No Type of culvert Chainage Height Width/SPAN Length No Type of culvert Chainage Height Width/SPAN Length

1 SLAB CULVERT 0+307 1 1 9 35 SLAB CULVERT 5+280 1 1 9


2 SLAB CULVERT 0+413 1 2 9 36 SLAB CULVERT 5+370 1 1 9
3 SLAB CULVERT 0+558 1 2 9 37 SLAB CULVERT 5+420 1 1 9
4 SLAB CULVERT 0+615 1.5 1.5 9 38 SLAB CULVERT 5+530 1 1 9
5 SLAB CULVERT 0+730 1 4 9 39 SLAB CULVERT 5+570 1 1 9
6 SLAB CULVERT 0+905 1 3 9 40 SLAB CULVERT 5+610 1 1 9
7 SLAB CULVERT 0+950 1 1 9 41 SLAB CULVERT 5+670 1 1 9
8 SLAB CULVERT 1+010 3 4 9 42 SLAB CULVERT 5+740 1 1 9
9 SLAB CULVERT 1+640 1 1.5 9 43 SLAB CULVERT 5+790 1 1 9
2 VENT SLAB 2 VENT SLAB
10 1+660 1.5 4 9 44 5+880 1.5 4 9
CULVERT CULVERT
11 SLAB CULVERT 1+925 1.5 1.5 9 45 SLAB CULVERT 6+005 1 1 9
12 SLAB CULVERT 1+975 1 1 9 46 SLAB CULVERT 6+030 1 1 9
13 SLAB CULVERT 2+120 1 2 9 47 SLAB CULVERT 6+140 1 1 9
14 SLAB CULVERT 2+280 1 1 9 48 SLAB CULVERT 6+200 1 1 9
2 VENT SLAB 49 SLAB CULVERT 6+250 1 1 9
15 2+392 2 4 9
CULVERT
50 SLAB CULVERT 6+360 1 1 9
16 SLAB CULVERT 2+670 1 2 9
51 SLAB CULVERT 6+455 1 1 9
17 SLAB CULVERT 2+770 1 2 9
52 SLAB CULVERT 6+575 1 3 9
18 SLAB CULVERT 2+900 1 1 9
53 SLAB CULVERT 6+750 1 1 9
19 SLAB CULVERT 3+060 1 2 9
54 SLAB CULVERT 6+960 1.5 1.5 9
20 SLAB CULVERT 3+250 1 3 9
55 SLAB CULVERT 7+040 1 1 9
21 SLAB CULVERT 3+425 1 3 9
56 SLAB CULVERT 7+215 1.5 3 9
22 SLAB CULVERT 3+540 1.5 4 9
57 SLAB CULVERT 7+300 1.5 4 9
23 SLAB CULVERT 3+695 1.5 2 9
58 SLAB CULVERT 7+480 1 1 9
24 SLAB CULVERT 3+775 1 1 9
59 SLAB CULVERT 7+545 1.5 4 9
25 SLAB CULVERT 4+000 1 1 9
60 SLAB CULVERT 7+720 1 1 9
26 SLAB CULVERT 4+270 1 1 9
61 SLAB CULVERT 7+870 1 1.5 9
27 SLAB CULVERT 4+385 1 1 9
62 SLAB CULVERT 8+010 1 2 9
28 SLAB CULVERT 4+560 1 1 9
63 SLAB CULVERT 8+220 1 1 9
29 SLAB CULVERT 4+650 1 1 9
64 SLAB CULVERT 8+265 1 1 9
30 SLAB CULVERT 4+800 1 1 9
65 SLAB CULVERT 8+500 1 2 9
31 SLAB CULVERT 4+890 1.5 4 9
66 SLAB CULVERT 8+670 3 4 9
32 SLAB CULVERT 4+910 1 1 9
67 SLAB CULVERT 8+820 1.5 1.5 9
33 SLAB CULVERT 5+040 1 1 9
34 SLAB CULVERT 5+160 1 1 9

No DESCRIPTION DATE SURVEYED BY AGE&AES COMPANY


ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE STRUCTURE SCHEDULE
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE PLOT DATE: 03 - 04 - 2013 Sheet No ( 27 ) of 142
GENERAL REQUIREMENT FOR THE CONSTRUCTION OF STRUCTURES
1. CEMENT:

ORDINARY PORTLAND CEMENT

A. SETTING TIME:

INITIAL SETTING TIME: NOT LESS THAN 45 MINUTES


FINAL SETTING TIME: NOT GREATER THAN 8 HOURS

B. STRENGTH:

COMPRESSING STRENGTH (STANDARD CUBE)


3 DAYS:
7 DAYS:
28 DAYS:

2. REINFORCEMENT:

A. STRENGTH:

YIELD STRENGTH (fy) OF MILD STEEL DEFORMED BAR


FOR ALL MEMBER AND THE STEEL SHOULD CONFORM ASTM-A615-40.0.

B. SPLICES IN REINFORCEMENT:

- SPLICES IN REINFORCEMENT IF NECESSARY SHALL BE MADE ONLY AS AUTHORIZED BY THE ENGINEER.


- SPLICES IN REINFORCEMENT AT POINTS OF MAXIMUM STRESS IN SLABS, BEAMS AND GIRDERS SHOULD BE AVOIDED.
- LAP LENGTH WILL BE:
i ) FOR TENSION M.S DEFORMED BAR:
- 40 BAR DIAMETER WITHOUT HOOKS
- 30 BAR DIAMETER WITH STANDARD HOOKS
ii ) FOR COMPRESSION M.S. DEFORMED BAR:
- 24 BAR DIAMETER WITHOUT HOOKS
3. CONCRETE:

FOR VERTICAL MEMBER, BASE SLAB, DECK SLAB, WING WALL RAIL POSTS AND HAND RAILS:

MIX RATIO BY VOLUME, CEMENT : SAND : COARSE AGGREGATE = 1:2:4


OR A RICHER MIX IF THE ABOVE STRENGTH REQUIREMENT IS NOT SATISFIED.

4. MINIMUM CLEAR COVER TO MAIN REINFORCEMENT BAR:

FOR REILPOST AND HAND RAIL -25 mm, ALL FACES


FOR SLAB:
TOP BAR - 50 mm
BOTTOM BAR - 40 mm
EDGE -50 mm
FOR VERTICAL MEMBER, WING WALL:
EARTH FACE -50 mm, WHEN FORM WORK IS USED.
WATER FACE -50 mm
MEMBERS CAST AGAINST AND PERMANENTLY
EXPOSED TO NON-SALINE WATER/SOIL :75 mm
MEMBERS PERMANENTLY EXPOSED TO SLAIN WATER / SOIL 100 mm

5. MIXER MACHINE AND VIBRATOR MUST BE USED IN ALL RCC CASTING.


6. WRITTEN DIMENSIONS ARE TO BE TAKEN IN PREFERENCE TO SCALED ONES.
7. CONSTRUCTION JOINTS IN ADDITION TO THE PLACES SHOWN IN THE DRAWING
SHALL BE PROVIDED AS PER DIRECTION OF THE ENGINEER-IN- CHARGE.

