Daily Drilling Fluid Report API No: BOQECR9AGCAT2VB4 Report No: 006

Date 12-02-2018 11:59:00 PM Well Name ZB-366 Spud Date 11-27-2018


Operator ENI DGS - 002,ZUBAIR Country Iraq Depth (MD/TVD) 983.00 / 982.00 m
Operator Rep Mohamed Miri,Pasquale Zingarelli State Al Basrah Rig Name KCADT-210
Contractor KCA DEUTAG DRILLING GMBH County Rig Activity Flow Check
Contractor Rep Mohamed Ali Field or Block Zubair Field Unit System WSE API(Copy)
Bit Information Drill String (in) / (m) Casing (in) / (m) Pumps 1 2 3
Bit Size 12.250 in OD ID Length T OD Set MD Model BOMCO F1600 BOMCO F1600 BOMCO F1600
Make/Type HDBS / MME65DM Drill Pipe 5.000 4.276 257.92 C 24.500 @ 54.00 Bore | Strokes in 6.500 12.000 6.500 12.000 6.500 12.000
Jets 6x16 Drill Pipe 5.000 3.000 138.53 C 18.625 @ 740.00 Eff (%) 97 97 97
TFA liter/strk 19.0 19.0 19.0
1.178 in2 Drill Collar 6.750 2.810 18.68
SPM 0 0
Jets Velocity ft/s Drill Collar 8.250 3.000 10.45
L/min | L/min 0.00 0.00 0.00 0.00 0.00 0.00
Jet Impact Force lb Other 8.120 6.40
Circulation/Hydraulics Data(Simulated on Bottom)
Bit HHSI hhp/in2 Drill Collar 8.250 3.000 67.71
Surf to Bit Time Total L/min Pressure Drop (psi)
Bit Depth MD 500.00 m Bit 12.250 0.30
Bit Depth TVD 500.00 m BU Time min AV, Riser Surface
Riser Open Hole Total Circ Time AV min DP Drill Pipe
RPM Bit rpm Open Hole 12.250 243.00 Surf to Bit Strk AV max DC Motor+Other
RPM Surface rpm BU Strokes AV max Csg Annulus
Torque 2,174 ft-lbf Total Strokes ECD@Shoe 1.12 Bit
WOB ton (long) Circ Press psi ECD@Bit 1.12 Tot Pres Loss
Properties 1 2 3 Hyd 4 Targets Program Fluid Treatments
Fluid Set Gel/Polymer Gel/Polymer Gel/Polymer Gel/Polymer Fluid Type Gel/Polymer
Source Flow Line Flow Line Flow Line 3- INTERMEDIATE
Time 6:00 12:00 17:00 23:59 * Water well analysis: salinity: 30,000 mg/l --
Depth (MD/TVD) m 870.00/870.00 937.00/937.00 983.50/983.30 983.50/983.30 Hardness: 2800 mg/l.
FL Temp ºF 116 118 118 * Fresh water analysis: Salinity: 400 mg/l --
Density @ ºF SG 1.12@100 1.12@118 1.12@118 1.12@110 1.12 1.12 Hardness: 200 mg/l.
FV @ ºF sec/qt 62@120 60@118 60@118 62@110 55 65
PV @ ºF cp 11@120 12@120 12@120 11@120 * Treated active system with Barazan to keep
YP lbs/100ft2 35 32 33 35 25 35 rheology in range .
GELS lbs/100ft2 12/16/25 12/17/25 12/16/25 12/16/25 * Treated active system with caustic soda
600/300 57.0/46.0 56.0/44.0 57.0/45.0 57.0/46.0
and soda ash for alkalinity and hardness .
200/100 40.0/32.0 39.0/30.0 39.0/30.0 39.0/29.0
* Diluted system with pre-treated mud to
6/3 14.0/10.0 14.0/10.0 14.0/10.0 14.0/10.0
Filtrate (API) mL/30min 7.7 7.8 7.6 7.6 7.0 10.0 keep level and parameters in range .
HTHP @ ºF mL/30min * @ 814m got 6 m3/hr partial down hole
Cake (API/HTHP) 32nd in 1/0 1/0 1/0 1/0 losse, cured by pumping 3 m3 80 ppb LCM
Corr Solid % by vol 7.2 7.2 7.2 7.2 pill
NAP / Water % by vol 0.0/92.5 0.0/92.5 0.0/92.5 0.0/92.5
Rig Activity
NAP / Water Ratio
Sand % by vol 0.20 0.20 0.20 0.20 • Drill 12 1/4" Pilot Hole From 815m To 983m
MBT ppb eq. 20.0 20.0 20.0 20.0 15.0 25.0 with controlled parameters, at 817m observed
pH @ ºF 9.8@72 9.8@72 9.6@72 9.6@72 9.5 10.0 well losses +/- 6 m3/h Pump on fly 5 m3 80
ALK Mud (Pm) mL 1.00 1.00 0.90 0.90 ppLCM ( Total Lost 2 m3 ); After LCM Pill
ALK Filt (Pf/Mf) mL 0.55/0.60 0.55/0.65 0.50/0.60 0.50/0.60
No losses in well observed.
Chlorides mg/L 1,400 1,400 1,400 1,400
• Pumped 5m3 HiVis & Circulate hole clean
Total Hardness mg/L 400 440 420 400
LGS / HGS % by vol 5.7/1.5 5.7/1.5 5.7/1.5 5.7/1.5 0.0 6.0
LGS / HGS ppb 44.95/22.49 44.95/22.49 44.95/22.49 44.95/22.49 • Flow check: Well Static, POOH to Shoe at
ASG SG 2.662 2.662 2.662 2.662 740m freely. Well static, no losses.
Additional Properties • Pumped 5m3 HiVis & Circulate hole clean,
Ca++ mg/L 360 400 380 360 Observed 15 m3/hr dynamic down hole
Mg ++ mg/L 24 24 24 24 losses.
• Flow check, Static losses 4.2 m3/h

