DEPARTMENT OF CIVIL ENGINEERING

SSM COLLEGE OF ENGG. AND TECHNOLOGY


TUTORIAL SHEET-II FOR BE 8TH TEACHER INCHARGE: Er.Shaista
Bridge Engineering Kanni
Issue date :30-10-2018 Submission date : 01-10-2018

Q1.Design a steel foot over bridge for the following data:


 Type of the truss: Warren Type
 Span =18m
 Width of walkway= 4m
 Panel Length = 3m
 live load = 1KN/m2
 Flooring =RCC Slab 120mm thick
 Floor finish = 1KN/m2
IRC class-A Loading

Q2. Design a Deck Slab Bridge for the following parameters:


 Clear span = 5.50m
 Width of Carriage way = 7500.0 mm
 Width of Footpath = 1000.0 mm on either side
 Loading : IRC 70R (tracked)
 Materials : Concrete: M25, Steel: Fe415
Q3. Design a welded deck type plate girder bridge deck for a B.G track to suit the
following data:
 Effective span = 40m
 Dead Load of track= 10KN/m
 EULL for B.M calculations/track = 3815KN
Design the plate girder and sketch the details of cross bracing and welded
connections. The design should conform to the relevant IRC of IRC codes.
Q4. Design the RCC slab pane for IRC: Class-A loading. The slab panel is 2m wide
between main beams and 4m long between cross girders. Also check the design
for IRC: Class-AA loading. Adopt M20 grade of concrete and Fe415 grade steel.

Q5. Design the Stringer for trussed girder bridge, having effective span of 60m.
The stringers are placed at 1.8m c/c and placed over the cross girder. Assume
double lane bridge with 1.5m wide footpaths and loading of IRC: Class-A. Take the
distance between the panel points as 6m.