No DESCRIPTION DATE SURVEYED BY AGE&AES COMPANY


ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE STRUCTURE GENERAL NOTE
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE PLOT DATE: 03 - 04 - 2013 Sheet No ( 28 ) of 142
See
600 Detail"A" 600

600 See

1000

1000
Detail"A" 300
300

1000
400

1000

3000

1000
300

3500
300
See

1000
400
Detail"A"

1000

1000
300 300
300

1000
400
400
5700

1000

1000
1500
1000
1000
400
2600

2800
1000 Ch. 1+660 - 1+840
400 Ch. 1+000 - 1+260
1+840 - 2+120

400 NOTES:

1. All dimensions in millimetres unless otherwise stated

50
2. No stone to stone contact is to exist in the completed
2500

@2000 c/c H & 1000c/cV


50mm DIA PVC PIPE WEEP HOLE
wall, each stone must be placed on a layer of mortar.
1800

50
3. Concrete for the base slab is to be proportioned by
volume, 1:2:4, cement: sand: aggregate. Concrete is to be

75
proportioned with a water to cement ratio of 0.45 to be
checked and recorded by the site engineer during
construction on site control sheets.

100
4. Concrete foundation slab is to be cured (by placing wet
sand or hemp sacks on the concrete surface after pouring
4500
and rewetting when required) for a minimum of one week
prior to placement of the masonry work.
75-100mm
Ch. 1+660 - 1+840 5. A mortar mix proportion of 1:4, cement : sand is to be
25-28mm
used for all mortar work.
10-20mm
FINE SAND 6. Location & Length of retaining wall may be changed on
site condition as per directed by the engineer.
See Detail (A)

No DESCRIPTION DATE SURVEYED BY AGE&AES COMPANY


ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE RETAINING WALLS
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE PLOT DATE: 03-04-2013 Sheet No ( 29 ) of 142
WEIGHT

140.941
219.014

571.779

600.368
TOTAL

63.921
40.135
46.855

45.376

28.589
15.536
(KG)
25
Road Way 300
600 1000 600 300 350 300

WEIGHT
OF BAR
(KG/M)
A
Road Level Road Level

0.617
0.617
0.617
2.466
0.888
1.578
1.578
UNIT
1:1.5 1:1.5

GRAND TOTAL
9000 100mm Plain Concrete 1:2: 4

5% LOSSES
SUB TOTAL
150mm Gravel Compacted Layer 50mm Plain Concrete 1:2:4

LENGTH

138.767
TOTAL

89.300
65.100

25.200
76.000

72.000
18.400
D

(M)
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (0.9 X 0.6 x 9)m SLAB CULVERT

IN
C
600

950

TOTAL
No. OF

60.33

31.00

30.00
12.00
BAR

9.40

8.00

8.00
D

3814,21
C

900
1000

B B 1000 x1000
75mm PVC Drain pipe

b ed
400

MEMBAR
100

c
10
00

BAR IN
No. OF

EACH

60.33

31.00

15.00
a
00

6.00
4.00
9.40

8.00
10
600

650

No. SPACI
NG IN
(MM)
100

250
300
300
150

150
100

T3
MEMB
AR
OF
A
100mm Plain

1
1
1
1
1200

2
2
2
1:1.5 1:1.5 1200 Concrete 1:2:4

700 500 800 200


300 Road Way

e
SECTION (A-A)

BAR DIMENSIONS IN
Scale 1:40

a
50mm Plain

(MM)
Concrete 1:2:4

c
600
PLAN VIEW

100

100
0
b
Scale 1:100

25999,99

2100

2100

2100
2100
9500

9500

200
a

T2
16000
250 250

LENGTH SHAPE
IN (MM) CODE
9100

BAR

T1

T1
T2
T2
T2
T2

T3
Ground Level

1650
200 300

Road Level

b
300

10000
25999,99
2.5% Slope 2.5% Slope

2300

2100

2100
2300
2400
9500

9500
BAR
50mm Pcc
Capping 1:2:4
1000

Canal Canal
Level 75mm PVC Drain pipe Level

(MM)
BAR
DIA

20
10
10
10

12
16
16
IN

a
1100
700

4000
100mm Plain

NENT MARK

ST1
COMPO BAR

ST2
ST3
ST4
ST5
ST6
EL
Concrete 1:2:4
400 100mm Stone Pitching SECTION (C-C)
100mm Leane Concrete 1:2:4
Scale 1:40

PARAP

b
WALL
SLAB
TOP
SECTION (B-B)

ET

T1
Scale 1:100
50mm Plain
NOTES:
Concrete 1:2:4
600 1. All dimensions are in "mm" unless otherwise specified,
2. If rounded stone from a river or other source is used, it shall not
250 comprise of more then 30% of the total volume of stone and shall be

500
evenly distributed through out the wall;
1 of 6-10 ST5 Culvert Level 3. All masonry work should be pointed;
300

4. Concrete foundations should be reinforced for earthquake zones;

1250
10 ST4@300 C/C 10 ST3@300 C/C 10 ST3@300 C/C 10 ST4@300 C/C 5. Angle and length of wing walls is to be adjusted by the Engineer as
200 300

12 C/C

650
per site conditions;
200

6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
16 ST2@250 C/C 16 ST1@150 C/C 500
1 of 4-20 ST6 ratio of not more than 0.45;
16 ST1@150 C/C 16 ST2@250 C/C 100mm Plain
700 8. Concrete with a recorded slump value greater than 100mm shall be
Concrete 1:2:4

100
REINFORCEMENT DETAIL ( SECTION A-A)
rejected by the Engineer;
REINFORCEMENT DETAIL ( SECTION B-B) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:40 SECTION (D-D)
Scale 1:40 10. ;
Scale 1:40
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE (1 x 1 X 9) m Slab culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 30 ) of 142
25

WEIGHT

326.801
209.913

812.688

853.322
49.691
TOTAL

81.381

40.634
69.050
56.617
19.235
(KG)
600 1500 600 300 350 300
Road Level Road Level
300 Road Way 300

LENGT WEIGHT
OF BAR
(KG/M)
100mm Plain Concrete 1:2: 4

2.466
0.617
0.617
0.617

0.888
1.578
1.578
UNIT

GRAND TOTAL
A
150mm Gravel Compacted Layer 50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
1:1.5 1:1.5

207.060
133.000
TOTAL
9000

28.000
80.600
91.833
31.200

91.667
H IN
(M)
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 X 1.5 x 9)M SLAB CULVERT
950
600

SPAC No. OF TOTAL


No. OF
1500x1000

71.40

31.00

36.67
14.00

12.00
10.00
BAR

9.67
950
400

100
00
10

1750

MEMBAR

b ed
OF ING IN BAR IN
EACH

71.40

31.00
14.00

18.33

c
B

9.67
6.00
5.00
B

a
1500

75mm PVC Drain pipe

650
C
100
00

100

MEMB (MM)

200
300
300
D

125

150
10

T3
600

1200 1200 100mm Plain

No.