Product Name Units Start Rec Used End Cost Solids Control Equipment Time
BARACARB 1200 25 kg BAG 109 109 Shaker Drilling
Screens Hrs 17.0
BARACARB 25 1 tonne BAG 3.000 3.000 Brandt\Cobra 80 80 80 80 19.0 Flow Check 2.5
BARACARB 5 25 kg BAG 192 192 Brandt\Cobra 80 80 80 80 19.0 Trips 2.5
BARA-DEFOAM W300 180 kg DRUM 1 1 Circulating 2.0
Brandt\Cobra 80 80 80 80 19.0
Coring
BARAZAN D 25 kg BAG 212 6 206
CutOffDrilling
BARITE 41 - 1.5 TON 1.5 TON BAG 8.000 3.000 5.000
Dir Work
BAROFIBRE 25 lbm BAG 56 56 Fishing
BAROLIFT 15 lbm BOX 62 62 Logging
BARO-TROL PLUS 50 lbm BAG 36 36 Hydrocyclone Cones Screens Hrs N. Up BOP
BDF-690 - 25 KG BAG 25 KG BAG 99 99 Desander 3- Plug Back
BENTONITE 1 tonne BAG 2.000 2.000 DESILTER 16 - Reaming
BXR L 55 Gal DRUM 4 4 Repair
CALCIUM CARBONATE FINE 1 tonne BAG 14.000 14.000 Other
CALCIUM CARBONATE COARSE 1 tonne BAG 9.000 9.000 Centrifuge Speed Feed Rate Hrs Total 24.0
CALCIUM CARBONATE MED 1 tonne BAG 7.000 7.000 Centrifuga 2800 0.00 15.0 Rotating 17.0
CAUSTIC SODA 25 kg BAG 94 2 92 ROP 9.9
CITRIC ACID 25 kg BAG 75 75 Dil Rate
CON DET E 200 kg DRUM 8 8 Fluid Volume Breakdown Primary Active Fluid: Gel/Polymer
DEXTRID LTE 25 kg BAG 165 10 155 Active m3 Additions m3 Losses m3
EP MUDLUBE 55 Gal DRUM 15 15 Annulus 71.36 Base Fluid Dumped
EZ SPOT 55 Gal DRUM 8 8 Pipe Cap 3.39 Drill Water 79.22 Transferred
EZ-MUD 25 kg CAN 26 26 Total Hole 131.56 Dewatering SCE -7.00
EZ-PLUG 40 lbm BAG 360 360 Active Pits 95.00 Sea Water Downhole -55.00
GEM GP 220 kg DRUM 4 4 Total Circ 169.74 Whole Mud Misc Other
LIME 25 kg BAG 40 40 Reserve* 153.41 Barite
MICA COARSE 25 kg BAG 30 30 Prev Vol* 362.33 Chemicals 0.43
MICA FINE 25 kg BAG 120 120 Net Change* 17.65 Other
MICROBIOCIDE 20 L PAIL 24 24 Total Vol* 379.97 Total 79.65 Total Losses -62.00
N-SEAL 30 lbm BAG 20 20
Active Fluid Type Vol m3 Deviation Information
Daily Products Cost $0.00 Total Daily Cost $0.00 Primary Active In Hole Reserve Survey Date
Cumulative Products Cost $0.00 Total Cumulative Cost $0.00 þ Gel/Polymer* 131.56 153.41 Survey MD m
AMRO MOSTAFA SALAMA SAMIR CHERFOUH ¨ KCl/Polymer/GEM 60.00 Survey TVD m
Baroid Representatives
¨ LCM pill #1 14.00 Angle º
Office Telephone ¨ LCM pill #2 2.50 Direction
Warehouse Telephone Horiz Displ. m
This report, the software, any data contained in this report and any interpretations based on this report are offered “as-is” and ”where-is.” There are no representations or warranties, expressed or implied, including implied warranties of merchantability and/or fitness for a particular purpose and or non-infringement. In no event will
Halliburton or its affiliates or suppliers be liable for any damages, whatsoever, including, but not limited to direct, indirect, consequential, incidental, special, punitive or exemplary damages (including, without limitation, loss of data, profits or use of hardware or software). Customer uses at their own risk.
Daily Drilling Fluid Report API No: BOQECR9AGCAT2VB4 Report No: 006
Date 12-02-2018 11:59:00 PM Well Name ZB-366 Spud Date 11-27-2018
Operator ENI DGS - 002,ZUBAIR Country Iraq Depth (MD/TVD) 983.00 / 982.00 m
Operator Rep Mohamed Miri,Pasquale Zingarelli State Al Basrah Rig Name KCADT-210
Contractor KCA DEUTAG DRILLING GMBH County Rig Activity Flow Check
Contractor Rep Mohamed Ali Field or Block Zubair Field Unit System WSE API(Copy)
Fluid Treatments

