You are on page 1of 13

#REF!

Measurement Sheet
D : 17/11/2018
Sr.No Description Unit No L B H

1.00 Earth Work


1.01 Box cutting the road surface to proper slope and camber for making a base for road work
including removing the excavated stuff and depositing on the road side slope as directed
upto 50Mt.lead.

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.20


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.20
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.20
Cu.mt

1.02 Add extra over item 9 for conveying and utilising the stuff in bank from end of cutting with
all required lead and lift.(C) Above 400 Meters upto 500 Meters

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.20


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.20
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.20
Cu.mt

2.00 Rubble Stone and WBM Work


2.01 Suppliying of Rubble stone aggregate of following sizes (for W.B.M. Road)(2) Machine
broken stone aggregate 100mm size.

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.30


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.30
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.30
Cu.mt

2.02 Spreading the Rubble stone for rolling and W.B.M. including filling the interstices to
required camber and gradient (ii)230 mm size (H.B.)

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.30


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.30
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.30
Cu.mt
2.03 Suppliying of graded stone aggregate of following sizes (for W.B.M. Road)(2) Machine
broken stone aggregate 100mm size.

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.15


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.15
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.15
Cu.mt
2.04 Spreading the stone aggregate for rolling and W.B.M. including filling the interstices to
required camber and gradient (ii) 100mm size aggreagates (H.B.)

Type A (18.00 mtr Wide) Cu.mt 1 950.00 18.30 0.15


Type B (12.00 mtr Wide) Cu.mt 1 700.00 12.30 0.15
Type C (9.00 mtr Wide) Cu.mt 1 185.00 9.30 0.15
Cu.mt

2.05 Rolling and consolidating water bound macadam (except laterite and Kankar) including
watering not exceeding 150mm thickness (Main layer including binding materials )
including filling in depressions which occur during the process.(A) With power roller
exceeding 8 tonne and not exceeding 12 tonne.

Type A (18.00 mtr Wide) Sq.mt 1 950.00 18.30


Type B (12.00 mtr Wide) Sq.mt 1 700.00 12.30
Type C (9.00 mtr Wide) Sq.mt 1 185.00 9.30
Sq.mt
Qty

a base for road work


de slope as directed

3477.00
1722.00
344.10
5543.10

m end of cutting with

3477.00
1722.00
344.10
5543.10

oad)(2) Machine

5215.50
2583.00
516.15
8314.65

he interstices to

5215.50
2583.00
516.15
8314.65
oad)(2) Machine

2607.75
1291.50
258.08
4157.33
the interstices to

2607.75
1291.50
258.08
4157.33

d Kankar) including
ing materials )
With power roller

17385.00
8610.00
1720.50
27715.50
Project :- Proposed WBM Road

Abstract Sheet

Sr.No Description Unit Qty Rate

1.00 Earth Work

1.01 Box cutting the road surface to proper slope and Cu.mt 5543.10 198.03
camber for making a base for road work including
removing the excavated stuff and depositing on
the road side slope as directed upto 50Mt.lead.

Labour Cess 1% Cu.mt 5543.10 1.98

1.02 Add extra over item 9 for conveying and utilising Cu.mt 5543.10 148.93
the stuff in bank from end of cutting with all
required lead and lift.(C) Above 400 Meters upto
500 Meters

Labour Cess 1% Cu.mt 5543.10 1.49

2.00 Rubble Stone and WBM Work


2.01 Suppliying of Rubble stone of following sizes Cu.mt 8314.65 246.23
230mm thick.

Labour Cess 1% Cu.mt 8314.65 2.46

2.02 Spreading and Rolling the Rubble stone for Cu.mt 8314.65 255.50
W.B.M. including filling the interstices to required
camber and gradient (ii)230 mm size (H.B.)

Labour Cess 1% Cu.mt 8314.65 2.56

2.03 Suppliying of graded stone aggregate of following Cu.mt 4157.33 328.40


sizes (for W.B.M. Road)(2) Machine broken stone
aggregate 100mm size.

Labour Cess 1% Cu.mt 4157.33 3.28


2.04 Spreading and Rolling the stone aggregate for Cu.mt 4157.33 235.19
W.B.M. including filling the interstices to required
camber and gradient (ii) 100mm Size

Labour Cess 1% Cu.mt 4157.33 2.35


2.05 Rolling and consolidating water bound macadam Sq.mt 27715.50 15.94
(except laterite and Kankar) including watering
not exceeding 150mm thickness (Main layer
including binding materials ) including filling in
depressions which occur during the process.(A)
With power roller exceeding 8 tonne and not
exceeding 12 tonne.

Labour Cess 1% Sq.mt 27715.50 0.16


Total
Contigency 5%
Total Amount
Grand Total
Say

In Words : - Ninety Four Lacs Seventeen Thousand Fifty only.

Note:- Total Amount Does Not include Any Taxes.


Amount

1,097,700.09

10,977.00

825,533.88

8,255.34

2,047,341.21

20,473.41

2,124,393.08

21,243.93

1,365,265.53

13,652.66
977,761.27

9,777.61
441,785.07

4,417.85
8,968,577.93
448,428.90
9,417,006.83
9,417,006.83
9,417,050.00