You are on page 1of 2

TANGEDCO

Chengalpattu Electricity Distribution Circle .

JOINING REPORT OF PROVINCIAL.STAFF

1 Name of the Employee and : T.Angayarselvi


S.F. NO.

2. Desigation : Assesser

3. Head Quarters : Koovathur

4. Section : AE /O&M/ /Koovathur

5. Sub Division : AEE /O&M//Cheyyur

6. Division : EE /O&M/ Madurantagam

7. Referecence 1. SE’s Order :


2. EE’s Order

8 Date of Joining
[FN or AN to be specifically noted} : 00.00.2016 FN

( After medical leave 00.00.16 to


00.00.16 )
9. i) Appointment Retirement

ii) Transfer a) in the same cadre : Same cadre


b) on Promotion :

iii) proceedings on /returning from :


Leave with nature of leave

10. Section from which transferred in the


same of transferred or appointment or promotion : AE / O&M/ Koovathur

SIGNATURE OF THE EMPLOYEE

Endt. No. AE/ O&M/ KVR/F.PROVIN/ D NO / 2016/ DT 00..00 ..2016

Copy submitted to the Superintending Engineer CEDC.,Chengalpattu


Copy submitted to the executive engineer O&M Madurantakam
Copy submitted to the Assistant Executive Engineer /cheyyur
Copy submitted to the Assist Engineer /Koovathur
Copy to the Individual

You might also like