Dcsign pararreters
Ilased on obscrved ggotechnical investigation lollorving design pamrngters have been assumed Using IS - 10270: Cuidelines hrr
design and construction ofprestressed Rock Anchors has been
2. Allorvable grout - reinibrccmcnt bond strcss,iom Vendor's Data Certil]cate: oybond.rcinl = 9 kg/cmr
l. Ilrcaking Strenglh as per lS 14268-1995 Iable I = 26592 kgs
J.Nominal Areaof l5.2mm strand as per lS I 4268- I 995. table 2 : 110 ,,,,n,
5. Allolvable tensile slress in steel (llT): 18979 Pgl66r
2.Rock Anchor Design (lS 10270) for Capacity & Fixed Length Criteria
a)Anqhor Capacity : 2OO MT
b)Iype olRock= Mod Weathered
So Bond Strength between Rock and Crout is 4 kg / cm2
To find the Fixed Length ofcable for the load considered
Ilond Slrength : Force Applied 200* l0D3
Area olContact 7r t Dia ofhole * Lensth ofBond
Further length ofanchor is needed for locking the strands above the pile top which works out to be 4m for 4 anchors and 6n lbr
other 4 anchors
Total Length ol Anchor= 8.7m ( fiee) + I 8.0m ( fixed ) + 4.0m: 30.7 mtr fbr 4 anchors and J0.7 mtr lbr other 4 anchors