Construction Estimate for ISKCON Guest House

This document provides a detailed estimate sheet for a guest house construction project in Nepal. It includes 16 line items with specifications and costs for various construction materials and components. The total estimated cost is over 1.2 million Nepali Rupees (approximately $10,000 USD). Key materials listed include structural steel, roofing sheets, bricks, plastering, windows, doors, flooring and a drop ceiling. The estimate follows the rates set by the local municipality and provides remarks for some items.

Uploaded by

kantish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views4 pages

Construction Estimate for ISKCON Guest House

This document provides a detailed estimate sheet for a guest house construction project in Nepal. It includes 16 line items with specifications and costs for various construction materials and components. The total estimated cost is over 1.2 million Nepali Rupees (approximately $10,000 USD). Key materials listed include structural steel, roofing sheets, bricks, plastering, windows, doors, flooring and a drop ceiling. The estimate follows the rates set by the local municipality and provides remarks for some items.

Uploaded by

kantish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

International Society for Krishna Consciousness of Nepal

Budhanilkantha, Kathmandu
01-4373790
Detail Estimated sheet for Guest House (Rate as per set by Budhanilkantha Municipality 2076/77)
SN Description NO Length Breadth Height Quantity Unit Rate Amount Remarks
1 Site Clearance 1 9.50 10.50 99.75 sq.m. 30.00 2,992.50

2 Earthwork for excavation


Levelling of ground 1 9.50 10.50 0.33 33.25
For foundation 12 0.60 0.60 1.00 4.32
For Long Wall 3 8.84 0.33 0.33 2.95
For Short Wall 3 7.31 0.33 0.33 2.44
For Long Wall (Bathroom) 1 2.74 0.33 0.33 0.30
For Long Wall (Bathroom) 2 1.50 0.33 0.33 0.33
43.59 cu.m. 386.25 16,837.07

3 Vertical Post
MS Square hollow pile (4"x4"), 4mm thick 13 3.81 11.73 580.99 Ut. Wt.= 11.73 kg/m
580.99 kg 155.09 90,105.26
4 Truss Rafter
MS Square hollow pile (3"x3"), 3.2mm thick 2 55.63 7.01 779.93 kg 155.09 120,959.75 Ut. Wt.= 7.01 kg/m

5 Purlin
MS Square hollow pile (2"x2"), 2.9mm thick 2 48.63 4.07 395.85 kg 155.09 61,392.10 Ut. Wt.= 4.07 kg/m
2 57.91 4.07 471.39 kg 155.09 73,107.47 Ut. Wt.= 4.07 kg/m

6 Concrete ([Link]) Pole Jam 12 0.60 0.60 0.91 3.93 cu.m. 13693.50 53,831.90

7 Earth Filling 1 8.84 7.31 0.17 10.77 cu.m. 601.68 6,480.13


International Society for Krishna Consciousness of Nepal
Budhanilkantha, Kathmandu
01-4373790
Detail Estimated sheet for Guest House (Rate as per set by Budhanilkantha Municipality 2076/77)
UPVC PMMA Coating & Mesh Roofing
8 Sheet (3mm thick) 2 10.00 4.47 89.40 sq.m.
Provision for cut-waste 29.80 sq.m. Provision=1/3
119.20 sq.m. 2134.65 254,450.28
9 UPVC PMMA Ridge cover (3mm) thick 4 5.00 20.00 m 2577.30 51,546.00

10 Brick soling
For foundation 12 0.67 0.67 5.33
For rooms 1 9.67 8.00 77.33
82.67 sq.m. 980.66 81,067.89

11 Brickwork (1:4 Cement:Sand)


Exterior Partition 2 4.27 0.11 2.74 2.58 East+West
2 3.66 0.11 1.52 1.23 East+West
2 0.91 0.11 0.61 0.12 East+West
1 6.10 0.11 2.74 1.84 South
1 1.22 0.11 2.13 0.29 South
1 0.91 0.11 0.61 0.06 North
1 5.49 0.11 0.91 0.55 North
Interior Partition 1 5.49 0.11 2.74 1.66 Short Wall
3 0.91 0.11 0.61 0.18 Long+Short Wall
1 7.93 0.11 2.74 2.39 Long wall
Toilet/Bathroom 2 1.52 0.11 2.74 0.92 T. Short Wall
2 1.83 0.11 2.74 1.10 T. Long Wall
2 0.91 0.11 0.61 0.12 T. Long Wall
13.05 cu.m. 14775.51 192,769.43

12.5 mm thick plastering work in 1:4 c/s


12 mortar (Inside and Outside Building)
Exterior Partition 2 4.27 2.74 23.42 North+South
2 3.66 1.52 11.15 North+South
International Society for Krishna Consciousness of Nepal
Budhanilkantha, Kathmandu
01-4373790
Detail Estimated sheet for Guest House (Rate as per set by Budhanilkantha Municipality 2076/77)
2 0.91 0.61 1.12 North+South
1 6.10 2.74 16.73 East
1 1.22 2.13 2.60 East
1 0.91 0.61 0.56 West
1 5.49 0.91 5.02 West
Interior Partition 2 5.49 2.74 30.12 Short Wall
6 0.91 0.61 3.35 Short Wall
2 7.93 2.74 43.50 Long Wall
Toilet/Bathroom 4 1.52 2.74 16.73 Long Wall
4 1.83 2.74 20.08 Long Wall
4 0.91 0.61 2.23 Long Wall
176.61 sq.m. 380.69 67,232.21

Aluminum window section in


size(101×45×1.5mm) fitted with 5mm clear
13 glass
2 2.74 1.83 10.03
4 1.83 1.22 8.93
2 0.61 0.61 0.74
19.70 sq.m. 5617.48 110,681.21

Readymade Wooden door, special (1 side


14 teak) 9 0.91 1.95 15.97
15.97 sq.m. 5882.30 93,943.27

50mm thick Cement Concrete Flooring


15 ([Link]) 1 8.84 7.31 64.62 sq.m. 827.73 53,488.24

16 12.5mm thick MPL Board False ceiling 1 8.84 7.31 64.62 sq.m. 1054.00 68,109.90
International Society for Krishna Consciousness of Nepal
Budhanilkantha, Kathmandu
01-4373790
Detail Estimated sheet for Guest House (Rate as per set by Budhanilkantha Municipality 2076/77)
17 Floor Parquetting 1 8.84 7.31 64.62
Reduction for toilet (1) 2.64 1.52 (4.01)
60.61 sq.m. 2367.00 143,458.19

Wall Panelling with commercial ply 19mm


Interior Walls 2 5.49 2.74 30.12
6 0.91 0.61 3.35
2 7.93 2.74 43.50
262.80 sq.m. 1151.32 302,565.42
Grand Total 1,845,018.22