REPORT NO.
REV.
PAINTING INSPECTION REPORT DATE
SHIFT [DAY]
[NIGHT]
PAGE
JOB NO. : PROJECT NAME :
CLIENT : LOCATION :
APPLICATION METHOD AREA PRIMER COAT : µ SPECIFICATION :
SECOND COAT : µ BLASTING DATE :
AIRLESS BLASTING CHAMBER
TOP COAT : µ PRIMER COAT DATE :
CONVENTIONAL OPEN AREA WEATHER CONDITION : SECOND COAT DATE :
ROUGHNESS : TO µ TOP COAT DATE :
BLASTING METHOD PAINT CONSUMABLE PRODUCT
STEEL GRIT BLAST : PRIMER SECOND COAT TOP COAT
MESH STEEL GRIT : TYPE : TYPE : TYPE :
SAND BLAST : BRAND : BRAND : BRAND :
MESH SAND BLAST : COLOUR : COLOUR : COLOUR :
BATCH NO. : BATCH NO. : BATCH NO. :
THINNER NO. : THINNER NO. : THINNER NO. :
CHECK CONDITION PAINTING SYSTEM
BLASTING PRIMER SECOND COAT TOP COAT
TIME
TEMP. / DRY TEMP. ºC ºC ºC ºC
WET TEMPERATURE ºC ºC ºC ºC
DEW POINT ºC ºC ºC ºC
HUMIDITY % % % %
STEEL TEMPERATURE ºC ºC ºC ºC
SKETCH :
PRIMER AFTER SECOND COAT AFTER TOP COAT
MARK NUMBER QTY CHECK DRY FILM THICKNESS AVG DRY FILM THICKNESS AVG DRY FILM THICKNESS AVG RESULT REMARK
POINT A B C D DFT A B C D DFT A B C D DFT
INSPECTED BY REVIEWED BY WITNESSED BY APPROVED BY,
QC INSPECTOR QC COORDINATOR
Form : BCWP-FAB-010_03