Professional Documents
Culture Documents
0.25m
DIMENSION AT SITE FOR SUITABILITY. ALL DIMENSIONS AND
0.25m
ELEVATIONS SHALL BE CONFIRMED AND VERIFIED PRIOR TO
0.70m
0.25m
CONSTRUCTION.
5. CARE SHOULD BE TAKEN BY CONSTRUCTION CONTRACTOR NOT
TO DISTURB/DAMAGE NEAR BY EXISTING
LADDER DETAILS 4 FOUNDATION/STRUCTURES
6.CLASH WITH EXISTING UG/ABOVE GROUND
SERVICES/STRUCTURES SHALL BE CHECKED & VERIFIED AT SITE
02 BEFORE EXECUTION. IN CASE OF ANY CLASH/ISSUE IDENTIFIED IT
SHALL BE BROUGHT TO THE NOTICE OF THE ENGG, IN CHARGE
FOR REMEDIAL ACTION.
7.IF LOOSE SOIL, BAD GROUND OR CAVITIES ARE ENCOUNTERED
AT WITHIN ANY PART OF THE EXCAVATIONS, REFER TO DOC No.
101591PF-C-G0-G000-CI-SPC-1003 (SPECIFICATION FOR
EARTHWORKS).
8.ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH PROJECT
SPECIFICATION DOC No. 101591PF-C-G0-G000-CI-SPC-1001.
9.ALL BACKFILLING AND SUBGRADE SHALL BE COMPACTED TO 95%
OF MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT
OBTAINED IN ACCORDANCE WITH MODIFIED PROCTOR TEST PER
ASTM 1557. THE CONTRACTOR SHALL USE PROPER METHOD OF
COMPACTION TO ACHIEVE THE REQUIRED COMPACTION
PERCENTAGE.
L40x40x4mm
40mm
D
C.L OF PIPE
C.L OF PIPE
02 02
1.08m
1.15m
C.L OF PIPE
0.88m
1.00m
C.L OF PIPE REFERENCE DOCUMENTS
Detail
0.65m
02
c
200
REVISIONS