Civil Work Measurements 1 East wall 3.35 0.8 2.68 2 Bathroom wall 1.35 0.8 1.08 3 Bathroom wall 0.78 0.25 0.195 4 West wall 1.7 0.7 1.19 5 West wall 1.4 0.6 0.84 6 West wall 1.45 0.6 0.87 Total 6.86 Sqf Painting work Measurements 1200 1 West side wall 4.75 2.5 11.875 2400 2 North side wall 1.75 2.5 4.375 3 East side wall 4.27 2.58 11.0166 4 Sauth side wall 0.8 0.92 0.736 630 5 Sauth side wall 0.7 0.92 0.644 360 6 Kitchen ceilling 1.08 1.1 1.188 100 Total 160.51 321.02 Sqf 300 60 530 5580 Labour Mistry Labour Labour Ret Cement Labour travel 5380 Labour dinner 4380 Blue colour White cement Total
Detaile and Abstract Estimate For The Proposed Construction of Ground Floor RCC Roof Residential Building in Site No-132, SF No 455 .Saravanampatti Village, Coinbatore North (TK), Coimbatore (Dist)