You are on page 1of 24

NEW GUIDELINES AND SIMPLIFIED

APPLICATION PROCESS FOR


EXTENSION OF LANDED RESIDENTIAL
BUILDINGS

1
1.0 SCOPE

• Confined to max. 3-storey Landed


Residential Buildings i.e. detached, semi-
detached, terrace, zero boundary houses
and quadruplex.

• Commercial, Industrial, Strata/highrise


residential and other types of building are
Not included.

2
2.0 PRINCIPLES
• No review of maximum plot coverage and maximum building
depth.
• No revision of current minimum building setbacks.
• No compromise on safety and health aspects as follows:
(i) Manhole and septic tank shall not be
within the walled-up area.

(ii) No opening on side wall if the


minimum side setback is 1.5m and adjoining
to another building & electrical substation

(iii) Any opening on side wall, the


minimum side setback shall comply
with Schedule F in Sarawak Building 3
Ordinance 1994
3.0 DEFINITION

2 Types :

1) Horizontal Extension

2) Vertical Extension

4
1) Horizontal Extension :
 Extension of out-building for living space
to the sides and rear but not to the front of
the main building line;

 At the same time maintaining the


maximum plot coverage and minimum
setbacks of the main building.

 The permitted out-building is allowed to be


fully walled-up and of a single storey height.

5
2) Vertical Extension :
 Extension of space vertically within the
main building without affecting the total
height and main framework of the building.

 Including attic floor, mezzanine floor,


basement and walling-up of balcony.

6
4.0 THE NEW GUIDELINES
Horizontal Extensions

8
Horizontal Extension

9
Horizontal Extension

10
Horizontal Extension

11
Horizontal Extension

12
Horizontal Extension

13
Horizontal Extension

14
Horizontal Extension

15
Horizontal Extension

16
Horizontal Extension

17
Vertical Extension

18
Vertical Extension

19
Vertical Extension

20
Vertical Extension

21
5.0 THE NEW WORK PROCESS
Current Work Process

Planning Permission Building Plan


For Relaxation Approval

Step 1 Step 2

Applicant Applicant

L&S Div. Council

L&S HQ L&S Div.

L&S Div. Council

Applicant Applicant

23
New Work Process
Applicant

Council

Local Authorities to approve:

• Delegation of power from the State Planning Authority to


Local Authorities to consider and approve building
extension as per these guidelines.

• If building extension is beyond these guidelines, the


current work process (application through L&S
Department) still applies.