AR
C

1
1
1
1
2
2
2
100
Concrete 1:2:4

D
SECTION (A-A)

200
1:1.5 1:1.5 Scale 1:40

e
A

BAR DIMENSIONS IN

500 850
d
Road Way

a
50mm Plain

(MM)
Concrete 1:2:4

c
600

750
150

100
0
b
600
50mm Plain
PLAN VIEW

2600

2600

2600
2600
9500

9500
Concrete 1:2:4

200
a
500
Scale 1:100

T2
Culvert Level

LENGTH SHAPE
700

IN (MM) CODE
BAR
1250

T1

T1
T2
T2
T2
T2

T3
400

b
650
250 250 Ground Level

250

1750
9100

2900
9500
2600
9500
2600
2800
2500
BAR
250 300

Road Level 100mm Plain


300

800
Concrete 1:2:4

700

(MM)
BAR
DIA
2.5% Slope 2.5% Slope

20
16
16
10
10
10

12

a
IN
50mm PCC SECTION (D-D)
Capping 1:2:4 Scale 1:40

NENT MARK
Canal
1000

Canal

COMPO BAR

ST1
ST2
ST3
ST4
ST5
ST6
75mm PVC Drain pipe

EL
Level Level
1200
100mm Plain

100
700

PARAP
SECTION (C-C) Concrete 1:2:4

b
WALL
SLAB
TOP

ET
Scale 1:40

T1
400 100mm Stone Pitching
100mm Leane Concrete 1:2:4
NOTES:
1. All dimensions are in "mm" unless otherwise specified,
SECTION (B-B) 2. If rounded stone from a river or other source is used, it shall not
250 comprise of more then 30% of the total volume of stone and shall be
Scale 1:100
evenly distributed through out the wall;
1 of 6-10 ST5
300

3. All masonry work should be pointed;


10 ST3@300 C/C 4. Concrete foundations should be reinforced for earthquake zones;
250 300

12 C/C 10 ST4@300 C/C


5. Angle and length of wing walls is to be adjusted by the Engineer as
10 ST3@300 C/C 10 ST4@300 C/C per site conditions;
16 ST1@125 C/C 6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
250

500 16 ST2@200 C/C


1 of 5-20 ST6 ratio of not more than 0.45;
16 ST1@125 C/C 8. Concrete with a recorded slump value greater than 100mm shall be
16 ST2@200 C/C rejected by the Engineer;
REINFORCEMENT DETAIL ( SECTION B-B) 9. The culvert should be constructed with a fall of 2-4%;
REINFORCEMENT DETAIL ( SECTION A-A) Scale 1:40 10. ;
Scale 1:40 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE (1 x 1.5 x 9)m culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 31 ) of 142
1173.546
1117.663
WEIGHT

482.957
324.865
TOTAL

22.935
65.104
59.248
66.379

96.177

55.883
25

(KG)
600 2000 600 300 350 300
Road Way 300 Road Level Road Level

WEIGHT
OF BAR
(KG/M)
A

0.617
0.617
0.617
2.466
0.888
1.578
1.578
UNIT
1:1.5 100mm Plain Concrete 1:2: 4
1:1.5

GRAND TOTAL
9000 50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
150 mm Gravel compacted Layer

LENGTH

306.000
205.833

107.667

108.333
TOTAL

96.100

37.200
26.400
D

(M)
IN
C
600

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 x 2 x 9)m SLAB CULVERT


250
950

900

TOTAL
No. OF

21.67

43.33
90.00

31.00
11.33
12.00
1000 x2000

BAR

8.00
D
400

100

b ed
2000

B B

MEMBAR

c
BAR IN
No. OF
75mm PVC Drain pipe

EACH

90.00
21.67
31.00

21.67
11.33

a
6.00
4.00
650
10
00 100
00

100
10

No. SPACI
NG IN
(MM)

300
300
100
150

150
T3
600

1200

100
1200

MEMB
AR
OF

1
1
1
1
2
2
2
100mm Plain
SECTION (A-A) Concrete 1:2:4

750 500 850 200


Scale 1:40

e
A

1:1.5 1:1.5

BAR DIMENSIONS IN

a
300 Road Way 50mm Plain
Concrete 1:2:4

(MM)

c
600

150

100
0
b
PLAN VIEW

3100
9500
3100
9500
3100
3100
650

200
Scale 1:100

T2
400

LENGTH SHAPE
IN (MM) CODE
BAR
250
250 250 Ground Level

1650

T1

T1
T2
T2
T2
T2

T3
9100

b
Road Level
250 300

650

2500
3400
9500
3100
9500
3100
3300
BAR
300

2.5% Slope 2.5% Slope


50mm Pcc
Capping 1:2:4

(MM)
BAR
DIA

20
10
10
10

12
16
16
IN

a
1000

Canal Canal 1100


Level 75mm PVC Drain pipe Level

100
100mm Plain

NENT MARK

ST1
COMPO BAR

ST2
ST3
ST4
ST5
ST6
Concrete 1:2:4

EL
700

SECTION (C-C)
Scale 1:40
400 100mm Stone Pitching

PARAP

b
WALL
SLAB
100mm Leane Concrete 1:2:4

TOP

ET

T1
SECTION (B-B) 50mm Plain
Concrete 1:2:4 NOTES:
Scale 1:100
600 1. All dimensions are in "mm" unless otherwise specified,
2. If rounded stone from a river or other source is used, it shall not
250 comprise of more then 30% of the total volume of stone and shall be

500
evenly distributed through out the wall;
1 of 6-10 ST5 Culvert Level
3. All masonry work should be pointed;
300

4. Concrete foundations should be reinforced for earthquake zones;

1250
10 ST4@300 C/C 10 ST3@300 C/C 10 ST3@300 C/C 10 ST4@300 C/C 5. Angle and length of wing walls is to be adjusted by the Engineer as
250 300

12 C/C

650
per site conditions;
250

6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
16 ST2@150 C/C 16 ST1@100 C/C 500 ratio of not more than 0.45;
1 of 4-20 ST6 100mm Plain 700
16 ST1@100 C/C 16 ST2@150 C/C 8. Concrete with a recorded slump value greater than 100mm shall be
Concrete 1:2:4

