ENI - IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT


MOD WATER TREATMENT PROJECT
PIPELINE DESIGN BASIS

EX-DE 00 29/9/2020 Issued for Approval I.C A. Maleh M. Zeadan H.Hasan


Validity Rev.
Status Number Prepared Checked Approved Contractor Company
Date Description
Revision index by by by Approval Approval
Company logo and business name Project name Company Document ID

ZUBAIR OIL FIELD 252100DLPT00689


Eni Iraq b.v. DEVELOPMENT PROJECT

Job n.
Contractor logo and business name Contractor Document ID

Iraq General Company for Execution of Irrigation Projects


Contract n. 4600039760
Vendor logo and business name Vendor Document ID

Order n.
Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD -MOD WATER INTAKE AND
ONSHORE N.A. 1 of 26
TREATMENT PLANT
Document Title Supersedes N.
Supersedes by N.
PIPELINE DESIGN BASIS Plant area Plant unit
2521 N.A.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
5 of 26
EX-DE 00

REVISION HISTORY

Rev. Date Nr. of sheets Description


EX-DE 00 29-9-2020 26 ISSUED FOR APPROVAL

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
6 of 26
EX-DE 00

INDEX
INDEX ...........................................................................................................................................................................6
1 GENERAL ..............................................................................................................................................................8
INFORMATION ....................................................................................................................................................... 8
REFERENCE DOCUMENTS ...................................................................................................................................... 9
PROJECT BRIEFING: ................................................................................................................................................... 10
Interconnecting (Proposed) ................................................................................................................................. 11
2 Scope ................................................................................................................................................................. 12
2.1 Abbreviation list ............................................................................................................................................... 12
2.2 Reference project documentation................................................................................................................... 12
2.3 Reference codes, specifications and drawings ................................................................................................ 12
Reference Standards for Carbon Steel Pipelines: ............................................................................................... 12
Reference Standards for HDPE & DI: .................................................................................................................. 12
Following standards will be applied for HDPE Pipeline : ..................................................................................... 12
 ISO 4427 ...................................................................................................................................................... 13
Following standards will be applied for DI Pipeline : ........................................................................................... 13
3 Site informations............................................................................................................................................... 14
4 Surveys .............................................................................................................................................................. 20
4.1 Topographical Survey....................................................................................................................................... 20
4.2 Geotechnical Survey ....................................................................................................................................... 20
4.3 Routing basis of design .................................................................................................................................... 20
4.3.1 Topographical Vectorial Map................................................................................................................ 20
4.3.2 Digital Elevation Model (DEM).............................................................................................................. 21
5 Crossings and special points ............................................................................................................................. 22
6 Pipeline data ..................................................................................................................................................... 22
6.1 Battery limits .................................................................................................................................................... 22
6.2 Line pipe data................................................................................................................................................... 23
MOD / River Water Pipeline (CS) ......................................................................................................................... 23
MOD Pipeline (HDPE) ........................................................................................................................................... 23
(*) : Above dimension are preliminary ,subject to final Hidraulic Calculation report [ref 20]; ........................... 24
MOD Pipeline DI ( Alternative )............................................................................................................................ 24
The main MOD transfer DI pipelines data (under evaluation) are available in the Table 3, here below. ........... 24
This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
7 of 26
EX-DE 00

(*) : Above dimension are preliminary ,subject to final Hidraulic Calculation report [ref 20]; Position Welding25
7 Pipeline Sizing ................................................................................................................................................... 25
For the case of HDPE Pipelines folloowing standards will be applied: ................................................................ 26
 ISO 4427 ...................................................................................................................................................... 26
For the case of DI Pipelines folloowing standards will be applied: ..................................................................... 26
7.1 Pipeline bending .............................................................................................................................................. 26
7.2 Cathodic protection ......................................................................................................................................... 27
7.3 External coating ............................................................................................................................................... 27
7.4 Onshore line pipe depth of cover .................................................................................................................... 28

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
8 of 26
EX-DE 00

1 GENERAL

This document refers to IGC´s - IRAQ GENERAL COMPANY FOR EXECUTION OF


IRRIGATION PROJECTS (hereinafter CONTRACTOR) guidance covering the
Pipelines Desin Basis to be used on EIBV – MOD WATER TREATMENT PROJECT

The purpose of this specification is to provide the general requirements on the Pelines
Design of the MOD water transfer pipelines.

