Professional Documents
Culture Documents
Execution of A Cement Project From A-Z
Execution of A Cement Project From A-Z
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
• Positions in FLSmidth:
– VP, Head of Project Division EMEA/APAC
– VP, Head of Project Division 1
– General Manger, FLSmidth China
– Chief Representative Thailand
– Ass. Site manager, 10,000 tpd project, Thailand
– Project Sales
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
40
20
2009E
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Capital Market Day 2009 7
Long term trends
160
20
0
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Capital Market Day 2009 9
Long term trends
6000
Average plant clinker capacity (t/d)
5000
4000
3000
2000
1000
60
Rapid increase in
alternative fuel
50
usage during the
40
past 5 years
- due to focus
30
on lowering
production costs in
20
a cement market
10
with excess
production
0 capacity
1999 2000 2001 2002 2003 2004 2005
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Customer
Customer FLSmidth
FLSmidth strengths
strengths
requirements
requirements and
and capabilities
capabilities
Feasibility study
Proposal stage and signing of contract
Design and order handling stage
Civil design and construction
Erection, start-up,
Commissioning, handover, guarantees
Production, operation and maintenance of the
plant
Market
Market size,
size, cement
cement prices,
prices, Budget
Budget proposals
proposals
investment
investment costs
costs ?? for
for various
various sizes
sizes
? ?
Basic
plant
Adapted
plant
Taylor
made
Raw
Raw material
material FLSmidth
FLSmidth tests
tests the
the
samples
samples to
to FLSmidth
FLSmidth raw
raw materials
materials
Optimal
Optimal process
process and
and Advanced
Advanced process
process design
design
low
low production
production cost
cost
Can
Can we
we get
get the
the complete
complete FLSmidth
FLSmidth has has equipment
equipment
package
package from
from FLSmidth
FLSmidth ?? for
for the
the entire
entire proces
proces
Local
Local supply
supply and
and FLSmidth
FLSmidth offers
offers split-supply
split-supply
manufacturing
manufacturing
4
18
40% imported
7
6
60% local manufactured
1
5
2
12
What
What are
are the
the total
total cost?
cost? Typical
Typical cost
cost composition
composition
Buildings
30%
Erection
15%
Transport
5%
Supervision
Machinery 5%
Others
40% 5%
Equipment,
Equipment, civil
civil design
design Different
Different options
options are
are
or
or turnkey?
turnkey? possible
possible
Equipment Construction
Visualisation
Visualisation to
to 3D
3D layouts
layouts and
and models
models
customer
customer
3D
3D layouts
layouts incorporated
incorporated
Visualisation
Visualisation to
to authorities
authorities in
in actual
actual landscape
landscape
Signing
Signing the
the contract
contract Quick
Quick order
order start
start
Safe
Safe order
order handling
handling AA strong
strong project
project team
team
Security
Security in
in aa Company
Company sizesize and
and
changing
changing world
world strengths
strengths in
in market
market
Buying
power
Supply chain
Customer FLSmidth
Close
Close contact
contact to
to the
the World
World wide
wide design
design
supplier
supplier
Integrated
Integrated technical
technical
Fast
Fast civil
civil design
design and
and civil
civil design
design
Close
Close co-operation
co-operation with
with
High
High quality
quality equipment
equipment large
large workshops
workshops
Odd-size
Odd-size equipment
equipment
Safe
Safe transport
transport or
or in
in containers
containers
Swift
Swift and
and trouble
trouble free
free con-
con- Experienced
Experienced and
and
struction
struction and
and installation
installation skilled
skilled supervisors
supervisors
FLSmidth
FLSmidth Institute
Institute
Training
Training of
of staff
staff -- good
good training
training programme
programme
FLSmidth
FLSmidth has
has aa good
good record
record
AA swift
swift start
start of
of the
the plant
plant for
for reaching
reaching all
all guarantees
guarantees
FLSmidth
AA safe
safe and
and economical
economical FLSmidth
FLSmidth offers
offers full
full
operation
operation ofof the
the plant
plant operation
operation and
and maintenance
maintenance
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Manufacture
80%
70%
Procurement
60%
Engineering
Contract
50%
40%
Letter of Credit
30%
0%
-10%
d
rd
st
nd
h
h
t
th
th
th
th
th
th
th
th
th
th
th
d
)
th
th
th
th
th
th
1s
AC
2n
6t
4t
5t
7t
8t
9t
3r
21
12
20
23
25
28
10
11
13
14
15
16
17
18
19
24
26
27
30 29
22
(P
th
Period of execution
Manufacture
80%
70%
Procurement
60%
Engineering
Contract
50%
40%
Letter of Credit
30%
0%
-10%
d
rd
st
nd
h
h
t
th
th
th
th
th
th
th
th
th
th
th
d
)
th
th
th
th
th
th
1s
AC
2n
6t
4t
5t
7t
8t
9t
3r
21
12
20
23
25
28
10
11
13
14
15
16
17
18
19
24
26
27
30 29
22
(P
th
Period of execution
100%
90%
80%
70%
60%
50%
Contract
40%
30%
20%
10%
0%
rd
nd
t
th
th
th
th
th
th
th
th
th
th
th
th
d
)
th
st
th
th
th
th
st
h
h
1s
AC
3r
2n
4t
5t
6t
7t
8t
9t
10
11
12
23
28
30 2 9
13
14
15
16
17
18
19
20
21
24
25
26
27
31
-10%
22
(P
th
-20%
Period of Execution
Client payments Total Project Cost Payments SG&A payments Net Cash
Capital Market Day 2009 46
What happens when orders are cancelled or put on hold?