100
REINFORCEMENT DETAIL ( SECTION A-A)
rejected by the Engineer;
REINFORCEMENT DETAIL ( SECTION B-B) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:40 SECTION (D-D)
Scale 1:40 Scale 1:40 10. ;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1 x 2 x 9 m Slab culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 32 ) of 142
1577.432

1656.304
WEIGHT

106.041
130.801
639.207
506.789
25

TOTAL

78.360
85.902
30.333

78.872
(KG)
300 600 3000 600 300 350 300
Road Way

A
Road Level Road Level

WEIGHT
1:1.5

OF BAR
1:1.5

(KG/M)

2.466
0.617
0.617
0.617

0.888
1.578
1.578
UNIT
9000

GRAND TOTAL
150 mm Gravel 100mm Plain
50mm Plain Concrete 1:2:4

5% LOSSES
Concrete 1:2: 4

SUB TOTAL
compacted Layer

LENGTH

405.000
321.100
127.100
139.333

147.333
TOTAL

49.200
43.000
C
600

(M)
IN
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 X 3 x 9)m SLAB CULVERT
300
950

TOTAL
No. OF

90.00
33.80
31.00

56.67
14.67
12.00
10.00
C

BAR
900
1000 x 3000
400

100

b ed
MEMBAR
B

c
3000

BAR IN
No. OF

EACH
75mm PVC Drain pipe

28.33
90.00
33.80
31.00
14.67

a
6.00
5.00
650
100

SPACI
NG IN
100

(MM)

300
300
10

100
125

150
00

00

T3
10

MEMB
1200

100
600

1200

No.

AR
OF

1
1
1
1
2
2
2
SECTION (A-A) 100mm Plain

800 500 900 200


Scale 1:40

e
Concrete 1:2:4

BAR DIMENSIONS IN
A

d
1:1.5 1:1.5

a
50mm Plain

(MM)

c
Road Way Concrete 1:2:4
300 600

200

100
0
b
4100

4100

4100
4100
9500

9500

200
650

T2
PLAN VIEW 400
Scale 1:100

LENGTH SHAPE
IN (MM) CODE
BAR

T1

T1
T2
T2
T2
T2

T3
250
Ground Level

1650

b
250 250
9100

4500

4100

4100
4300
2600
9500

9500
BAR
650
Road Level
300 300

300

2.5% Slope 2.5% Slope

(MM)
BAR
DIA

20
50mm Pcc

12
16
16
10
10
10
IN

a
Capping 1:2:4 1100

100
1000

Canal Canal 100mm Plain

NENT MARK
75mm PVC Drain pipe

ST1
COMPO BAR

ST2
ST3
ST4
ST5
ST6
Level Level

EL
Concrete 1:2:4
SECTION (C-C)
Scale 1:40
700

PARAP

b
WALL
SLAB
TOP

ET
400 200mm Stone Pitching

T1
100mm Leane Concrete 1:2:4
50mm Plain
NOTES:
Concrete 1:2:4
SECTION (B-B)
600 1. All dimensions are in "mm" unless otherwise specified,
Scale 1:100 2. If rounded stone from a river or other source is used, it shall not
250 comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;

500
1 of 6-10 ST5 Culvert Level 3. All masonry work should be pointed;
300

4. Concrete foundations should be reinforced for earthquake zones;

1250
10 ST4@300 C/C 10 ST3@300 C/C 10 ST3@300 C/C 10 ST4@300 C/C 5. Angle and length of wing walls is to be adjusted by the Engineer as
300

12 C/C per site conditions;

650
300

6. Refer to the bar schedule for the length and shape of reinforcement,
300

7. Concrete mix shall be proportioned by volume with a water/cement


16 ST2@125 C/C ratio of not more than 0.45;
16 ST1@100 C/C 500 100mm Plain
1 of 5-20 ST6 16 ST2@125 C/C 700 8. Concrete with a recorded slump value greater than 100mm shall be
16 ST1@100 C/C Concrete 1:2:4

100
rejected by the Engineer;
REINFORCEMENT DETAIL ( SECTION A-A)
REINFORCEMENT DETAIL ( SECTION B-B) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:40 SECTION (D-D)
Scale 1:40 10. ;
Scale 1:40 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1 x 3 x 9 m Slab culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 33 ) of 142
25 300

2713.333

2849.000
1276.195
WEIGHT

199.321
212.802
650.729

164.117
170.958

135.667
TOTAL

39.211
700 4000 700 350

(KG)
300
1:1.5 1:1.5 Road level Road level
100mm Plain

A
Concrete 1:2: 4

LENGTH WEIGHT
OF BAR
(KG/M)
100

2.466

2.984
0.617
0.617
0.617

0.888
1.578
UNIT
Road Way

GRAND TOTAL
150mm Gravel
300 Compacted Layer 50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
9000

412.300
517.500

345.167
323.300

192.567
TOTAL

63.600
55.000
(M)
950

IN
150

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 x 4 x 9)m SLAB CULVERT


1000
500

325
850
1089 700

1089 700
4000

TOTAL
No. OF
1650

BAR

61
43
90

36

73
12
10
00
10

650

b ed
MEMBAR
100

BAR IN
No. OF

EACH

c
61
43
90

36

36
a
6
5
100mm Plain
100mm Plain 200mm stone
1400 1400 Concrete 1:2:4

100
Concrete 1:2:4 pitching
B

No. SPACI
NG IN
4000

4000
B

MEMB (MM)
75mm PVC Drain pipe

100
125
150
150

150
T3
SECTION (A-A)
Scale 1:60

AR
OF

1
1
1
1
2
2
2
200
C
00

e
700 1089

700 1089
D
10

BAR DIMENSIONS IN
50mm Plain

825 500 925


600 50mm Plain 600

d
Concrete 1:2:4

a
Concrete 1:2:4

(MM)

c
650
C
400

1150
Canal

1250
D

225

100
Ground Level

1650
Level

0
b
50

900
50
A

5300
9500
9500
5300
5300
5300
200
a
700

T2
100
100mm Plain
Road Way Concrete 1:2:4
1100 100mm Plain

LENGTH SHAPE
IN (MM) CODE
100

BAR
1:1.5 1:1.5 Concrete 1:2:4

T1

T1
T2
T2
T2
T2

T3
SECTION (D-D)

b
Scale 1:80 SECTION (C-C)
Scale 1:80

2650
5750
9500
9500
5300
5300
5500
BAR
PLAN VIEW
Scale 1:100

(MM)
BAR
250

DIA

a
20

22
16
10
10
10

12
IN
300

NENT MARK
COMPO BAR

ST1
ST2

ST4
ST3

ST5
ST6
EL
250 250

300
9100

PARAP

b
WALL
SLAB
TOP
300

ET
325
Road level
300

T1
2.5% Slope 2.5% Slope 50mm PCC
Capping 1:2:4 500
NOTES:
1. All dimensions are in "mm" unless otherwise specified,
325
1000