INFORMATION

ENI has been awarded the Zubair project for the development of an oil field (ZUBAIR
FIELD) in joint venture with Korea Gas ,BOC, and Missan Oil COMPANY (as state
partner), with eni as operator.

The Zubair Field is located in the southern area of Iraq, 20 km from Basra city (see
Figure-1):

Figure-1: Zubair Field

The field has been in operation for over 20 years and as such, there is significant
existing infrastructure including wells and surface facilities which include five
Degassing Stations (DGS) and a flow station.
This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
9 of 26
EX-DE 00

In this context, and reference to SOC Letter 53635 dated 7th of Aug 2016 a new MOD
Water Treatment Plant (WTP) is required in the Zubair Field to support the water
injection demand of the reservoir.

In the same line of action on BOC Letter 59773 dated August 16th 2017, it was
requested as top urgency to tender-out the project with reliable International
companies , including Iraqi companies.

The volume of processed water to be provided by CONTRACTOR from the water plant
up to COMPANY Facilities (DGS North and H IPF) is of 300 kbwpd , with possibility to
increase to 600kbwpd and through a conveyed Pipeline system sized for 600 kbwpd.

 The MOD Water Treatment Project comprises the following sub-systems:


 MOD Water Intake
 Water Treatment Plant (Pre Treatment & Final Treatment Plant)
 Interconnecting Pipeline System

REFERENCE DOCUMENTS

The following documents have to be referred in examining the present specification.

Reference Doc. N° Doc. Title


MOD Water Treatment Project - Basic
[01] 00252100DGRB00051
Engineering Design Data - MOD BEDD
MOD Water Treatment Project - Process
[02] 00252100DGRB00052
Design Premises
[03] 00250600BGSG09005 Site & Climatic Conditions
MOD Water Treatment Project - Plant Block
[04] 00252100DPFB00055
Flow Diagram
MOD Water Treatment Project - Process
[05] 00252100DPRB00067
Description & Operating Philosophy
[06] No Document Ref. Left in blank purposely

[07] No Document Ref. Zubair Field Water Injection Specification.


MOD route INTAKE-WTP-EIBV/ZFOD
[08] No Document Ref.
Facilities (Modified Route by Eni)
Final Soil Investigation Report for Hammar
[09] 00251200BARS95000
Mishrif DGS - phase 1.
MOD Water Treatment Project - Single Line
[10] 00251200DEFU00050
Diagram
MOD Water Treated Water Metering Skid &
[11] 00252100DPFB00056
Dist. Manifold BFD
MOD Treated Water Interconnecting Inlet
[12] 00251200DPFM00057
Water Injection Surge Tank HM New DGS.
MOD Treated Water Tank Interconnecting H
[13] 00251100DPFM00058
IPF Treated Produced Water P&ID .
This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
10 of 26
EX-DE 00

20” MOD Line Routing Overall Layout


[14] 00251100DTDG00059
Hammar IPF
24” MOD Line Routing Overall Layout
[15] 00251200DTDG00060
Hammar Mishrif New DGS.
24” MOD WaterLine – Piping General
[16] 00251200DTDG00061
Arrangement - Hammar Mishrif New DGS.
20” MOD Water Line- Piping General
[17] 00251100DTDG00062
Arrangement - Hammar IPF.
[18] 00251200DTDG00063 MOD Distribution Manifold

