 210.00 135.00 1,807.50
29 TP3 KE12 LG Kotak 500.00 1,100.00 800.00 3.75 25 88 93.75 330.00 236.25 142.50 1,607.50
30 TP3 KE14 LG Kotak 500.00 1,150.00 750.00 3.75 25 86 93.75 323.44 229.69 142.50 1,507.50
31 TP3 KE15 LG Kotak 500.00 1,000.00 750.00 3.75 25 75 93.75 281.25 187.50 131.25 1,507.50
32 TP3 KE16 LG Kotak 500.00 1,000.00 900.00 3.75 25 90 93.75 337.50 243.75 142.50 1,807.50
33 TP3 KE17 LG Kotak 500.00 1,100.00 750.00 3.75 25 83 93.75 309.38 215.63 138.75 1,507.50
34 TP3 KE18 LG Kotak 500.00 1,050.00 900.00 3.75 25 95 93.75 354.38 260.63 146.25 1,807.50
35 TP3 KE19 LG Kotak 500.00 1,100.00 750.00 3.75 25 83 93.75 309.38 215.63 138.75 1,507.50
36 TP3 KE20 LG Kotak 500.00 1,000.00 900.00 3.75 25 90 93.75 337.50 243.75 142.50 1,807.50
37 TP3 KE21 LG Kotak 500.00 900.00 700.00 3.75 25 63 93.75 236.25 142.50 120.00 1,407.50
39 TP3 KE22 LG Kotak 500.00 70.00 70.00 3.75 25 0 93.75 1.84 (91.91) 10.50 147.50

Total : 11.04 17,500.00 31,179.94 ### 932.65 1100 2,948.26 5,024.32 10,288.95 109,565.15 15,080.03 84,457.86

Checked and approved by :


PT. Pakuwon Jati Tbk PT. Rider Levett Bucknall

( M. Zuhel ) ( Benyamin Yuniarto )


QSM Sr. Quantity Surveyor
65 69 70 71 72 73 74 75 76

You might also like