“Cancelled”
– Initiated work and issue of purchase orders stop
– Legal department gets involved
– We stick to our contractual rights - no matter
which client
– We have the right to be compensated for
incurred and committed costs and as well as a
pro-rata contribution margin
– Cancellation fee to be claimed
“Put on hold”
– Initiated work and issue of purchase orders stop
– Contract and time schedule is amended
– We preserve the right to be compensated for
any additional costs
– Some clients are constrained on cash, others are
adjusting priorities
We are in very close contact with the customers and they are
all determined to carry on – but limited by financing
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Filter Filter
Crusher
Analyzer
Limestone Clay Sand Iron
1 2 3 4 Raw meal
silo
Storage
Coal mill
1
2 Grate
4 3 cooler
Raw mill
Clinker
Silo
Separator
Packers
2 3
Cement Cement
silo silo
Cement
silo
Cement mill
Gear unit Ship unloading
Roller press
Ship loading
ILC preheater
ATOX mills
DUOFLEX burner
OK mills
3-support kiln
MMC Cooler
Platin Lappeenranta
4000 tpd 1800 tpd
Ash Grove, Moapa Cem. Andorra
4350Grove
Ash tpd Essroc,
foreman Martinsburg 2350 tpd Ozarow 2
4200 tpd 5000 tpd Keystone, Bath Marquesado 7000 tpdHolcim
Ivano-Frankivsk
Ste. Genevieve3000 tpd 3300 tpdMolins 2300
tpdtpd
LSR KarcementKursk Hoang Thach 3
Slantsy
4100 tpd Jovein
5500 Akbulak tpd 3500 tpd3300 tpd
3200 Podgorensky
12000 tpdLafarge Joppa Cimsa Eskisehir
5000tpd
3900 tpd
6000 tpd
7200 tpd CIBA (Orascom) Aleppo Madras
JP Kutch Cement
6000 tpd
Rio Grande Pueblo Ait Baha 2100 tpd
Abyek Cement 7600 tpd Kokshe Cement Ha Long
3000 tpd 1500 tpd Grey 7500Khuzestan,
CIBA tpd Gulf Cement 10000 tpd
Ramhormoz 5500 tpd
5000 tpd
Sinai White 2 24500
Arabian tpd
CC,5500
Ramliya 5500 tpd
6250AUCC
tpd tpd5000
Volyn tpd
ABG Kutch
Tepeaca 1300 tpd6000
Sinai, Gabal
5000 tpdLebni 2ACC,
tpd Star Rabigh
Cement Sanghi, Kutch
4200 tpd 6000 tpd ACC
10000 tpd Chanda
10000 tpd Adilabad
10000 tpd 7000
6500 tpd Orient,
Ain Soukna 7000 Dalmia
EMCC (Orascom) 4000 tpdtpd
Carribean Cement 3x4500 tpd
3250 tpd 50007500
tpd tpd
Binani 2
Unicem, Calabar Al Takamol 6500 tpd
Argos 6250 tpd 4500 tpd Indocement
4500 tpd 700 tpd
Fancesa
750 tpd
CSN Natal Simuma
2 x OK 39 1500 tpd
Dwaalboom
3300 tpd
Golden Bay
> 100 new production lines 350 tpd
Europe CIS
>674 >45
North America
>356
Middle East
>55
India
Central America >141
>94 Rest of Asia
Africa >269
>96
South America
>162 Australia