Carbon Steel SAW Line Pipe for River Water


[19] 00250600BTGA60150
Pipeline-Technical Data Sheet.
MOD Water Treatment Project - Pipeline
[20] 00252100DLSA00249 Hydraulic Study and Pipeline Size Verification
Report
MOD - MODIFICATION ROUTING 19 07 2020
[21]

PROJECT BRIEFING:

The MOD Water Treatment Project is composed by three main areas:

 MOD Intake
 Water Treatment plant (Pre-treatment & Final treatment Plant) inclusive of
Nanofiltration membranes system for sulphates removal and Aeration
Tower for Oxygen removal to meet water injection specification [7] at
COMPANY Facilities Hammar Mishrif Existing DGS , DGS North and
Hammar IPF.
 Pipeline System consisting on the Pipeline Network linking MOD Water
Treatment Plant outlet with Distribution Valve Station and to finally tie-in to
COMPANY Facilities.

Locations and Pipeline routing of the above said facilities, roughly depicted in the
following Figure 2-a .

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
11 of 26
EX-DE 00

Figure 20-a MOD WTP Location (INTAKE-WPTP-WFTP) Interconnecting Routing till Eibv-
ZFOD Facilities Water Injection Tanks.

Interconnecting (Proposed)

The following Units/Systems are foreseen to interconnect WI,WPTP, WFTP,


Hammar-Mishrif Existing DGS, Hammar-Mishrif New DGS [DGS N] and to
Hammar IPF:

 Interconnecting Pipes from MOD channel Intake Floating pumping station


to WPTP, through parallel buried pipelines , sized to handle up to
900kBWPD .
 Inter Stage pipelines of pre-treated water from WPTP to WFTP;
 Buried pipeline System (30” HDPE or other material suitable for the
operating condition) of treated water sized to convey 600kbwpd from
WFTP to Existing Hammar-Mishrif area [MOD Valve Distribution &
Metering Station], [8];
 One buried (24” HDPE or other material suitable for the operating
condition) of treated water from MOD Valve Distribution & Metering Station
to DGS N, tie-in inside DGS N included, [12];
 One buried (20” HPDE or other material suitable for the operating
condition) of treated water from MOD Valve Distribution & Metering Station
to Hammar IPF, tie-in inside IPF included, [13];

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
12 of 26
EX-DE 00

2 Scope

The scope of the document is to deal the basic design data for pipeline design relevant to Zubair
oil field.

2.1 Abbreviation list

ABBREVIATION DEFINITION
WGS World Geodetic System
UTM Universal Transverse Mercator
VMAP Vectorial Map
GIS Geographic Information System
DEM Digital Elevation Model
SRTM Shuttle Radar Topographic Mission

2.2 Reference project documentation

- 00252100DGRB00051 - “Basic engineering design data BEED”


- 00250600BGSG09005 - “Site and climatic conditions”
- 00250600BLDL82039 - “Zubair Field Overall Project Map”

2.3 Reference codes, specifications and drawings

Pipeline design shall be in accordance with the latest applicable Local Iraqi and International
codes, standards, regulations, permits and COMPANY Standards and par. 5 of doc. no.
00250600BGSG09000 “Basic Design Engineering Data”.
Pipeline design shall be in accordance to the codes and standards listed below:

Reference Standards for Carbon Steel Pipelines:

- ASME B31.4 "Pipeline Transportation system for Liquid Hydrocarbons and other Liquids"
- ASME B31.8 "Gas Transmission and Distribution piping system"
- API 5L “API Specification for Line pipe”
- API 1102 “Steel Pipelines Crossing Railroads and Highways”

Reference Standards for HDPE & DI:

Following standards will be applied for HDPE Pipeline :

 EN 12201-2
 ASTM 4710 This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
13 of 26
EX-DE 00

 ISO 4427

Following standards will be applied for DI Pipeline :

 BSEN 545
 ISO 2531
 ISO 10803

- EN 14161 “Petroleum and natural gas industries. Pipeline transportation systems”


