DAILY REPORT FOR ACTION PLAN

Name of the Section:- AEE / O&M / CHEYYUR


DATE 10.10.19

DETAILS
Sl No. Discription of Work Cyr-I Cyr-II Kvr Kdpm Total CHEYYUR-I NIL
Replacement of Damaged Pole CHEYYUR-II
1 7.5 Mtr 0 0 0 NIL
9 Mtr
Replacement of Damaged Conductor KOOVATHUR
2 7/3.15 0 NIL
7/2.50 0
AAAC Kadapakkam
3 Provision of LI Jumper 0 NIL
4 Provision of Stay 0
5 Provision of Copping 0
6 Provision of Guarding 0
7 Maintenance of AB Switch 0
8 Treecutting 0
Instruction of Pole
7.5 Mtr 0
9
8 Mtr 0
9 Mtr 0
10 Low Sagging 0
Distn Transformer
11 Energisation 0
New 0

* if Transformer New Erection Details necessary. Make ,SlNo,HT line Length ,LT Line Length,SS Name