Canal
75mm PVC Drain pipe 2. If rounded stone from a river or other source is used, it shall not
Level REINFORCEMENT DETAIL ( SECTION B-B)
Canal
Scale 1:40 comprise of more then 30% of the total volume of stone and shall be
Level evenly distributed through out the wall;
700

3. All masonry work should be pointed;


4. Concrete foundations should be reinforced for earthquake zones;
100mm Leane Concrete 1:2:4 5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
400 200mm Stone Pitching 200mm Stone Pitching 6. Refer to the bar schedule for the length and shape of reinforcement,

325
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
SECTION (B-B) REINFORCEMENT DETAIL ( SECTION A-A) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:100 Scale 1:40 10. ;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1 x 4 x 9 m Slab Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 34 ) of 142
WEIGHT

294.877

944.162

991.370
353.253
TOTAL

60.522

20.715

47.208
53.514

73.982
87.299
(KG)
25 300
700 1500 700 350
Road level Road level
300

LENGTH WEIGHT
OF BAR
(KG/M)
100mm Plain Concrete 1:2: 4

2.466
0.617
0.617
0.617

0.888
1.578
1.578
UNIT
100
1:1.5 1:1.5

GRAND TOTAL
150mm Gravel Compacted Layer

A
50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
Road Way

223.820
186.833
TOTAL

98.167
86.800
33.600
30.000
98.333
300

(M)
950

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 X 1.5 x 9)m SLAB CULVERT

IN
350
350

150
400

800
9000 1500

TOTAL
No. OF
1500

BAR
See Detail "F"
650

650

31
72
20

39
10

12
10
650
2500
400
1089

1089

b ed
MEMBAR
BAR IN
40

No. OF

EACH

c
15

31
72
20

20
a
10

6
5
900
B B 100
1500

1500
75mm PVC Drain pipe 100mm Plain

No. SPACI
NG IN
MEMB (MM)
Concrete 1:2:4

300
300
125
150

150
T3
100mm stone pitching

C
100mm Plain
40

1700 1700

100
Concrete 1:2:4
1089

1089
15

AR
OF

1
1
1
1
2
2
2
650

650
350

200
SECTION (A-A)

e
C
Scale 1:60

BAR DIMENSIONS IN

750 500 850


D
300

a
A
350

(MM)
650 50mm Plain

c
Concrete 1:2:4 50mm Plain
Road Way 650
Concrete 1:2:4

150

100
0
b
1:1.5 1:1.5

900
Canal

700
350

2800
9500
9500
2800
2800
2800
350

200
Level

a
1950

T2
750

2450
900
400

LENGTH SHAPE
IN (MM) CODE
Ground Level

BAR

T1

T1
T2
T2
T2
T2

T3
PLAN VIEW

b
Scale 1:100

900
100
1100 100mm Plain
50

2800
2800

2500
3100
9500
9500

3000
Concrete 1:2:4

BAR
SECTION (D-D) 1500 100mm Plain

100
Scale 1:80 Concrete 1:2:4

(MM)
BAR
DIA

a
20
16
16
10
10
10

12
IN
SECTION (C-C)
250 Scale 1:80

NENT MARK
COMPO BAR

ST1
ST2

ST4
ST3

ST5
ST6
EL
250 250
9100
300

300

PARAP
300

Road level

b
WALL
SLAB
TOP

ET
250 300

T1
2.5% Slope 2.5% Slope
50mm PCC
Capping 1:2:4
250

75mm PVC Drain pipe NOTES:


500
1500

50mm DIA PVC PIPE WEEP HOLE


Canal Canal 1. All dimensions are in "mm" unless otherwise specified,
Level Level 2. If rounded stone from a river or other source is used, it shall not

50
comprise of more then 30% of the total volume of stone and shall be

50
evenly distributed through out the wall;
750

REINFORCEMENT DETAIL ( SECTION B-B)

75
Scale 1:40 3. All masonry work should be pointed;

@2000 c/c
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as

100
500
per site conditions;
100mm Stone Pitching 100mm Leane Concrete 1:2:4 100mm Stone Pitching
6. Refer to the bar schedule for the length and shape of reinforcement,
75-100mm 7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;

250
25-28mm
10-20mm 8. Concrete with a recorded slump value greater than 100mm shall be
SECTION (B-B)
Scale 1:100 FINE SAND rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
Detail (F) 10. ;
REINFORCEMENT DETAIL ( SECTION A-A) 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Scale 1:40
No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1.5 x 1.5 x 9 m culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 35 ) of 142
25 300

1262.518
1202.398
WEIGHT

511.366
344.856

102.096
TOTAL

63.070
24.414

60.120
70.283

86.313
(KG)
700 2000 700 350
300
Road level Road level

LENGTH WEIGHT
OF BAR
100mm Plain Concrete 1:2: 4

(KG/M)

2.466
0.617
0.617
0.617

0.888
100

1.578
1.578
UNIT
1:1.5

GRAND TOTAL
1:1.5 150mm Gravel Compacted Layer

A
50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
Road Way

218.500
324.000

114.000
102.300

115.000
TOTAL

39.600
35.000
950

(M)
300

IN
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 2 x 9)m SLAB CULVERT
250

150
400

350

800
350

9000

1500

TOTAL
No. OF
See Detail "F"

BAR

31

46
90
23
12

12
10
650

650
2000

650
2500
400
1089

1089

b ed
MEMBAR
BAR IN
No. OF
40

EACH

c
15

31
90
23

23
a
12

6
5
900
100

No. SPACI
100mm Plain
2000

2000

NG IN
B B

MEMB (MM)

300
300
75mm PVC Drain pipe

100
150

150
Concrete 1:2:4

T3
100mm Plain
1700 1700

100
100mm Stone
Concrete 1:2:4

C
pitching

AR
OF

1
1
1
1
2
2
2
40
1089

1089
15

200
SECTION (A-A)

e
Scale 1:60
650

650

BAR DIMENSIONS IN
350

750 500 850


C

a
D
300

(MM)
650 50mm Plain

c
A
350

Concrete 1:2:4 50mm Plain


650
Concrete 1:2:4

150

100
0
b
Road Way

900
Canal

700
350

3300
9500
9500
3300
3300
3300
350

200
1:1.5 1:1.5 Level

T2
1950

750

2450
900

LENGTH SHAPE
400

IN (MM) CODE
Ground Level

BAR

T1

T1
T2
T2
T2
T2

T3

b
900
PLAN VIEW

100
1100 100mm Plain
Scale 1:100 50

2500
3600
9500
9500
3300
3300
3500
Concrete 1:2:4

BAR
SECTION (D-D) 1500 100mm Plain

100
Scale 1:80 Concrete 1:2:4

(MM)
BAR
DIA

a
20
16
16
10
10
10

12
IN
SECTION (C-C)
250 Scale 1:80

NENT MARK
COMPO BAR

ST1
ST2

ST4
ST3

ST5
ST6
250 250

EL
9100
300

300
300

Road level

PARAP

b
WALL
SLAB
TOP

ET
250 300
2.5% Slope 2.5% Slope

T1
50mm PCC
Capping 1:2:4
250

75mm PVC Drain pipe NOTES:


