Professional Documents
Culture Documents
Checklist
Project: Facility:
Client: Due date:
Location: PO / Ref #:
Status: Doc Ref #:
3 Safety Section
Section not included in this inspection Ear Protection
Protective Clothing Fall Protection
Respirator Confined Space
Safety Glasses
Safety Observation
4 Cleaning Section
Section not included in this inspection Hand Tool
Cleaning Power Tool
Solvent Clean Pressure Washing
Cleaning Observation
5 Blast Cleaning Section
Section not included in this inspection Recycled Abrasive Test
Blast Cleaning Compressed Air Check
Type and Size Abrasive Nozzle Air Pressure
Clean and Dry Abrasive
Blast Cleaning Observation
6 Coatings Section
Section not included in this inspection Temperature
Coatings Mixing
Coatings as Specified Agitation
Shelf Life Thinning
Batch Numbers Induction Time
Stored Correctly Pot Life
Coating Observation
7 Application Section
Section not included in this inspection Protective Coverings in Place
Application Stripe Coat
Clean Surface Film Thickness - Wet
Time from Surface Preparation Cure Time
Compressed Air Check Recoat Times Observed
Equipment Inter-Coat Cleanliness
Application Method Compressed air used in spraying is
free of moisture and oil
Application Observation
8 Testing Section
Section not included in this inspection Hardness
Testing Solvent Resistance
Visual Film Thickness
Surface Profile Discontinuity
Moisture Adhesion
Surface Contamination Other (see notes)
Testing Observation
8 Finishing Section
Coating completely cured prior to placement Coating applicable for the
in service environment (wet/moist//dry)
Coating completely cured prior to placement Painting /coating capability with
in service substrate and application thickness
approved by ENGINEER
Finishing Observation
Approval
Inspector: Client:
Date: Date:
Signature: Signature: