You are on page 1of 10

CALCULATIONS FOR FCGC

PIGGING OPERATION

Pipeline Fill Volume Calculations

Length: 5.00 m

Inside Diameter: 1,012.50 mm

Volume / m: 0.81 m3
= 805.16 L
= 212.70 gal

Volume / km: 805.16 m3


212,699.66 gal

Total Volume: 4.03 m3


1,063.50 gal

Flooding Calculations

Expected Pig Velocity: 0.10 m/s

Required Flow rate: 4.83 m3/min


= 4,830.93 L/min
= 1,276.20 gpm

Pigging time: 0.01 hrs


0.83 min
0.00 days

Volume pumped: 1,015.00 m3


268,134.68 gal

1.35 m3/min
Actual Flow rate: 81.00 m3/hr
356.63 gpm

Pig Location: 1.26 km

Pig Speed: 0.03 m/s

Estimated Time of Pig Arrival (ETA): (748.87) min

Estimated Time of Pig Arrival (ETA): (12.48) hours

Estimated Time of Pig Arrival (ETA): (0.52) days

ETA: 12/8/2021 20:05


INSTRUCTIONS
1) Enter numbers in GREEN boxes
2) Answers given in RED boxes
3) If you delete or alter something accidentally, close the program WITHOUT saving it.
4) It is recommended that you store a backup copy of this spreadsheet and work from a different copy

Important Information:
2,731
FILL VOLUME:

copy

REQUIRED FLOWRATE:

PIG LOCATION:

PIG SPEED:
PIGGING DURATION:
FCG Summary

Client Allseas Baker Hughes Job No. 619091 Operation SL Top Off
Project Sur de Texas-Tuxpan Client Contract No. 406820 Date Thursday, December 09, 2021
Location South Line Client Work Order No. - Time 5:21

PIPELINE DETAILS
Length 0.01 Km Inside Diameter 1,012.50 mm Total Volume 4.03 m3

OPERATION DETAILS
Total Pumped 1,015.00 m 3
Pig Location 1.26 km Average Pig Speed 0.03 m/s
Remaining volume (1,010.97) m3 Remaining Distance (1.26) km % Completed 25212.52 %
Flowrate 81.00 m /hr
3
Injection Pressure 19.16 barg

ETA for Pig #1


Remaining Hours (12.48) hours Remaining Days (0.52) days ETA 12/8/21 8:05 PM

You might also like