1500

Canal 500

50mm DIA PVC PIPE WEEP HOLE


Canal 1. All dimensions are in "mm" unless otherwise specified,
Level Level
2. If rounded stone from a river or other source is used, it shall not

50
comprise of more then 30% of the total volume of stone and shall be

50
750

REINFORCEMENT DETAIL ( SECTION B-B) evenly distributed through out the wall;

75
Scale 1:40 3. All masonry work should be pointed;

@2000 c/c
4. Concrete foundations should be reinforced for earthquake zones;
500 5. Angle and length of wing walls is to be adjusted by the Engineer as

100
100mm Stone Pitching 100mm Leane Concrete 1:2:4 100mm Stone Pitching per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
75-100mm 7. Concrete mix shall be proportioned by volume with a water/cement

250
SECTION (B-B) 25-28mm ratio of not more than 0.45;
Scale 1:100 10-20mm 8. Concrete with a recorded slump value greater than 100mm shall be
FINE SAND rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
Detail (F) 10. ;
REINFORCEMENT DETAIL ( SECTION A-A)
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Scale 1:40
No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1.5 x 2 x 9 m Slab Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 36 ) of 142
1732.632
1650.126
WEIGHT

667.617
530.779

110.973
136.956
TOTAL
25 300

82.182
31.812
89.806

82.506
(KG)
700 3000 700 350
Road level 300 Road level
1:1.5 1:1.5

LENGTH WEIGHT
OF BAR
(KG/M)
100mm Plain Concrete 1:2: 4

2.466
0.617
0.617
0.617

0.888
1.578
1.578
100

UNIT

GRAND TOTAL
Road Way 150mm Gravel Compacted Layer
50mm Plain Concrete 1:2:4

5% LOSSES
300

SUB TOTAL
350
350

423.000
336.300
145.667
133.300

154.267
TOTAL

45.000
51.600
9000

(M)
950

IN
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 3 x 9)m SLAB CULVERT
150
300
400

800
650

650

1500

TOTAL
No. OF
BAR
See Detail "F"

31
90
35

59
12
10
15
1089

1089
3000

40

650
2500
400

15

MEMBAR
BAR IN
No. OF

EACH

31
90

30
35
15

6
5
900
B B 100
3000

3000

No. SPACI
NG IN
MEMB (MM)

300
300
100
125

150
100mm Plain 200mm stone

T3
Concrete 1:2:4 pitching
100mm Plain
1700 1700

100
Concrete 1:2:4

AR
OF
C

1
1
1
1
2
2
2
40
15
1089

1089
SECTION (A-A)

200
Scale 1:60

e
BAR DIMENSIONS IN
650

650
350

800 500 900


d
C

(MM)
D
650 50mm Plain

c
300 50mm Plain
Concrete 1:2:4 650
A
350

Concrete 1:2:4

200

100
0
b
900
Canal

700
Road Way 350 350

4300
9500
9500
4300
4300
4300
Level

200
a
1950

T2
1:1.5 1:1.5

750

2450
400

900

LENGTH SHAPE
IN (MM) CODE
Ground Level

BAR

T1

T1
T2
T2
T2
T2

T3
900
100
1100 100mm Plain 50
Concrete 1:2:4

4700

4300
4300
4500
2600
9500
9500
BAR
PLAN VIEW
Scale 1:100 SECTION (D-D) 1500 100mm Plain

100
Scale 1:80 Concrete 1:2:4

(MM)
BAR
DIA

20
16
16
10
10
10

12
IN
SECTION (C-C)
250 Scale 1:80

NENT MARK
COMPO BAR

ST1
ST2

ST4
ST3

ST5
ST6
EL
250 250
9100
300

PARAP
300

WALL
SLAB
TOP

ET
300

300
Road level

T1
2% Slope 2% Slope
300

50mm PCC NOTES:


Capping 1:2:4
300

50mm DIA PVC PIPE WEEP HOLE


75mm PVC Drain pipe 500 1. All dimensions are in "mm" unless otherwise specified,
1500

2. If rounded stone from a river or other source is used, it shall not

50
Canal Canal
Level Level comprise of more then 30% of the total volume of stone and shall be

50
REINFORCEMENT DETAIL ( SECTION B-B) evenly distributed through out the wall;

75
3. All masonry work should be pointed;

@2000 c/c
750

Scale 1:40
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as

100
per site conditions;
500
6. Refer to the bar schedule for the length and shape of reinforcement,
200mm Stone Pitching 100mm Leane Concrete 1:2:4 200mm Stone Pitching 75-100mm 7. Concrete mix shall be proportioned by volume with a water/cement
25-28mm ratio of not more than 0.45;

300
10-20mm 8. Concrete with a recorded slump value greater than 100mm shall be
FINE SAND rejected by the Engineer;
SECTION (B-B) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:100
Detail (F) 10. ;
REINFORCEMENT DETAIL ( SECTION A-A) 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Scale 1:40
No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1.5 x 3 x 9 m Slab Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 13-04-2013 Sheet No ( 37 ) of 142
25 300

2713.333

2849.000
1276.195
WEIGHT

199.321
212.802
650.729

164.117
170.958

135.667
TOTAL

39.211
700 4000 700 350

(KG)
300
1:1.5 1:1.5 Road level Road level
100mm Plain

A
Concrete 1:2: 4

LENGTH WEIGHT
OF BAR
(KG/M)
100

2.466

2.984
0.617
0.617
0.617

0.888
1.578
UNIT
Road Way

GRAND TOTAL
150mm Gravel
300 Compacted Layer 50mm Plain Concrete 1:2:4

5% LOSSES
SUB TOTAL
350
350

9000

412.300
517.500

345.167
323.300

192.567
TOTAL

63.600
55.000
(M)
950

IN
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 4 x 9)m SLAB CULVERT
150
650

650
400

800

325

1500

TOTAL
No. OF
1089

1089

BAR
4000 See Detail "F"

61
43
90

36

73
12
10
40
15

650
2500
400

b ed
MEMBAR
BAR IN
No. OF

EACH

c
61
43
90

36

36
a
6
5
900
100
B

No. SPACI
NG IN
4000

4000
B

MEMB (MM)

