GRID LOCATION BOTTOM ELEVATION

5/D- +96.400 All Holes are: 22 mm U.N.O.


GENERAL NOTES:
2/- +96.400 All Welds are: 6 mm U.N.O.
1/- +96.400 MATERIAL LIST FOR ASSEMBLY EP-H1 4 Nos. REQD
4/D- +96.400
Mark Profile Material No. Length Area Weight
EP-H1 PIPE1-1/2SCH40 A53-GR.B 4 6176 1 94
p2 PL10X75 A36 24 200 0 28
h7 PIPE1-1/2SCH40 A53-GR.B 8 145.96 0 4
h8 PIPE1-1/2SCH40 A53-GR.B 12 1109.7 1 51
h9 PIPE1-1/2SCH40 A53-GR.B 8 1112.3 0 34
h13 PIPE1-1/2SCH40 A53-GR.B 4 1114.9 0 17
h16 PIPE1-1/2SCH40 A53-GR.B 8 226.64 0 7
h18 PIPE1-1/2SCH40 A53-GR.B 8 555.00 0 17
h21 PIPE1-1/2SCH40 A53-GR.B 4 301.86 0 5
h22 PIPE1-1/2SCH40 A53-GR.B 4 102.70 0 2
h29 PIPE1-1/2SCH40 A53-GR.B 4 279.50 0 4
h30 PIPE1-1/2SCH40 A53-GR.B 32 1171.0 1 142
h31 PIPE1-1/2SCH40 A53-GR.B 8 1171.0 0 36
h32 PIPE1-1/2SCH40 A53-GR.B 4 218.01 0 3
TOTAL 4 110

BOLT LIST FOR ONE ASSEMBLY


5757 BOLT SIZE NOS. CONNECTED ASSY.
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
250 5@1047=5237 270
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
BOLT M19.05*38.1-A307 2
h16 + NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
135

358
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2

358
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2

h21 h18
h31

h8
h7
h32

h31
p2
h30 302 200

h8 62 62 38 124 38
500
2618

803
2 Ø 19.05

38 38
75
h30 p2 671
h30
A A
h8 62 62 2
501 117 PART DETAIL OF p2
3879

h30 670
h30 p2

62 62 2
501 117
EP-H1
h9 A ISSUED FOR APPROVAL 10/19/2023
h30
670 REV. DESCRIPTION DWN CHK DATE
h30 p2
CLIENT:
125

h9
62 62 200
2
R 502 117
h7 76 38 124 38
400

62 62
669
h30
p2 CONTRACTOR:

38 38
h29
1000

p2

75
h18 62 62 2
400

503 117
FABRICATOR:
h16

h22
h13
668
A-A
200

p2

62 62 2
503 117
Tekla structures

CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
4 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H1 HANDRAIL SHOP DRAWING

DWG NO: SCALE: REV:


A3
EP-H1 A
GRID LOCATION BOTTOM ELEVATION

1/- +99.200 All Holes are: 22 mm U.N.O.


GENERAL NOTES:
5/C-D +99.200 All Welds are: 6 mm U.N.O.
MATERIAL LIST FOR ASSEMBLY EP-H2 2 Nos. REQD
Mark Profile Material No. Length Area Weight
EP-H2 PIPE1-1/2SCH40 A53-GR.B 2 1885 0 14
p1 PL6X100 A36 2 2148.2 0 20
p2 PL10X75 A36 4 200 0 5
h5 PIPE1-1/2SCH40 A53-GR.B 4 167.07 0 3
h6 PIPE1-1/2SCH40 A53-GR.B 4 177.07 0 3
h10 PIPE1-1/2SCH40 A53-GR.B 4 1089.9 0 17
h21 PIPE1-1/2SCH40 A53-GR.B 4 300 0 5

2148 h23 PIPE1-1/2SCH40 A53-GR.B 2 190 0 1


h24 PIPE1-1/2SCH40 A53-GR.B 2 579.99 0 4

100
h25 PIPE1-1/2SCH40 A53-GR.B 2 590 0 4
h26 PIPE1-1/2SCH40 A53-GR.B 2 195 0 1
h27 PIPE1-1/2SCH40 A53-GR.B 4 1500 0 23
TOTAL 2 50

BOLT LIST FOR ONE ASSEMBLY


BOLT SIZE NOS. CONNECTED ASSY.
BOLT M19.05*38.1-A307 2

PART DETAIL OF p1 + NUT M19.05-GR8-HEX


+ WASHER M19.05-FLAT-E
BOLT M19.05*38.1-A307
2
2
2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2

PIPE1-1/2SCH40 x 2100
200
300 1500 300 38 124 38

38
A
EP-H2 h6 2 Ø 19.05

75
38
R
h5 76
400

PART DETAIL OF p2
h21 h27 h21
1100

h24
h25 h10
400

h10 h10 A ISSUED FOR APPROVAL 10/19/2023


REV. DESCRIPTION DWN CHK DATE

CLIENT:
h5 h27

h6
h26 h23
100
300

p1 p1 CONTRACTOR:

p2
FABRICATOR:
p2 p2
62 62
10

62 62
A-A 324 324
A
Tekla structures

CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
2 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H2 HANDRAIL SHOP DRAWING

DWG NO: SCALE: REV:


A3
EP-H2 A
GRID LOCATION BOTTOM ELEVATION

4/B-C +98.283 All Holes are: 22 mm U.N.O.