- EN 14870-1 “Petroleum and natural gas industries - Induction bends, fittings and flanges for pipeline
transportation systems” – (Part 1: Induction bends)
COMPANY STANDARDS:
- 20550.PIP.COR.FUN ENI Functional Specification
- 20553.PIP.COR. FUN ENI Functional Specification
- 20332.SLI.SPM.FUN ENI Functional Specification
- 7486 PLI MEC SPC “Design criteria for buried pipelines”

- 7492 PLI MEC SPC “Field welding of cross-country pipelines fittings”


- 8046 PLI METSPC “Pipeline systems for transportation and distribution - special pieces for pipelines
with passage of spheres and/or pigs”
- 8047 PLI COR SPC “External coating survey of buried pipelines”
- 2776 PLI MEC SPC “Field welding of cross-country pipelines”
- 3516 PLI MEC SPC “Construction and installation of pipelines mechanical works”
- 3518 PLI MEC SPC “Preparation of the ‘as-built’ drawings”
- 6806 PLI MEC SPC “Pigging of on-shore pipelines”

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
14 of 26
EX-DE 00

3 Site informations

For site informations refer to project document:

00250600BGSG09005 Site and climatic condition

3.1 MOD Project coordinates

The list of Project relevant coordinate parameters are the following:


• Projection: Universal Transverse Mercator - Zone 38 N
• Spheroid: Clarke 1880
• Latitude: N from 42° to 48°
• Longitude: W from 312° to 318°.

It is to be noted that in order to transform the coordinates system into the Project coordinate
system WGS 84, is still missing the information about the datum.
For this reason it is not possible to identify the locations and allow the transformation in the WGS
84 datum used for the project.

It is assumed that among different possibilities, the most approximate transformation parameters
is the ones relevant to
• Datum D: Nahrwan 1967- (Qatar zone).

Hence, geographic transformation has been carried out using the geocentric translation method
using the following parameters:

dx= -250.2 dy=-153.09 dz=391.7

In any case residual shifting (with random components) are found, by photo-interpretation on
georeferenced images, when the system is transformed in WGS 84 (UTM 38N).
The methodology for location of wellheads on project maps is defined on document:

• 00250600BLRV82016 Geographic information and data management

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
15 of 26
EX-DE 00

3.2 Site Conditions

General description of the current state of the site

Fig. 1 – Topography of Iraq

Zubair Field is part of Mesopotamian plain. The geology of the Mesopotamian depression is
produced by a complex system of river channels, levees, flood plain, marshes, sabkha and deltas,
bordered on both sides by alluvial fans.

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
16 of 26
EX-DE 00

Fig. 2 – Geological map

From geological map above Zubair Field soil is prevailing located in alluvium soils.

Information on geological condition are taken from “Geology of Iraq” Edited by Saad Z. Jassim
and Jeremy C. Goff - Published by Dolin, Prague and Moravian Museum. Brno 2006.

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
17 of 26
EX-DE 00

3.2.1 Seismicity
For seismicity refer to project document:
• 00250600BGSG09005 Site and climatic condition

3.3 Maps of the area

Geographical data information available are:


• Topographical Vectorial Map
Vector dataset in VMAP1 compliant format, including the following topographical features:
boundaries, elevation, industry, population, transportation, hydrography, utilities, vegetation,
physiography.

• Satellite images
Reference Stereo WorldView-2 colour imagery (4 bands: Red, Green, Blue, NIR) and
(Panchromatic Band) acquired with cloud cover of 20% maximum and collection angle of 60 –
90 degrees.
Images cover the overall contractual Zubair Oil Field area acquired on November 2010.

WorldView-2 Imagery specification:


o 0.5m resolution
o Red, Green Blue and NIR imagery
o Suitable for scales down to 1:1 250
• Digital Elevation Model (DEM) and Digital Terrain Model (DTM) of the overall contractual
Zubair Oil Field area with a resolution of 2m.