100
125
150
150

150
75mm PVC Drain pipe 100mm Plain 200mm stone

T3
Concrete 1:2:4 pitching 100mm Plain
1700 1700

100
Concrete 1:2:4

AR
OF

1
1
1
1
2
2
2
SECTION (A-A)

200
Scale 1:60

e
40

BAR DIMENSIONS IN
1089

1089
15

825 500 925


d

a
650

650

(MM)
350
650 50mm Plain

c
Concrete 1:2:4 50mm Plain

C
650
Concrete 1:2:4

225

100
0
b
D
300

900
Canal
A
350

350

700
350

5300
9500
9500
5300
5300
5300
Level

200
1950

T2
Road Way

750

2450
900
400

LENGTH SHAPE
IN (MM) CODE
Ground Level

BAR
1:1.5 1:1.5

T1

T1
T2
T2
T2
T2

T3

b
900
100
1100 100mm Plain
Concrete 1:2:4 50

2650
5750
9500
9500
5300
5300
5500
BAR
PLAN VIEW SECTION (D-D) 1500 100mm Plain

100
Scale 1:100 Scale 1:80 Concrete 1:2:4

(MM)
BAR
DIA

a
20

22
16
10
10
10

12
IN
SECTION (C-C)
250 Scale 1:80

NENT MARK
COMPO BAR

ST1
ST2

ST4
ST3

ST5
ST6
EL
250 250
9100
300

PARAP

b
WALL
SLAB
300

TOP

ET
300
Road level
300

T1
2.5% Slope 2.5% Slope
325

50mm PCC NOTES:


Capping 1:2:4
325

50mm DIA PVC PIPE WEEP HOLE


500 1. All dimensions are in "mm" unless otherwise specified,
75mm PVC Drain pipe
2. If rounded stone from a river or other source is used, it shall not
1500

50
Canal Canal comprise of more then 30% of the total volume of stone and shall be
Level

50
Level
REINFORCEMENT DETAIL ( SECTION B-B) evenly distributed through out the wall;

75
Scale 1:40
3. All masonry work should be pointed;

@2000 c/c
750

4. Concrete foundations should be reinforced for earthquake zones;


5. Angle and length of wing walls is to be adjusted by the Engineer as

100
per site conditions;
500 6. Refer to the bar schedule for the length and shape of reinforcement,
200mm Stone Pitching 100mm Leane Concrete 1:2:4 200mm Stone Pitching 75-100mm 7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;

325
25-28mm
10-20mm 8. Concrete with a recorded slump value greater than 100mm shall be
FINE SAND rejected by the Engineer;
SECTION (B-B) 9. The culvert should be constructed with a fall of 2-4%;
Scale 1:100 10. ;
Detail (F)
REINFORCEMENT DETAIL ( SECTION A-A) 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Scale 1:40
No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 1.5 x 4 x 9 m Slab Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 38 ) of 142
25 300

A
800 4000 800 450 450
1:1.5 1:1.5
Road Way
300 300
9000 250 1533,33 250 1533,33 250 1533,33 250
300

D
C
600

Road level
Road level
1414,21

100mm Plain Concrete 1:2: 4

100
150mm Gravel Compacted Layer 50mm Plain Concrete 1:2:4

325
1200

150
950
B B 500
4000

75mm PVC Drain pipe

3000
500

1000
4000 See Detail "F"

4100
20
0
1414,21

00
20

1000
500
600

1000
300

100
A

1:1.5 1:1.5
Road Way
100mm Plain 200mm stone
2500 Concrete 1:2:4 pitching 2500

100
PLAN VIEW 100mm Plain
Scale 1:100 Concrete 1:2:4
SECTION (A-A)
Scale 1:60

250 250
9100

600 50mm Plain


325 300

Road level Concrete 1:2:4


300

2.5% Slope 2.5% Slope

1100
600 50mm Plain
50mm Pcc 600 Concrete 1:2:4
Capping 1:2:4
75mm PVC Drain pipe

1000
Culvert 300

1300
Level
3000

2050
600

900
3900
Canal Canal

600
Level Level Canal Level

100
1100 100mm Plain
750

900
Concrete 1:2:4
200mm Stone Pitching
100mm Leane Concrete 1:2:4
SECTION (D-D)
100

500 2000 100mm Plain


Scale 1:80
Concrete 1:2:4
200mm Stone Pitching SECTION (C-C)
Scale 1:80
SECTION (B-B)
Scale 1:100

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE (3 X 4 X 9) Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 39 ) of 142
NOTES:

50mm DIA PVC PIPE WEEP HOLE


Rail Post 250x250 12x12 Chamfer 75 GI Pipe 1. All dimensions are in "mm" unless otherwise specified,

50
2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be

50
evenly distributed through out the wall;

75
3. All masonry work should be pointed;

@2000 c/c
10@150 C/C- ST8 4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as

100
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
2x2-20 -ST7 7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
75-100mm 8. Concrete with a recorded slump value greater than 100mm shall be
25-28mm rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10-20mm
10. ;
FINE SAND 11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

Detail (F)

2x2x- 20-ST7

250
325

10@150
C/C-ST8

250
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (3 X 4 X 9)M Culvert

BAR No. UNIT


REINFORCEMENT DETAIL ( SECTION A-A) BAR BAR BAR DIMENSIONS IN SPACI No. OF TOTAL TOTAL TOTAL
SECTION "F-F" COMPON BAR DIA (MM) OF BAR IN WEIGHT
Scale 1:40 LENGTH SHAPE NG IN No. OF LENGTH IN OF BAR WEIGHT
ENT MARK IN MEMB (MM) EACH
IN (MM) CODE BAR (M) (KG)
(MM) a b c d e AR MEMBAR (KG/M)

ST1 20 5950 T1 5500 225 1 100 90 90 535.500 2.466 1320.585


250 ST2 16 9500 T2 9500 1 125 45 45 427.500 1.578 674.719
TOP
SLAB ST3 10 5500 T2 5500 1 150 60 60 331.833 0.617 204.582
F F ST4 10 9500 T2 9500 1 150 38 38 357.833 0.617 220.611
800

10@150 C/C- ST8 ST5 10 5500 T2 5500 0 2 6 12 66.000 0.617 40.690


PARAPET
2x2-20 -ST7 ST6 22 5900 T1 5500 200 2 5 10 59.000 2.984 176.053
WALL
300

EL 12 2650 T3 200 825 500 925 200 2 150 38 75 199.633 0.888 177.232

RAIL ST7 20 2050 T4 1650 200 200 8 4 32 65.600 2.466 161.775


300

POST ST8 10 960 T6 200 200 80 8 150 6 48 46.080 0.617 28.409


T1 T2 T3 a T4 c T6 a SUB TOTAL 3004.656
325

a a c
a b d 5% LOSSES 150.233
b b e b
500 c GRAND TOTAL 3154.888
b

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE (3 X 4 X 9) Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03-04-2013 Sheet No ( 40 ) of 142
200600100 100600200

