Professional Documents
Culture Documents
Acik
Acik
Bus ID Equipment Nom kV Equipment Gap X Factor Grounding Limited ApLimited App
Restricted Prohibited
Bus AUX_I 6.3 Other 13.0 2 Ungrounde 10 5 2.16 0.6
Page 1
Bus_Report
Available Total Bus Total Bus Source PD Source PD Source Tri Source Tri Source Tri Trip Time Open TimeTotal FCT
0 12.538 12.123 0 0 0 0 0
Page 2
Bus_Report
FPB (ft) Incident E Working DiHazard /Ri PPE DescriInsulated Insulated Glove Class
0 0 18 7500 1
Page 3
PD_Report
Page 4
PD_Report
Arcing kA Upstream Source PD Source PD Upstream FPB (ft) Incident E Working DiHazard /Ri PPE DescriInsulated
12.123 0 0 18 7500
12.123 0 0 18 7500
12.123 0 0 18 7500
12.123 0 0 18 7500
Page 5
PD_Report
Page 6