WorldView-2 DEM specification:


o 2m resolution
o +/- 0.5m to 2m RMSE planimetric accuracy
o +/- 0.5m to 2m RMSE elevation accuracy
o Suitable for scales down to 1:5 000
o Contour interval = 1-2m

DEM to DTM conversion has been achieved using a semi-automated procedure to process
the WorldView-2 derived DEM down to a DTM (Digital Terrain Model or Bare Earth Model).
Elevations of real terrain will be retained while non-terrain features (such as buildings and
trees) will be identified, removed and interpolated across, giving an estimate of the
underlying terrain. Note in

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
18 of 26
EX-DE 00

areas of thick vegetation or where the height of the underlying terrain cannot be easily
distinguished, the accuracy of the final DTM cannot be guaranteed.

At last, data used to create the mosaic imagery will have been collected by the satellite on
different dates, each with different sensor viewing angles. Whilst we will do our best to create
a near seamless mosaic of the data some image mismatching will occur. This is the result of
the different look angles of the sensor and additional complications such as topography,
seasonal variation and sun angle (resulting shadow).

• Nautical Map
Nautical map “Khawr ‘Abd Allah and approaches to Shatt Al ‘Arab or Arvand Rud”, with sea
bed depths, from admiralty publications.

• Topographical Raster Map


Russian maps (raster images) including the following topographical features: boundaries,
elevation, industry, population, transportation, hydrography, utilities, vegetation, physiography.

• Thematic Maps
The main thematic maps used for the project are listed here below:
- Administrative boundaries provided by GADM (Global Administrative Areas);
- Oil and gas infrastructure provided by GROUP HIS (Information Handling Services Group)
and Wood Mackenzie Ltd;
- Areas under protection provided by The World Database on Protected Areas that is a
foundation dataset for conservation decision making;
- Main roads dataset derived from an international database called MAPCRUZIN;
- Rails dataset derived from an international database called DIVA-GIS;
- Airfield dataset derived from an international database named MAPROOM;
- Places dataset derived from an international database called MAPCRUZIN. Information
related to the airports and size of the urban areas;
- Demographic information data;
For the other thematic maps refer to project doc. no. 002506BFRV94700 “Web GIS and
metadata description report”.

3.4 Elevations

For site elevations refer to project document:


• 00250600BGSG09005 Site and climatic condition

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLPT00689 Status
19 of 26
EX-DE 00

3.5 Access Facilities to Site

For access facilities to Site refer to Zubair Field Overall Project Map:

• 00250600BLDL82039

3.6 Existing Pipelines Data

All the input data relevant to flowlines and pipelines are collected in the project document:
• 00250600BLDL82039 Zubair Field Overall Project Map

This document is property of Eni S.p.A. Exploration & Production Division.

It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
20 of 26
EX-DE 00

4 Surveys

All survey data gathered and computed will be implemented in the Project GIS data base and
utilized as input data for detail design. The GIS with the characteristics required to support all
project phase (i.e. Engineering and Construction) will be employed.

The GIS system used will be based on the scaleable technology of the ArcGIS suite of ESRI.

The GIS data base shall be implemented during the execution of the project. All the physical
features and attributes nearby the facilities such as power line poles, foreign line crossings,
bridges, roads, permanent structures, etc. surveyed in next stage shall be included in the
database.

4.1 Topographical Survey

Al the geographic information are included in the project geodatabase and managed by ArcGis
software. Project topographic survey shall be conducted as indicated in the doc.
00250600BLSS82020 “specification for topographic survey”, and the

4.2 Geotechnical Survey

The soil data used are the ones available on the project geological literature.

4.3 Routing basis of design

Routing of pipeline shall be done on the following supporting maps:


4.3.1 Topographical Vectorial Map
Vector dataset in VMAP1 compliant format, including the following topographical features:
boundaries, elevation, industry, population, transportation, hydrography, utilities, vegetation,
physiography.