Culvert
CL

00
75 mm Drain
50 Pipe, PVC
@2600 C/C Base Course
5175 50 5175 2.5% 2.5%
5000 5000

1500
2602
2700

1500

1500
2600 1300 100
1352

100 1500

1600
100 100

100

100
900 11100 900
15204

10900
B B
9600

9800

9600
75 mm

50mm DIA PVC PIPE WEEP HOLE


PVC Drain
Pipe @

50

@2000 c/c H & 1000c/cV


2600 C/C

50
75
1392 1392

100
See Detail "C"

100 mm PCC
C C 250 600 Capping 1:2:4
A

75-100mm
1000 25-28mm
50 10-20mm

800
1200 0 400
0 FINE SAND
2300
200
D D

800
400

2450
200600100 100600 200

800
600 50 mm PCC
Capping, 1:2:4

100
2000

700
250
Culvert
250 200
CL 100 mm PCC

1500
1:2:4
800

Base course

100 700
350 600

2.5% 2.5%

1100
100 mm PCC
75mm PVC Drain Pipe
1:2:4
@2600 C/C

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 2@(1.5 X 4 X 9)M CULVERT
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03 - 04 - 2013 Sheet No ( 41 ) of 142
Culvert
100 mm PCC
1:2:4 CL
CL CL
Rail Post 250x250 12x12 Chamfer 75 GI Pipe

250 1392 250 250 1392 250


150 mm
PCC
1:2:4
800

10@150 C/C- ST8


See Detail "B"
350 600

1000 700
2x2-20 -ST7
2x2x- 20-ST7

300
700
700

400

250
350 350
100

1500
See Detail "A"
400
800

300 550 2850 250 10@150


100 mm PCC C/C-ST8
1:2:4 See Detail "C"

1200
1500

1500 100
200 mm Stone
100

100

Pitching 250
100 mm PCC
2200 2500 2200
1:2:4
F F

10@150 C/C- ST8

800
2x2-20 -ST7

12 ST4@150 C/C 1 OF 6-12 -ST5


12 ST4@150 C/C
12 ST3@150 C/C

600
12 EL@150 C/C
12 ST3@150 C/C

350

350

350
16 ST2@125 C/C 20 ST1@100 C/C
16 ST2@125 C/C
1OF 6 -20 -ST6 20 ST1
500 @100 C/C

50 mm Wooden Plank
RCC SLAB
10 mm RCC SLAB
Rubber T=350mm
Bearing
Plate PVC Pipe
10mm
Rubber
Bearing
c/c-ST10
Plate
Filling

22@1000 c/c 16@200


with PVC Pipe-ST13 c/c-ST11

RCC PILLER 8@200 c/c-ST12


CUP, h=300MM
16@180 c/c-ST9 Stone Massonry
Stone Massonry Abutment

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 2@(1.5 X 4 X 9)M CULVERT
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03 - 04 - 2013 Sheet No ( 42 ) of 142
200600100 100600200 Bridge
CL
75 mm Drain
Pipe, PVC
0 0 @2600 C/C Base Course
50
2.5% 2.5%
Slope Slope

50 5000 5000
5175 5175

2000
2700
2510

2000

2000
2600 1300 200
1250

100 1500

1600
100 100

100

100
900 11304 900
15204

11100

10000
B B
9600

9600
75 mm

50mm DIA PVC PIPE WEEP HOLE


PVC Drain
Pipe @

50

@2000 c/c H & 1000c/cV


2600 C/C

50
75
1392 1392

100
See Detail "C"

100 mm PCC
C C 250 600 Capping 1:2:4
A

75-100mm
1000 25-28mm
1400 10-20mm

1000
400
FINE SAND
2546
D D

1000

3050
200
200600100 100600 200 400

600 50 mm PCC
Capping, 1:2:4

1000

1000
250 250 200

100
Culvert

2000
CL
2000
800

2.5% 2.5%
Base course

900
Slope Slope
100 mm PCC
350 600

1:2:4

100
1100
75mm PVC Drain Pipe
100 mm PCC
@2600 C/C
1:2:4

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 2@(2 X 4 X9)M Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03 - 04 - 2013 Sheet No ( 43 ) of 142
Culvert
100 mm PCC
1:2:4 CL
CL CL
Rail Post 250x250 12x12 Chamfer 75 GI Pipe

250 1392 250 250 1392 250


150 mm
PCC
1:2:4
800

10@150 C/C- ST8


See Detail "B"
600 350 600

1000 700
2x2-20 -ST7
2x2x- 20-ST7
See Detail "C"
300
400 700

250
See Detail "B" 350 350
400 See Detail "A"
600

2000
200
200 See Detail "c"
250 10@150
100 mm PCC C/C-ST8
300 550 2750
800

400 1:2:4

1400
1500

1500

200 mm Stone 100


Pitching 250
100

100

100 mm PCC F F
2600 2700 2600 1:2:4
10@150 C/C- ST8

800
2x2-20 -ST7

12 ST4@150 C/C 1 OF 6-12 -ST5


12 ST4@150 C/C
12 ST3@150 C/C

600
12 EL@150 C/C
12 ST3@150 C/C

350

350

350
16 ST2@125 C/C 20 ST1@100 C/C
16 ST2@125 C/C
1OF 6 -20 -ST6 20 ST1
500 @100 C/C

50 mm Wooden Plank
RCC SLAB
10 mm RCC SLAB
Rubber T=350mm
Bearing
Plate PVC Pipe
10mm
Rubber
Bearing
c/c-ST10
Plate
Filling

22@1000 c/c 16@200


with PVC Pipe-ST13 c/c-ST11

RCC PILLER 8@200 c/c-ST12


CUP, h=300MM
16@180 c/c-ST9 Stone Massonry
Stone Massonry Abutment

No DESCRIPTION DATE SURVEYED BY AGE & AES COMPANY Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)
ISLAMIC REPUBLIC OF AFGHANISTAN PROJECT NAME
DESIGNED BY ENG. SIDDIQULLAH "SALARI"
MINISTRY OF PUBLIC WORKS CONTRACT NO
DRAWN BY ENG. ABDUL BARI "RAHIMI"
CHECKED BY DR. MOHAMMAD IMAM "ALIMI"
UNITED NATIONS OFFICE FOR PROJECT
DRAWING TITLE 2@(2 X 4 X9)M Culvert
VERIFIED BY ENG. MAHMOOD "SAEED" SERVICES (UNOPS) KABUL, AFGHANISTAN
APPROVED BY ENG. ABDUL SATTAR "RAUFI" TRANSPORT SECTION PORTFOLIO (TSP) DRAWING SCALE As shown PLOT DATE: 03 - 04 - 2013 Sheet No ( 44 ) of 142

You might also like