* Water well analysis: salinity: 30,000 mg/l -- Hardness: 2800 mg/l.


* Fresh water analysis: Salinity: 400 mg/l -- Hardness: 200 mg/l.

* Treated active system with Barazan to keep rheology in range .


* Treated active system with caustic soda and soda ash for alkalinity and hardness .
* Diluted system with pre-treated mud to keep level and parameters in range .
* @ 814m got 6 m3/hr partial down hole losse, cured by pumping 3 m3 80 ppb LCM pill
* @ 884m got 6 m3/hr partial down hole losse, cured by pumping 3 m3 80 ppb LCM pill
* while RIH @ 850m got 15 m3/hr severe down hole losse (3 m3/hr Static Losses), Pumped and spotted 17.5 m3 120 ppb LCM pil, Monitoring well
* Prepared 80 m3 Fresh Mud to compensate down hole lost volume.
* Start mixing new LCM pill @ 120 ppb in progress.

* Run all solid control equipment included the centrifuge to cut mud weight .
* Treated rheology by addition of Barazan-D as requested .

* Formation: Dammam Fm @ 736 m.


* Lithology: Dolomite

* Daily DHL: 55 m3, Total DHL: 55 m3

* Total no of HOC :12


* Total no of JSA : 07
Rig Activity

• Drill 12 1/4" Pilot Hole From 815m To 983m with controlled parameters, at 817m observed well losses +/- 6 m3/h Pump on fly 5 m3 80 ppLCM ( Total Lost 2 m3 ); After LCM Pill
No losses in well observed.
• Pumped 5m3 HiVis & Circulate hole clean
• Flow check: Well Static, POOH to Shoe at 740m freely. Well static, no losses.
• Pumped 5m3 HiVis & Circulate hole clean, Observed 15 m3/hr dynamic down hole losses.
• Flow check, Static losses 4.2 m3/h
• RIH freely @ 850 m. Running speed at 5min. each stand observed no volume return, 11 m3/hr Down hole losses.

• Spot 20 m3 LCM 120 ppb Displaced with 7 m3 of drilling mud, POOH F/850m To 500m & Flush String, down hole losses 12m3/h
• Flow check, fill up well after one/hr, 14 m3/h Static Losses.
• Total loss in the day 55 m3

This report, the software, any data contained in this report and any interpretations based on this report are offered “as-is” and ”where-is.” There are no representations or warranties, expressed or implied, including implied warranties of merchantability and/or fitness for a particular purpose and or non-infringement. In no event will
Halliburton or its affiliates or suppliers be liable for any damages, whatsoever, including, but not limited to direct, indirect, consequential, incidental, special, punitive or exemplary damages (including, without limitation, loss of data, profits or use of hardware or software). Customer uses at their own risk.