Professional Documents
Culture Documents
Perhitungan Pilar Jembatan
Perhitungan Pilar Jembatan
1. Pembebanan
Beban Slab
Beban Diafragma
Beban Aspal
Gaya Aksial
Moment My
Moment Mz
3. Desain Element Struktur
Section Tumpuan
Section A
Tinggi balok H = 3 m
Lebar balok B = 2 m
Material
β1 = 0,85
εs = 0,02574
fy / Es = 0,002
fs = 400 Mpa tulangan leleh
ρb = 0,03143
ρmaks 0,75 ρb = 0,02357 tulangan underreinforced
Desain Geser
Vu / φ (Vc +
Vs) = 0,91001 OK
Vs max
0,66 * √fc * bw
*d = 20920,1 kN OK
Section Lapangan
Section B
Tinggi balok H = 3 m
Lebar balok B = 2 m
Material
β1 = 0,85
εs = 0,05192
fy / Es = 0,002
fs = 400 Mpa tulangan leleh
ρb = 0,03143
ρmaks 0,75 ρb = 0,02357 tulangan underreinforced
Desain Geser
Vu / φ (Vc +
Vs) = 0,33111 OK
Vs max
0,66 * √fc * bw
*d = 19988,9 kN OK
Arah longitudinal
2000
100
Tinggi balok H = 2 m
Lebar balok B = 9,2 m
Material
β1 = 0,85
εs = 0,047
fy / Es = 0,002
fs = 400 Mpa tulangan leleh
ρb = 0,02709
ρmaks 0,75 ρb = 0,02032 tulangan underreinforced
Arah transversal
2800
900
Daya dukung ijin pondasi Pall = 1100 kN
Moment ultimate pile cap Mu = 78144 kNm
Tinggi balok H = 2 m
Lebar balok B = 30,5 m
Material
β1 = 0,85
εs = 0,047
fy / Es = 0,002
fs = 400 Mpa tulangan leleh
ρb = 0,02709
ρmaks 0,75 ρb = 0,02032 tulangan underreinforced