You are on page 1of 7

WETBLASTING & PAINTING DAILY REPORT

Report No. : 01
DESCRIPTION : Wet Blasting & Painting Date : 14/07/2018
LOCATION : Bravo well (XBW) PLATFORM
WO No :
CONTRACT NO. :
OWNER : PT PERTAMINA EP

1
MATERIAL TO BE PAINTED : 1. UNDERNEATH PLATE 28'x24' (840x720) = 604.800
2. WF 24''x68'' (600x170x2) x840 x 6 pcs = 102,81 & WF 24''x110" (600x275x2) x840 x 4 pcs = 83,16
3 WF 24''x68'' (600x170x2) x720 x 2 pcs = 29,37
4 CH 16''x31'' (40x77x2) x180 x 9 pcs = 1,00
5 CH 16''x31'' (20x77x2) x180 x 12 pcs = 0.66

2
CONDITION ENVIRONMENT
WEATHER ✘ CLEAR CLOUDY RAIN WEATHER CHANGE

TEMP. & TIME 08.0O 11.OO 14.OO 16.OO 17.OO


HUMIDITY DRY BULB TEMPERATURE ºC ºC ºC ºC ºC ºC
WET BULB TEMPERATURE ºC ºC ºC ºC ºC ºC
RELATIVE HUMIDITY % % % % % %
DEW POINT ºC ºC ºC ºC ºC ºC
STEEL TEMPERATURE ºC ºC ºC ºC ºC ºC

3
SURFACE PREPARATION : Method : Wet Blasting
Pressure (psig) : 90 - 100 Psi Blaster : Sunarji
Capacity (CFM) : 750 CFM Air Filter : Fitted
ABRASIVE USED : Silica Sand Brand : Local Roughness : N/A
Size (Mesh) : 16 - 30 Mesh Dust Level : N/A
Shape : Irregular
PREPARATION RESULT : 1.
2.
✘ Accepted Rejected

PROGRESS CALCULATION
B/Q PREVIOUS TO DATE UP TO DATE REMAINING
NO JOB DESCRIPTION REMARK
(m2) (m)
1 Apply Blasting + Primer 4,000.00 4000.00 820.14 820.14 3,179.86
2 Apply Second Coat 4,000.00 4000.00 820.14 820.14 3,179.86
3 Apply Top Coat/Finish Coat 4,000.00 4000.00 820.14 820.14 3,179.86

5
PAINTING SYSTEM (1) :
PAINTING APPLICATION
Method : Air Spray Air Filter : Fitted Painter : SUTARWI
Agitator : Fitted Tips nozle size : 0.13" - 0.17"
GENERIC BATCH APPLICATION Average WFT Average DFT
BRAND NAME COLOUR
TYPE NO TIME DATE (microns) (microns)
1st Coat Epoxy Surface Tolerance Galvosil Aluminium
2nd Coat Epoxy Surface Tolerance Hempadur mastic Grey
3rd Coat Polyurethane Based Coating Hempathane Yellow
Finish Coat

REMARKS : Compressor Fuel On Board


Stock Awal : 200 Ltrs
Received From
Barge : 0 Ltrs
PROGRESS: Progress Applying WF Total Progress OTHER :200 Ltrs

21 % 1st Coat 45% Consumption :50 Ltrs

21 % 2nd Coat 35% 20.5 % Remaining :150 Ltrs


20.50 % Finish Coat 20%

PT. CULA MEGA PT. PERTAMINA EP


PREPARED BY: REVIEWED & WITNESSED BY :

Rindu Fajar HB
Superintendent REPRESENTATIVE
DAILY ACTIVITIES

Project / site : Sandblasting and coating Platform Refurbishment Project 2018 Date :
Location / Area : Bravo

HRS ACTIVITIES

06:00 - 07:00

07:00 - 08:00

08:00 - 08:30

08:30 - 09.00

09:00 - 12:00

12:00 - 13:00

13:00 - 14:00

14:00 - 16:30

16:30 - 17:00

17:00 - 17:30

PT. CULA MEGA


PREPARED BY :

Rindu Fajar HB
REMARK
WETBLASTING & PAINTING DAILY

DESCRIPTION :
LOCATION :
WO No :
CONTRACT NO. :
OWNER :