Satellite images Reference Stereo WorldView-2 colour imagery (4 bands: Red, Green, Blue, NIR)
and (Panchromatic Band) covering the overall contractual Zubair Oil Field area acquired on
November 2010.
This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
21 of 26
EX-DE 00

4.3.2 Digital Elevation Model (DEM)


and Digital Terrain Model (DTM) of the overall contractual Zubair Oil Field area with a resolution of
2m.

Routing activity of existing pipelines has been based, at present, on photointerpretation of satellite
images and on the time (date) on which they are taken, COMPANY instructions (MOD -
MODIFICATION ROUTING 19 07 2020) ref [21]. Site verification and planned surveys in next phase
will implement and update the actual level of information for final routing.

Further and improved design level especially starting and ending point, such as final location of
pipelines , existing site facilities appach and final layout of plant that could modify the pipelines
route.

Pipeline shall be routed considering the shortest connection length; however when profitable the
pipeline shall be routed preferably in parallel to existing oil/gas pipelines and other linear service
(roads, railways, channels, etc.) in order to optimize the land use.

 to lay the new pipeline aside preferential corridors or linear infrastructures (pipelines or
roads) existing in the affected country when these ones have favourable direction.

 to run the new pipeline as far as possible from:

o dwellings/ public centres in order to minimize the possible impact on people

o areas where are carried out activities which could cause adverse affected on the new
flowlines and trunklines in order to minimize them.

Clearance shall be adopted for this purpose in routing development.

When pipeline is planned to be built in the same work phase of an existing pipeline route, the design
activities will assume that they will be laid in the same trench, when construction phasing will be
defined this issue shall be reconsidered. Clearance shall be 0,5 m for small size and 1,0 m large
diameter.

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
22 of 26
EX-DE 00

5 Crossings and special points

The crossings of roads, infrastructures and water streams shall be reduced, in terms of numbers
and affected crossed length as much as possible.
The crossing of areas that appear with high water table, or where soil erosion due to groundwater
effect, shall be minimized as much as possible.

Crossings of rivers, canals and streams shall be designed to ensure integrity of the pipeline under
all conditions of the water flow. The minimum depth of cover shall be 1.5 m below the calculated
scour depth. For the major river crossings the actual depth of cover shall be determined through
the Detailed Engineering Phase field and office prepared hydrological investigations.
It shall be advisable if pipeline is constructed on diferent material than CS to use upstream and
downstream of major Crossing (Water Canal, Railroad and motorway) Isolating Valve´s Concrete
Pits to ensure mitigation measures in case of rupture or pipeline failure under the major Crossing.

In case crossing of existing structutures where open cutting is not advisable (i.e. Water Canal,
Railroad , motorway and main asphalt roads), for all pipeline with size diam.<16", trenchless
methodology is considered (i.e. Horizontal Drilling).
Trenchless crossing of large diameter pipeline >16” (i.e. export pipeline) shall be performed by
installation of adequate casing pipe to house the carrier pipeline.

6 Pipeline data

6.1 Battery limits

Pipelines:

The present document deal with the pipeline defined as the “off plot” section included between
the flanges of insulating Valves Pits at each Existing Facility (i.e DGS North , Hammar IPF). These
concrete valves pits shall be located outside the facilities adjacents to their fencing system.

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
23 of 26
EX-DE 00

6.2 Line pipe data

Here below have been summarized the main design condition of each project pipelines covered
by this specification.

MOD / River Water Pipeline (CS)

The MOD / River water pipeline data are available in the Table 1, here below.

