Professional Documents
Culture Documents
Q5. Design the Stringer for trussed girder bridge, having effective span of 60m.
The stringers are placed at 1.8m c/c and placed over the cross girder. Assume
double lane bridge with 1.5m wide footpaths and loading of IRC: Class-A. Take the
distance between the panel points as 6m.