You are on page 1of 1

Table(7) explain shutdown and start-up platforming unit

NEW UNIT
NEW UNIT (121)
(121)
Date of shutdown CAUSE Date of start-up
26/1/2014 power failure 28/1/2014
20/3/2014 Due to the regeneration the catalyst 30/3/2014
04/07/2014 normal shutdown 06/03/2014
28/8/2014 Leak in the elbow of 121H4 10/10/2014
16/10/2014 Gas turbin turned off 17/10/2014
because of the problem in the
24/10/2014 power plant 24/10/2014
26/10/2014 Dropping in the M.P.S 27/10/2014
23/12/2014 Because of the leak in at 121FIC170
OLD UNIT (21)
Date of shutdown CAUSE Date of start-up
26/1/2014 power failure 26/1/2014
circumstances in the country
04/10/2014 14/4/2014
circumstances in the country
15/4/2014 21/4/2014
circumstances in the country
06/02/2014 06/03/2014
normal shudwon for the inspection on
06/06/2014 the 21H5 19/7/2014
normal shudwon because of the
14/9/2014 circumstances in the country 24/9/2014
16/10/2014 Gas turbine has turned off 17/10/2014
17/10/2014 Due to the regeneration the catalyst 15/11/2014
21C1 tripped
17/11/2014 17/11/2014
28/12/2014 Shortage in the crude oil

You might also like