Table 1: MOD / River water pipelines data


Size 48” 24” 26"

Rating 300 300 300

Design Temp. (°C) 85 85 85 85 85 85

Operating Temp. (°C) 60 60 60 60 60 60

Design Press. (barg) 40 40 40 40 40 40

Oper. Press. (barg) 25 25 25 25 25 25

Material (API 5L) X60 X60 X60 X60 X60 X60

Safety Factor SF 0.6 0.72 0.6 0.72 0.6 0.72

Calculated Thickness 9.8 8.2 4.9 4.1 5.3 4.4


(mm)

CA (mm) 3 3 3 3 3 3

Commercial Thickness 14.3 14.3 8.7 7.9 8.7 8.7


(mm)

MOD Pipeline (HDPE)

The main MOD transfer pipelines data are available in the Table 2, here below.

Table 2: MOD transfer pipelines data

Size 800 630 500

Rating PN10 PN10 PN10


This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
24 of 26
EX-DE 00

Design Temp. (°C) 26 26 26 26 26 26

Operating Temp. (°C) 26 26 26 26 26 26

Design Press. (barg) 7.4 7.4 7.4 7.4 7.4 7.4

Oper. Press. (barg) 7.4 7.4 7.4 7.4 7.4 7.4

Material PE100 PE100 PE100 PE100 PE100 PE100

Standard Sizee Ratio 17 17 17 17 17 17


(SDR)

Calculated Thickness TBC TBC TBC TBC TBC TBC


(mm)

CA (mm) 0 0 0 0 0 0

Commercial Thickness 47.4 47.4 37.4 37.4 29.7 29.7


(mm)
(*) : Above dimension are preliminary ,subject to final Hidraulic Calculation report [ref
20];

MOD Pipeline DI ( Alternative )

The main MOD transfer DI pipelines data (under evaluation) are available in the Table
3, here below.

Table 3: MOD transfer pipelines data

Nominla Size DN (mm) 800 600 500

Class C25 C30 C30

Design Temp. (°C) 26 26 26 26 26 26

Operating Temp. (°C) 26 26 26 26 26 26

Design Press. (barg) 7.4 7.4 7.4 7.4 7.4 7.4

Allowable Operating 25 25 30 30 30 30
Press.per Class. (barg)
Yield Stength (MPA) 300 300 300 300 300 300

Tensile Strength Min 420 420 420 420 420 420


(MPA)

Calculated Thickness TBC TBC TBC TBC TBC TBC


(mm)

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
25 of 26
EX-DE 00

CA (mm) 0 0 0 0 0 0

Commercial Thickness 9.6 9.6 8.7 8.7 7.5 7.5


(mm)
(*) : Above dimension are preliminary ,subject to final Hidraulic Calculation report [ref
20]; Position Welding

7 Pipeline Sizing

Pipeline stress verification and constructability consideration will be given to selection of the pipe
wall thickness to prevent pipe buckling and collapsing during installation and operation.
Basically, the pipe-wall thickness for CS Pipelines is designed on pressure containment
requirement (para 403.2.1 of ASME B31.4 and para 841.1.1(a) of B31.8) taking into account of
the specified Design Factor.
As per applicable Code requirement, WT sizing is carried out using DF 0,72 for the pipelines in
all cross country section and DF 0,6 for main road crossing.

Both ASME B31.4 and B31.8 require the calculated wall thickness (as mentioned above), shall
satisfy the stress-analysis requirements (or flexibility analysis) in section 402 and section 833,
respectively.

As for stress analysis verifications, the following effects are taken into account for longitudinal
stresses:

• internal pressure,
• own weights,
• temperature difference between pipeline operation and construction,
• external loads that can result on the pipeline.

Other longitudinal stress arising on the pipeline for laying on curved profile of bottom trench is
considered together with the other internal and external loads.

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
26 of 26
EX-DE 00

As required by applicable codes, nominal and corroded pipe size is considered for combined
stress calculations.

Combined stress check taking into account of the bending stress due to a practical value of
minimum bending radius for laying in large-curved trench bottom profile, will be performed and
WT increased when necessary.

As concern the trunklines a length of 50 m before plant approaches has been considered with a
DF 0,6 for WT sizing.