GENERAL NOTES:
2/- +98.283 All Welds are: 6 mm U.N.O.
1/- +98.283 MATERIAL LIST FOR ASSEMBLY EP-H3 4 Nos. REQD
5/B-C +98.283
Mark Profile Material No. Length Area Weight
EP-H3 PIPE1-1/2SCH40 A53-GR.B 4 1551 0 24
p2 PL10X75 A36 12 200 0 14
h4 PIPE1-1/2SCH40 A53-GR.B 4 201.90 0 3
h11 PIPE1-1/2SCH40 A53-GR.B 8 157.39 0 5
h12 PIPE1-1/2SCH40 A53-GR.B 4 236.44 0 4
h14 PIPE1-1/2SCH40 A53-GR.B 12 1104.6 1 50
h15 PIPE1-1/2SCH40 A53-GR.B 4 210.32 0 3
h17 PIPE1-1/2SCH40 A53-GR.B 4 222.34 0 3
h18 PIPE1-1/2SCH40 A53-GR.B 4 554.99 0 8
1532 h19 PIPE1-1/2SCH40 A53-GR.B 4 529.99 0 8
h20 PIPE1-1/2SCH40 A53-GR.B 4 312.48 0 5

260 549 549 175 h28 PIPE1-1/2SCH40 A53-GR.B 16 659.21 0 40


h33 PIPE1-1/2SCH40 A53-GR.B 4 60.046 0 1
TOTAL 2 42

BOLT LIST FOR ONE ASSEMBLY

3
BOLT SIZE NOS. CONNECTED ASSY.

173
33
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
h12 + WASHER M19.05-FLAT-E
BOLT M19.05*38.1-A307
2
2
EP-H3 + NUT M19.05-GR8-HEX
+ WASHER M19.05-FLAT-E
2
2

3
33

731
h19
h20 h28 200
38 124 38
6
R7 62 62

38
h14
h11

117

75
p2

2021
h28 h28
h17

38
31 h14
2 h11
A-A

400
p2

h15

1
93 61 h28
2 8 62 62 2
h14 h18

1000
41
200 p2

400
A A A ISSUED FOR APPROVAL 10/19/2023
38 124 38 61 REV. DESCRIPTION DWN CHK DATE

9 62 62 CLIENT:

66 h4
38

0 h33
2 Ø 19.05 40

200
75

p2

10
CONTRACTOR:
38

61
9 62 62 FABRICATOR:
66
PART DETAIL OF p2 0

35
Tekla structures

CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
4 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H3 HANDRAIL SHOP DRAWING

DWG NO: SCALE: REV:


A3
EP-H3 A
GRID LOCATION BOTTOM ELEVATION

2/- +99.200 All Holes are: 22 mm U.N.O.


GENERAL NOTES:
4/C-D +99.200 All Welds are: 6 mm U.N.O.
MATERIAL LIST FOR ASSEMBLY EP-H4 2 Nos. REQD
Mark Profile Material No. Length Area Weight
EP-H4 PIPE1-1/2SCH40 A53-GR.B 2 1885 0 14
p1 PL6X100 A36 2 2148.2 0 20
p2 PL10X75 A36 4 200 0 5
h5 PIPE1-1/2SCH40 A53-GR.B 4 167.07 0 3
h6 PIPE1-1/2SCH40 A53-GR.B 4 177.07 0 3
h10 PIPE1-1/2SCH40 A53-GR.B 4 1089.9 0 17
h21 PIPE1-1/2SCH40 A53-GR.B 4 300 0 5
2148 h23 PIPE1-1/2SCH40 A53-GR.B 2 190 0 1
h24 PIPE1-1/2SCH40 A53-GR.B 2 579.99 0 4
h25 PIPE1-1/2SCH40 A53-GR.B 2 590 0 4
h26 PIPE1-1/2SCH40 A53-GR.B 2 195 0 1

100
h27 PIPE1-1/2SCH40 A53-GR.B 4 1500 0 23
TOTAL 2 50

BOLT LIST FOR ONE ASSEMBLY


BOLT SIZE NOS. CONNECTED ASSY.

PART DETAIL OF p1 BOLT M19.05*38.1-A307


+ NUT M19.05-GR8-HEX
+ WASHER M19.05-FLAT-E
2
2
2
BOLT M19.05*38.1-A307 2
+ NUT M19.05-GR8-HEX 2
+ WASHER M19.05-FLAT-E 2

200
PIPE1-1/2SCH40 x 2100 38 124 38

38
300 1500 300
2 Ø 19.05

75
h5 EP-H4
h6

38
R
76
PART DETAIL OF p2
400

h21 h27 h21


1100

h25 h24
400

h10 h10 A ISSUED FOR APPROVAL 10/19/2023


h10 REV. DESCRIPTION DWN CHK DATE

h5 CLIENT:
h27 h23

h6
h26
100
300

CONTRACTOR:
p1 p1
p2
FABRICATOR:
10

p2
62 62 p2 62 62
A-A 324 324
A
Tekla structures

CONTRACT NO.:
DRAWING TITLE:
EVAPORATION POND PLAN AND DETAILS
2 No.s HAND_RAILS REQUIRED AS DRAWN MARKED EP-H4 HANDRAIL SHOP DRAWING

DWG NO: SCALE: REV:


A3
EP-H4 A