COMPARATIVE STATEMENT
PROVISION OF "LI" JUMPERS IN LINE LINES AND RE ALIGHNING OF LEANED POLE/RE SAGGING OF LOW SAG LINES/REPLACING OF WORN OUT
STAY SET IN HT/LT LINES OF VARIOUS DISTRIBUTION TRANSFORMERS
I.San No : 74-510 /D2/001/17-18/DT.2.5.17

M/S AHARINI
M/S ANNAI
ASSOCIATES M/S S. RAMESH
ENTERPRISES
SEKARAJAPURAM CHENGALPATTU
THIRUKALUKUNDRAM
TIRUVALAM

S.NO Description QTY UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT

1 Labour rate for providing LI jumpers in LT line 91 Nos.

Labour rate for releasing the exg. S.PH 2 wire


2 Service connection wire from the LT line and 98 Sc
reconnecting the same in LI jumpers.

Labour rate for releasing the exg. 3.PH 4 wire


3 Service connection wire from the LT line and 18 Sc
reconnecting the same in LI jumpers.

Labour rate for Re alighning of leaned poles in


4 3 Loc
LT pin point location(Up to 8.0M pole)
Labour rate for Re alighning of leaned poles in
5 1 Loc
LT pin point location (9.14M pole)
Labour rate for Re alighning of leaned poles in
6 2 Loc
LT cut point location(Up to 8.0M pole)

7 Providing new stay with stay pit 25 set


Re-sagging low sag LT lines upto
8 5.36 KM
7.3.35 mm ACSR
Replacing the worn out Jumpers in LT Cut
9 12 Loc
points
Replacing of LT Bus Bar arrangement including
10 3 Loc
jumpering

Transport of New Materials from stores to


11 LS
office

TOTAL

Page 1
Page 2

Out of the three firms M/S Aharini Associates at Sekarajapuram has quotated the lowest and same has been recommended for work contract.