You are on page 1of 3

TUGAS ONLINE KELOMPOK 1

BAHASA INGGRIS KESEHATAN

Kelas : C7
Disusun Oleh :
Dinar Restu Pangestu 183112540120510
Muhimmatul Falasifah 183112540120358
Ida Farida Ariani 183112540120400
Melda Nur Anggraini 183112540120455
Ai Muhayah 183112540120343
Debora Lamtiar 183112540120394
Dewi Aprianti 183112540120494
Rusnawati 183112540120440
Elis 183112540120493

FAKULTAS ILMU KESEHATAN PROGRAM STUDI


SARJANA TERAPAN KEBIDANAN
JAKARTA
2018
Passive Voice Exercises

Practicing I
Read the paired sentences aloud. Write "A" in the blank beside the sentence in the active voice,
"P" in the blank beside the sentence in the passive voice.
a. Active voice Louise made the coffee.
b. Passive voice The coffee was made by Louise.
c. Passive voice The package was advertised by the travel agent.
d. Passive voice The travel agent advertised the package

Practicing II
Rewrite these sentences to put them in the active voice.
a. The sugar water was relished by the hummingbirds.
The hummingbirds relished the sugar water
b. Jogging is done by many people for exercise.
Many people jogging is done for exercise
c. A standing ovation was given to the guitar player.
The guitar player gives from a standing ovation
d. The syllabus was handed out by the professor.
The proffesor handed the styllabus

Practicing III
Using either a computer or a piece of scratch paper, rewrite the following paragraph in the active
voice.
Last summer our house was painted by me. The job took about two weeks. First, the
exterior was washed using warm water and a mild detergent. Then all the chinks and pores in the
walls were sealed with putty. After the putty had had a chance to dry, the exterior could be
painted. A latex paint was used because it is easy to apply and cleans up with water. A whole
week was needed to finish this part of the job. I was very careful to apply the paint evenly
because I did not want to have to apply two coats. A color was used that was very close to the
original color. Our house is a two-story house, which meant that a tall ladder was needed to do
the second story. The paint can had to be balanced on the top rung of the ladder while I worked.
When the job was finished, a great deal of satisfaction was felt by me. I had to pat myself on the
back. Even my dad said that a good job was done.
The Answer :
I paintes our house last summer. The job took about two weeks. First, the exterior washed
using warm water and a mild detergent. Then all the chinks and proses in the walls were sealde
with putty. The exterior could painted after the putty had a chance to dry. A latex paint used
because it easy to apply and cleans up with water. To finish the part of job needed a whole week.
I was very careful to apply the paint evenly because I did not want to have to apply two coats.
The original colour used colour very close. The second story our house is two-story house, which
mean that needed a tall ledder. I worked the paint can had to be balance on the top rung of ladder.
When the job finished, I great deal satisfaction felt. I had to pat myself on the back. My dad said
that a good job was done

You might also like