Professional Documents
Culture Documents
3
BOLT SIZE NOS. CONNECTED ASSY.
173
33
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
h12 + WASHER M19.05-FLAT-E
BOLT M19.05*38.1-A307
2
2
EP-H3 + NUT M19.05-GR8-HEX
+ WASHER M19.05-FLAT-E
2
2
3
33
731
h19
h20 h28 200
38 124 38
6
R7 62 62
38
h14
h11
117
75
p2
2021
h28 h28
h17
38
31 h14
2 h11
A-A
400
p2
h15
1
93 61 h28
2 8 62 62 2
h14 h18
1000
41
200 p2
400
A A A ISSUED FOR APPROVAL 10/19/2023
38 124 38 61 REV. DESCRIPTION DWN CHK DATE
9 62 62 CLIENT:
66 h4
38
0 h33
2 Ø 19.05 40
200
75
p2
10
CONTRACTOR:
38
61
9 62 62 FABRICATOR:
66
PART DETAIL OF p2 0
35
Tekla structures
CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
4 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H3 HANDRAIL SHOP DRAWING