A. Slot Welding to be carried out.

Plates, Welding rods, welders


Qualification & procedure of repairing must be approved byclass surveyor.
Second plate is called Wrapping Plate / Cover Plate. Plate is prepared
by marking of the frames on it & thenslots are cut. Then the plate is bend
on the framework & is welded to the frames. Slots are filled with the weld.
These weldsare ground & made smooth.*
Pressure Testing of Rudder
: 1. Gravity method : Fill water in rudder upto 2.46m above top of rudder & observe
it. Waterlevel should not drop.*
Hose Test
: Drain plug has to removed & hose is applied on the slot welds & observe if water is
coming from the drain plug.This is to be done before gravity method.* Coating :
Open top plug , put bottom plug with cock. Fill 50 % water inside & 20 % with paint.
Drain water slowly by cock.This is called
float coat painting