For the case of HDPE Pipelines folloowing standards will be applied:

 EN 12201-2
 ASTM 4710
 ISO 4427

For the case of DI Pipelines folloowing standards will be applied:

 BSEN 545
 ISO 2531
 ISO 10803

7.1 Pipeline bending

The pipeline vertical and horizontal direction changes are carried out with “bent pipe section” to
fit the pipeline route and could be fabricated in different way as follows:

Elastic Bends

Where possible changes in direction shall be made using elastic bends. The minimum elastic
bend radius will be calculated based on the maximum permissible combined stress as per ASME
B 31.4 and B.31.8. Bending stresses due to elastic bending shall be considered additive to
circumferential and longitudinal pressure and thermal stresses.

Field Cold Bends

The minimum allowable radius for cold bends (field cold bending machine bends) shall not be less
than 40 times the nominal diameter of pipe. The bend shall be fabricated in the construction yard,

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
27 of 26
EX-DE 00

and they are exactly defined during pipe stringing. Suitable cold bending machine has to be
employed by Construction Contractor.

Pre-fabricated Bends (hot induction bends)

The minimum bend radius shall be 5 or 7 times the Nominal diameter of the pipe.

Detail design drawing will indicate each location of prefabricated bend that are purchased in
advance. Prefabricated bends are specified, attention will be paid in the cases where the bent
pipeline could create stress problem of behaviours for thermal and pressure displacements and
soil restraint action at the bend.
Straight extension of the bends shall be 1.2 m (1 DN) for the large diameter pipe and 0.5 m for
pipeline less than 16”.

7.2 Cathodic protection

The corrosion protection of buried carbon steel pipelines from environmental corrosion shall be
achieved by means of a proper coating supplemented by impressed current CP system(s).
Cathodic protection (CP) system(s) shall be designed and installed to protect buried off-plot
pipelines from environmental corrosion, either through impressed current or sacrificial anodes
CP application. The CP design shall be developed according to Doc. No. 00250600BERB47000
"CP BASIS OF DESIGN".

7.3 External coating

The coating and paint systems shall comply with the requirements of the following Eni Functional
Specifications:
- 20550.PIP.COR.FUN
- 20553.PIP.COR.FUN
Pipelines shall follow project recommnedations refer to document number 00252100DLST00160
- “Specification for External Coation of Buried Pipelines “

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
28 of 26
EX-DE 00

7.4 Onshore line pipe depth of cover

Pipeline shall be buried for its whole length.


In general, minimum requirement for depths of cover relevant to oil pipelines are defined in EN
14161, however considering the category of the pipeline under design, the adoption of a minimum
standard cover increased at least to a dimension equal to a pipeline diameter, is advisable.

The table below summarizes the minimum cover guidelines to be applied to the pipeline:

Location Minimum Cover (m)


Standard cross country 1.0
Rocky areas 0.9
Special cases
- Closeness to populated and areas
- Presence of buried infrastructure in the
surrounding
1.5
- Agricultural areas where heavy
equipment could operate
Waterway crossings 1.5
Road crossing 1.5

Where there is an increased risk of damage or interference from third parties, additional protective
measures shall be adopted. Protection could be one or more of the following:

- Additional depth of cover


- Pipeline marker tape
- Protective concrete slabs or mass concrete
- Increased pipe wall thickness
- Concrete coating

These design allocations will be identified on the pipeline alignment sheets.

Crossings of rivers, canals and streams shall be designed to ensure integrity of the pipeline under
all conditions of the water flow. The minimum depth of cover shall be 1.5 m below the calculated

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________
Company Logo and business name Company Identification Revision Index Sheet of Sheets
Validity Rev.N.
252100DLST00160 Status
29 of 26
EX-DE 00

scour depth. For the major river crossings the actual depth of cover shall be determined through
the Detailed Engineering Phase field and office prepared hydrological investigations.

This document is property of eni iraq b.v.

It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.

_________________________________________________________________________________________

You might also like